The SLS 2.0 Operations Manager is [Felix Armborst](mailto:felix.armborst@psi.ch) and has the following mandate:
-* **Develop and steer user operation and shutdown plans**
- * Coordinate with all stakeholders including other accelerator facilities at PSI
+* **Develop and steer overall operation, development and shutdown schedule**
+ * Coordinate with all stakeholders including operations and other accelerator facilities at PSI
* Annual DUO planning
+ * Report all relevant information including short term machine and beamline development plans at weekly operations meetings
* **Develop and steer beamline and machine development plans**
* Coordinate with machine groups on equipment, control and SW readiness and validation testing
* Coordinate with beam dynamics groups on machine development activities
@@ -17,12 +18,13 @@ The SLS 2.0 Operations Manager is [Felix Armborst](mailto:felix.armborst@psi.ch)
* Preparing and conducting theoretical and practical operator exams
* **Handling of any schedule or technical issues**
* Analyse performance impact
- * Develop mitigation measures
+ * Develop mitigation measures in collaboration with responsible groups
+ * Report possibly resulting investment requirements to machine coordinator
* **Develop and maintain deployment plans for interfaces, high level SW and equipment integration**
* Follow up testing and update planning
-* **Prepare and analyse the annual SLS 2.0 operations statistics**
+* **Prepare and analyse the SLS 2.0 operations statistics**
* Report the annual SLS 2.0 operations statistics at the European Synchrotron Light Sources Workshop (ESLS)
- * Write SLS part of the annual Report "Operation of the PSI Accelerator Facilities"
+ * Write SLS 2.0 part of the annual report "Operation of the PSI Accelerator Facilities"
The SLS 2.0 Machine Coordinator is [Jonas Kallestrup](mailto:jonas.kallestrup@psi.ch) and has the following mandate:
diff --git a/mkdocs/site/mandate/index.html b/mkdocs/site/mandate/index.html
index 80bccf8..a7218c6 100644
--- a/mkdocs/site/mandate/index.html
+++ b/mkdocs/site/mandate/index.html
@@ -303,9 +303,10 @@
The SLS 2.0 Operations Manager is Felix Armborst and has the following mandate:
-- Develop and steer user operation and shutdown plans
-- Coordinate with all stakeholders including other accelerator facilities at PSI
+- Develop and steer overall operation, development and shutdown schedule
+- Coordinate with all stakeholders including operations and other accelerator facilities at PSI
- Annual DUO planning
+- Report all relevant information including short term machine and beamline development plans at weekly operations meetings
- Develop and steer beamline and machine development plans
- Handling of any schedule or technical issues
- Analyse performance impact
-- Develop mitigation measures
+- Develop mitigation measures in collaboration with responsible groups
+- Report possibly resulting investment requirements to machine coordinator
- Develop and maintain deployment plans for interfaces, high level SW and equipment integration
- Follow up testing and update planning
-- Prepare and analyse the annual SLS 2.0 operations statistics
+- Prepare and analyse the SLS 2.0 operations statistics
- Report the annual SLS 2.0 operations statistics at the European Synchrotron Light Sources Workshop (ESLS)
-- Write SLS part of the annual Report "Operation of the PSI Accelerator Facilities"
+- Write SLS 2.0 part of the annual report "Operation of the PSI Accelerator Facilities"
diff --git a/mkdocs/site/search/search_index.json b/mkdocs/site/search/search_index.json
index 0c10f46..1362744 100644
--- a/mkdocs/site/search/search_index.json
+++ b/mkdocs/site/search/search_index.json
@@ -1 +1 @@
