The SLS 2.0 Operations Manager is [Felix Armborst](mailto:felix.armborst@psi.ch) and has the following mandate:
|
||||
|
||||
* **Develop and steer user operation and shutdown plans**
|
||||
* Coordinate with all stakeholders including other accelerator facilities at PSI
|
||||
* **Develop and steer overall operation, development and shutdown schedule**
|
||||
* Coordinate with all stakeholders including operations and other accelerator facilities at PSI
|
||||
* Annual DUO planning
|
||||
* Report all relevant information including short term machine and beamline development plans at weekly operations meetings
|
||||
* **Develop and steer beamline and machine development plans**
|
||||
* Coordinate with machine groups on equipment, control and SW readiness and validation testing
|
||||
* Coordinate with beam dynamics groups on machine development activities
|
||||
@@ -17,12 +18,13 @@ The SLS 2.0 Operations Manager is [Felix Armborst](mailto:felix.armborst@psi.ch)
|
||||
* Preparing and conducting theoretical and practical operator exams
|
||||
* **Handling of any schedule or technical issues**
|
||||
* Analyse performance impact
|
||||
* Develop mitigation measures
|
||||
* Develop mitigation measures in collaboration with responsible groups
|
||||
* Report possibly resulting investment requirements to machine coordinator
|
||||
* **Develop and maintain deployment plans for interfaces, high level SW and equipment integration**
|
||||
* Follow up testing and update planning
|
||||
* **Prepare and analyse the annual SLS 2.0 operations statistics**
|
||||
* **Prepare and analyse the SLS 2.0 operations statistics**
|
||||
* Report the annual SLS 2.0 operations statistics at the European Synchrotron Light Sources Workshop (ESLS)
|
||||
* Write SLS part of the annual Report "Operation of the PSI Accelerator Facilities"
|
||||
* Write SLS 2.0 part of the annual report "Operation of the PSI Accelerator Facilities"
|
||||
|
||||
The SLS 2.0 Machine Coordinator is [Jonas Kallestrup](mailto:jonas.kallestrup@psi.ch) and has the following mandate:
|
||||
|
||||
|
||||
@@ -303,9 +303,10 @@
|
||||
|
||||
<p>The SLS 2.0 Operations Manager is <a href="mailto:felix.armborst@psi.ch">Felix Armborst</a> and has the following mandate:</p>
|
||||
<ul>
|
||||
<li><strong>Develop and steer user operation and shutdown plans</strong><ul>
|
||||
<li>Coordinate with all stakeholders including other accelerator facilities at PSI</li>
|
||||
<li><strong>Develop and steer overall operation, development and shutdown schedule</strong><ul>
|
||||
<li>Coordinate with all stakeholders including operations and other accelerator facilities at PSI</li>
|
||||
<li>Annual DUO planning</li>
|
||||
<li>Report all relevant information including short term machine and beamline development plans at weekly operations meetings</li>
|
||||
</ul>
|
||||
</li>
|
||||
<li><strong>Develop and steer beamline and machine development plans</strong><ul>
|
||||
@@ -322,16 +323,17 @@
|
||||
</li>
|
||||
<li><strong>Handling of any schedule or technical issues</strong><ul>
|
||||
<li>Analyse performance impact</li>
|
||||
<li>Develop mitigation measures</li>
|
||||
<li>Develop mitigation measures in collaboration with responsible groups</li>
|
||||
<li>Report possibly resulting investment requirements to machine coordinator</li>
|
||||
</ul>
|
||||
</li>
|
||||
<li><strong>Develop and maintain deployment plans for interfaces, high level SW and equipment integration</strong> <ul>
|
||||
<li>Follow up testing and update planning</li>
|
||||
</ul>
|
||||
</li>
|
||||
<li><strong>Prepare and analyse the annual SLS 2.0 operations statistics</strong><ul>
|
||||
<li><strong>Prepare and analyse the SLS 2.0 operations statistics</strong><ul>
|
||||
<li>Report the annual SLS 2.0 operations statistics at the European Synchrotron Light Sources Workshop (ESLS)</li>
|
||||
<li>Write SLS part of the annual Report "Operation of the PSI Accelerator Facilities"</li>
|
||||
<li>Write SLS 2.0 part of the annual report "Operation of the PSI Accelerator Facilities"</li>
|
||||