-{"config":{"indexing":"full","lang":["en"],"min_search_length":3,"prebuild_index":false,"separator":"[\\s\\-]+"},"docs":[{"location":"","text":"SLS 2.0 Operations Management The following mailing lists have been prepared for the SLS 2.0 Operations Management: PSI.SLS-MDM (SLS 2.0 machine experts are the members) PSI.SLS-UOM (SLS 2.0 beamline experts are the members) Please forward membership requests to felix.armborst@psi.ch . There are two associated meeting series: Machine Development Meeting (MDM) Focused on machine development shifts for the SLS 2.0 Target audience are machine experts and interested beamline experts Reports on machine development shifts and operation Requests for and planning of upcoming machine development shifts The agendas of these meetings are available on indico User Operations Meeting (UOM) Focused on the beamline development shifts for SLS 2.0 Target audience are beamline experts and interested machine experts Reports on beamline development shifts and operation Requests for and planning of upcoming beamline development shifts Requests for and planning of upcoming user operations shifts The agendas of these meetings are available on indico Documentation on how to create such a website is available on gitlab .","title":"General information"},{"location":"mandate/","text":"Mandate **Draft - Not Yet Final** The SLS 2.0 Operations Manager is Felix Armborst and has the following mandate: Develop and steer user operation and shutdown plans Coordinate with all stakeholders including other accelerator facilities at PSI Annual DUO planning Develop and steer beamline and machine development plans Coordinate with machine groups on equipment, control and SW readiness and validation testing Coordinate with beam dynamics groups on machine development activities Coordinate with beamline groups on beamline development activities Develop and steer operator training Defining theoretical and practical requirements for obtaining different levels (A-, and B-Operator) Preparing and conducting theoretical and practical operator trainings Preparing and conducting theoretical and practical operator exams Handling of any schedule or technical issues Analyse performance impact Develop mitigation measures Develop and maintain deployment plans for interfaces, high level SW and equipment integration Follow up testing and update planning Prepare and analyse the annual SLS 2.0 operations statistics Report the annual SLS 2.0 operations statistics at the European Synchrotron Light Sources Workshop (ESLS) Write SLS part of the annual Report \"Operation of the PSI Accelerator Facilities\" The SLS 2.0 Machine Coordinator is Jonas Kallestrup and has the following mandate: Follow up latest developments in Beam Dynamics simulations and measurements, analyse performance impact and steer studies and mitigations Develop measurement techniques for hitherto poorly quantified parameters Report to Bereichsleitungssitzung The SLS 2.0 Machine Responsible GFA is Hans Braun and has the following mandate: The SLS 2.0 Machine Responsible PSD is Frithjof Nolting and has the following mandate: The SLS 2.0 Area Coordinator is Juri Honegger and has the following mandate:","title":"Mandate"},{"location":"mdm/minutes/","text":"Minutes of the SLS 2.0 Machine Developement Meetings Andreas Anuschka Boris Chris Cigdem Felix Goran Jeff Jonas Lukas Michael Paolo Pedro Roger Simona Thomas Volker 20/09/2023 Participants: Felix Armborst, Simona Bettoni, Michael B\u00f6ge, Christopher H. Gough, Jonas Kallestrup, Thomas Geoffrey Lucas, Andreas L\u00fcdeke, Anuschka Pauluhn, Volker Schlott, Lukas Stingelin, Jean-Francois Thomsen Reports Machine Operation This year was the worst year in the history of SLS operation. With 92% it was worse than first year with 94 %. With 99.6% Availability in the last weeks without major outages. Beamlosses partly occured due to beamlines Electron source pulser tests second pulse from new board amended pulse length shorter at lower charge ~100 pC was in operation the last weeks observed energy stability seems to have more jitter than old pulser \u2192 diagnosed to be problem of modulator board measured to feature jitter of ~12ps compared to old one with ~20ps injection rate to booster rather low Debye commissioning measured entire night with -1.3 mm bump @ 85 mA very useful for debugging beamline photo of monochromatic photon beam at end of beamline Problem with old frontend of IR beamline mirror moved and probably tilted large orbit bump and low current required to mitigate vacuum interlocks party today Beam size optimization short unsatisfying shift wrong file loaded in shift before corrected in this shift \u2192 got below 10 um Test of new FOFB bug identified (corrector matrix transposed accidentally) seems to work well now Linac radiation mapping measured radiation dose, waiting for report measured dose rates higher than old measurements with multibunch mode measurements were performed at higher charge than required for operation Single bunch measurements results in RF elog measured zero current bunch length seems to fit prediction within 1% microwave instability confirmed at 3.4 mA somewhat smaller than model (4 mA) maybe due to missing impedance ID and orbit code to compensate for undulator gap change kick was tested working code output pdf in elog local correction with 4 correctors QT GUI not yet working on Bay 4 next time with only local correctors took response matrix data 150 samples for machine learning model X04SA-ID orbit optimization Goal was to callibrate new SiC XBPMs in X04 and compare to existing frontend XBPMs at X04 and X11 beamline was operated during MD shift time was short and current reduced for Debye SU measurements X11 nobody was available to help BPM tild measurement last bpm rotation measurement long ago, lots of HW exchange since then tilt error lets horizontal dispersion appear vertical, making vertical dispersion suppression difficult shift was successful Operator training 5 participants, well recieved explained LINAC setup including different bunchers SME and longitudinal loss monitors with persistent mode showing minimum, maximum, current and average loss worked nicely LLM give nice unique signature of current state of injection losses good to identify drifts and problems early more power in subharmonic prebuncher (SPB) would be good (stronger gradient enables shorter bunch which is good for further bunching and acceleration in 3 GHz structures) idea is to give operators tools/cookbook to double check setup from RF group and correct for long term drifts Requests Time Description Participants Monday, 25.09.2023 \u2060 \u2060 10:00 - 14:00 Test of SLS 2.0 MBFB and FPFB Pedro, Boris 14:00 - 18:00 Test New SLS2 FOFB Goran, Boris 18:00 - 24:00 Machine Learning for SLS 2.0: Train Model Simona Tuesday, 26.09.2023 \u2060 \u2060 00:00 - 07:00 Reserve 07:00 - 18:00 BD Collaboration, Coupling / Round Beam Jonas, Felix, Cigdem, Paul Goslawski, Peter Kuske 18:00 - 22:00 Investigation of the Super-3HC failure and impedance of the vacuum-components Lukas, Operator 22:00 - 24:00 BD Collaboration, TRIBs and Coupling / Round Beam Jonas, Felix, Cigdem, Paul Goslawski, Peter Kuske Wednesday, 27.09.2023 \u2060 \u2060 00:00 - 07:00 BD Collaboration, TRIBs and Coupling / Round Beam Jonas, Felix, Cigdem, Paul Goslawski, Peter Kuske 07:00 - 14:00 Robinson stability measurements at lower current (with streak-cam) Lukas 14:00 - 20:00 SLS 2.0 Injection Chain Setup for 2.7 GeV Jonas, Thomas 20:00 - 24:00 50 mA Storage Ring Kicker Matching Chris, Martin, Jonas Software Development for BPM TbT Data Jan \u2060 Thursday, 28.09.2023 \u2060 \u2060 00:00 - 02:00 Test on influence of ELM brake for servo motor on the stored beam with and without FOFB Thomas Schmidt, Marc Br\u00fcgger 02:00 - 06:00 Reserve 06:00 - 07:00 Test the booster inj/ext with the upgraded timing system and fine delay feature, tests on the timing master software with beam Alexander, Romain 08:00 - 12:00 Machine Learning for SLS 2.0: Test Model Simona 12:00 - 14:00 Optimizing the Beam Size to Lifetime Ratio Cigdem, Simona 14:00 - 22:00 Beam Size Minimization Measurements Michael, Cigdem 22:00 - 24:00 Reserve Friday, 29.09.2023 \u2060 \u2060 00:00 - 06:00 Reserve 06:00 - 07:00 Test the booster inj/ext with the upgraded timing system and fine delay feature, tests on the timing master software with beam Alexander, Romain 07:00 - 11:00 Test New SLS2 FOFB Goran, Boris Software Development for Emittance Measurement Jan \u2060 11:00 - 15:00 Test of SLS 2.0 MBFB and FPFB Pedro, Boris 15:00 - 15:30 Test Spare PCT Hardware Cigdem 15:30 - 19:30 Optimizing the Beam Size to Lifetime Ratio Cigdem, Simona 19:30 - 24:00 Reserve Saturday, 30.09.2023 \u2060 \u2060 00:00 - 07:30 Reserve 07:30 - 08:00 Ceremonial Beam Dump GFA In parallel, 25. - 30.09.2023 \u2060 \u2060 High power tests of coupler and power transition in the teststand (should not affect operation) Lukas , Roger AOB Communication Strategy and Plan for SLS 2.0 At the last SRDG meeting ( https://indico.psi.ch/event/15040/ ) the new SLS 2.0 communication strategy was mentioned. Some example tweets are linked below. All those present at this meeting agree that it is not a good idea to rename the well known name \"SLS 2.0\" which stands for it being the successor to the existing SLS back to the name of its predecessor after commissioning. End of SLS Party (PSD) Monday, 25 th September, 16:00 - 18:00 Place: tent at the SLS (when facing the SLS entrance, the tent is located on the left hand side) Please register by Monday, 18 th September 2023 in https://indico.psi.ch/e/SLS-party SLS Letztes Elektron vor dem Upgrade Z'Morge (GFA) Saturday, 30 th September, 07:30 - 09:30 Place: Foyer in front of the Control Room (WGBG) https://indico.psi.ch/event/15122/ SLS 2.0 related tweets posted by the official PSI twitter/X account","title":"MDM minutes"},{"location":"mdm/minutes/#20092023","text":"Participants: Felix Armborst, Simona Bettoni, Michael B\u00f6ge, Christopher H. Gough, Jonas Kallestrup, Thomas Geoffrey Lucas, Andreas L\u00fcdeke, Anuschka Pauluhn, Volker Schlott, Lukas Stingelin, Jean-Francois Thomsen Reports Machine Operation This year was the worst year in the history of SLS operation. With 92% it was worse than first year with 94 %. With 99.6% Availability in the last weeks without major outages. Beamlosses partly occured due to beamlines Electron source pulser tests second pulse from new board amended pulse length shorter at lower charge ~100 pC was in operation the last weeks observed energy stability seems to have more jitter than old pulser \u2192 diagnosed to be problem of modulator board measured to feature jitter of ~12ps compared to old one with ~20ps injection rate to booster rather low Debye commissioning measured entire night with -1.3 mm bump @ 85 mA very useful for debugging beamline photo of monochromatic photon beam at end of beamline Problem with old frontend of IR beamline mirror moved and probably tilted large orbit bump and low current required to mitigate vacuum interlocks party today Beam size optimization short unsatisfying shift wrong file loaded in shift before corrected in this shift \u2192 got below 10 um Test of new FOFB bug identified (corrector matrix transposed accidentally) seems to work well now Linac radiation mapping measured radiation dose, waiting for report measured dose rates higher than old measurements with multibunch mode measurements were performed at higher charge than required for operation Single bunch measurements results in RF elog measured zero current bunch length seems to fit prediction within 1% microwave instability confirmed at 3.4 mA somewhat smaller than model (4 mA) maybe due to missing impedance ID and orbit code to compensate for undulator gap change kick was tested working code output pdf in elog local correction with 4 correctors QT GUI not yet working on Bay 4 next time with only local correctors took response matrix data 150 samples for machine learning model X04SA-ID orbit optimization Goal was to callibrate new SiC XBPMs in X04 and compare to existing frontend XBPMs at X04 and X11 beamline was operated during MD shift time was short and current reduced for Debye SU measurements X11 nobody was available to help BPM tild measurement last bpm rotation measurement long ago, lots of HW exchange since then tilt error lets horizontal dispersion appear vertical, making vertical dispersion suppression difficult shift was successful Operator training 5 participants, well recieved explained LINAC setup including different bunchers SME and longitudinal loss monitors with persistent mode showing minimum, maximum, current and average loss worked nicely LLM give nice unique signature of current state of injection losses good to identify drifts and problems early more power in subharmonic prebuncher (SPB) would be good (stronger gradient enables shorter bunch which is good for further bunching and acceleration in 3 GHz structures) idea is to give operators tools/cookbook to double check setup from RF group and correct for long term drifts Requests Time Description Participants Monday, 25.09.2023 \u2060 \u2060 10:00 - 14:00 Test of SLS 2.0 MBFB and FPFB Pedro, Boris 14:00 - 18:00 Test New SLS2 FOFB Goran, Boris 18:00 - 24:00 Machine Learning for SLS 2.0: Train Model Simona Tuesday, 26.09.2023 \u2060 \u2060 00:00 - 07:00 Reserve 07:00 - 18:00 BD Collaboration, Coupling / Round Beam Jonas, Felix, Cigdem, Paul Goslawski, Peter Kuske 18:00 - 22:00 Investigation of the Super-3HC failure and impedance of the vacuum-components Lukas, Operator 22:00 - 24:00 BD Collaboration, TRIBs and Coupling / Round Beam Jonas, Felix, Cigdem, Paul Goslawski, Peter Kuske Wednesday, 27.09.2023 \u2060 \u2060 00:00 - 07:00 BD Collaboration, TRIBs and Coupling / Round Beam Jonas, Felix, Cigdem, Paul Goslawski, Peter Kuske 07:00 - 14:00 Robinson stability measurements at lower current (with streak-cam) Lukas 14:00 - 20:00 SLS 2.0 Injection Chain Setup for 2.7 GeV Jonas, Thomas 20:00 - 24:00 50 mA Storage Ring Kicker Matching Chris, Martin, Jonas Software Development for BPM TbT Data Jan \u2060 Thursday, 28.09.2023 \u2060 \u2060 00:00 - 02:00 Test on influence of ELM brake for servo motor on the stored beam with and without FOFB Thomas Schmidt, Marc Br\u00fcgger 02:00 - 06:00 Reserve 06:00 - 07:00 Test the booster inj/ext with the upgraded timing system and fine delay feature, tests on the timing master software with beam Alexander, Romain 08:00 - 12:00 Machine Learning for SLS 2.0: Test Model Simona 12:00 - 14:00 Optimizing the Beam Size to Lifetime Ratio Cigdem, Simona 14:00 - 22:00 Beam Size Minimization Measurements Michael, Cigdem 22:00 - 24:00 Reserve Friday, 29.09.2023 \u2060 \u2060 00:00 - 06:00 Reserve 06:00 - 07:00 Test the booster inj/ext with the upgraded timing system and fine delay feature, tests on the timing master software with beam Alexander, Romain 07:00 - 11:00 Test New SLS2 FOFB Goran, Boris Software Development for Emittance Measurement Jan \u2060 11:00 - 15:00 Test of SLS 2.0 MBFB and FPFB Pedro, Boris 15:00 - 15:30 Test Spare PCT Hardware Cigdem 15:30 - 19:30 Optimizing the Beam Size to Lifetime Ratio Cigdem, Simona 19:30 - 24:00 Reserve Saturday, 30.09.2023 \u2060 \u2060 00:00 - 07:30 Reserve 07:30 - 08:00 Ceremonial Beam Dump GFA In parallel, 25. - 30.09.2023 \u2060 \u2060 High power tests of coupler and power transition in the teststand (should not affect operation) Lukas , Roger AOB Communication Strategy and Plan for SLS 2.0 At the last SRDG meeting ( https://indico.psi.ch/event/15040/ ) the new SLS 2.0 communication strategy was mentioned. Some example tweets are linked below. All those present at this meeting agree that it is not a good idea to rename the well known name \"SLS 2.0\" which stands for it being the successor to the existing SLS back to the name of its predecessor after commissioning. End of SLS Party (PSD) Monday, 25 th September, 16:00 - 18:00 Place: tent at the SLS (when facing the SLS entrance, the tent is located on the left hand side) Please register by Monday, 18 th September 2023 in https://indico.psi.ch/e/SLS-party SLS Letztes Elektron vor dem Upgrade Z'Morge (GFA) Saturday, 30 th September, 07:30 - 09:30 Place: Foyer in front of the Control Room (WGBG) https://indico.psi.ch/event/15122/ SLS 2.0 related tweets posted by the official PSI twitter/X account","title":"20/09/2023"},{"location":"uom/minutes/","text":"Minutes of the SLS 2.0 User Operation Meetings 20/06/2025 Participants: Felix Armborst, ... Reports Machine Commissioning Requests AOB","title":"UOM minutes"},{"location":"uom/minutes/#20062025","text":"Participants: Felix Armborst, ... Reports Machine Commissioning Requests AOB","title":"20/06/2025"}]}
\ No newline at end of file
+{"config":{"indexing":"full","lang":["en"],"min_search_length":3,"prebuild_index":false,"separator":"[\\s\\-]+"},"docs":[{"location":"","text":"SLS 2.0 Operations Management The following mailing lists have been prepared for the SLS 2.0 Operations Management: PSI.SLS-MDM (SLS 2.0 machine experts are the members) PSI.SLS-UOM (SLS 2.0 beamline experts are the members) Please forward membership requests to felix.armborst@psi.ch . There are two associated meeting series: Machine Development Meeting (MDM) Focused on machine development shifts for the SLS 2.0 Target audience are machine experts and interested beamline experts Reports on machine development shifts and operation Requests for and planning of upcoming machine development shifts The agendas of these meetings are available on indico User Operations Meeting (UOM) Focused on the beamline development shifts for SLS 2.0 Target audience are beamline experts and interested machine experts Reports on beamline development shifts and operation Requests for and planning of upcoming beamline development shifts Requests for and planning of upcoming user operations shifts The agendas of these meetings are available on indico Documentation on how to create such a website is available on gitlab .","title":"General information"},{"location":"mandate/","text":"Mandate **Draft - Not Yet Final** The SLS 2.0 Operations Manager is Felix Armborst and has the following mandate: Develop and steer overall operation, development and shutdown schedule Coordinate with all stakeholders including operations and other accelerator facilities at PSI Annual DUO planning Report all relevant information including short term machine and beamline development plans at weekly operations meetings Develop and steer beamline and machine development plans Coordinate with machine groups on equipment, control and SW readiness and validation testing Coordinate with beam dynamics groups on machine development activities Coordinate with beamline groups on beamline development activities Develop and steer operator training Defining theoretical and practical requirements for obtaining different levels (A-, and B-Operator) Preparing and conducting theoretical and practical operator trainings Preparing and conducting theoretical and practical operator exams Handling of any schedule or technical issues Analyse performance impact Develop mitigation measures in collaboration with responsible groups Report possibly resulting investment requirements to machine coordinator Develop and maintain deployment plans for interfaces, high level SW and equipment integration Follow up testing and update planning Prepare and analyse the SLS 2.0 operations statistics Report the annual SLS 2.0 operations statistics at the European Synchrotron Light Sources Workshop (ESLS) Write SLS 2.0 part of the annual report \"Operation of the PSI Accelerator Facilities\" The SLS 2.0 Machine Coordinator is Jonas Kallestrup and has the following mandate: Follow up latest developments in Beam Dynamics simulations and measurements, analyse performance impact and steer studies and mitigations Develop measurement techniques for hitherto poorly quantified parameters Report to Bereichsleitungssitzung The SLS 2.0 Machine Responsible GFA is Hans Braun and has the following mandate: The SLS 2.0 Machine Responsible PSD is Frithjof Nolting and has the following mandate: The SLS 2.0 Area Coordinator is Juri Honegger and has the following mandate:","title":"Mandate"},{"location":"mdm/minutes/","text":"Minutes of the SLS 2.0 Machine Developement Meetings Andreas Anuschka Boris Chris Cigdem Felix Goran Jeff Jonas Lukas Michael Paolo Pedro Roger Simona Thomas Volker 20/09/2023 Participants: Felix Armborst, Simona Bettoni, Michael B\u00f6ge, Christopher H. Gough, Jonas Kallestrup, Thomas Geoffrey Lucas, Andreas L\u00fcdeke, Anuschka Pauluhn, Volker Schlott, Lukas Stingelin, Jean-Francois Thomsen Reports Machine Operation This year was the worst year in the history of SLS operation. With 92% it was worse than first year with 94 %. With 99.6% Availability in the last weeks without major outages. Beamlosses partly occured due to beamlines Electron source pulser tests second pulse from new board amended pulse length shorter at lower charge ~100 pC was in operation the last weeks observed energy stability seems to have more jitter than old pulser \u2192 diagnosed to be problem of modulator board measured to feature jitter of ~12ps compared to old one with ~20ps injection rate to booster rather low Debye commissioning measured entire night with -1.3 mm bump @ 85 mA very useful for debugging beamline photo of monochromatic photon beam at end of beamline Problem with old frontend of IR beamline mirror moved and probably tilted large orbit bump and low current required to mitigate vacuum interlocks party today Beam size optimization short unsatisfying shift wrong file loaded in shift before corrected in this shift \u2192 got below 10 um Test of new FOFB bug identified (corrector matrix transposed accidentally) seems to work well now Linac radiation mapping measured radiation dose, waiting for report measured dose rates higher than old measurements with multibunch mode measurements were performed at higher charge than required for operation Single bunch measurements results in RF elog measured zero current bunch length seems to fit prediction within 1% microwave instability confirmed at 3.4 mA somewhat smaller than model (4 mA) maybe due to missing impedance ID and orbit code to compensate for undulator gap change kick was tested working code output pdf in elog local correction with 4 correctors QT GUI not yet working on Bay 4 next time with only local correctors took response matrix data 150 samples for machine learning model X04SA-ID orbit optimization Goal was to callibrate new SiC XBPMs in X04 and compare to existing frontend XBPMs at X04 and X11 beamline was operated during MD shift time was short and current reduced for Debye SU measurements X11 nobody was available to help BPM tild measurement last bpm rotation measurement long ago, lots of HW exchange since then tilt error lets horizontal dispersion appear vertical, making vertical dispersion suppression difficult shift was successful Operator training 5 participants, well recieved explained LINAC setup including different bunchers SME and longitudinal loss monitors with persistent mode showing minimum, maximum, current and average loss worked nicely LLM give nice unique signature of current state of injection losses good to identify drifts and problems early more power in subharmonic prebuncher (SPB) would be good (stronger gradient enables shorter bunch which is good for further bunching and acceleration in 3 GHz structures) idea is to give operators tools/cookbook to double check setup from RF group and correct for long term drifts Requests Time Description Participants Monday, 25.09.2023 \u2060 \u2060 10:00 - 14:00 Test of SLS 2.0 MBFB and FPFB Pedro, Boris 14:00 - 18:00 Test New SLS2 FOFB Goran, Boris 18:00 - 24:00 Machine Learning for SLS 2.0: Train Model Simona Tuesday, 26.09.2023 \u2060 \u2060 00:00 - 07:00 Reserve 07:00 - 18:00 BD Collaboration, Coupling / Round Beam Jonas, Felix, Cigdem, Paul Goslawski, Peter Kuske 18:00 - 22:00 Investigation of the Super-3HC failure and impedance of the vacuum-components Lukas, Operator 22:00 - 24:00 BD Collaboration, TRIBs and Coupling / Round Beam Jonas, Felix, Cigdem, Paul Goslawski, Peter Kuske Wednesday, 27.09.2023 \u2060 \u2060 00:00 - 07:00 BD Collaboration, TRIBs and Coupling / Round Beam Jonas, Felix, Cigdem, Paul Goslawski, Peter Kuske 07:00 - 14:00 Robinson stability measurements at lower current (with streak-cam) Lukas 14:00 - 20:00 SLS 2.0 Injection Chain Setup for 2.7 GeV Jonas, Thomas 20:00 - 24:00 50 mA Storage Ring Kicker Matching Chris, Martin, Jonas Software Development for BPM TbT Data Jan \u2060 Thursday, 28.09.2023 \u2060 \u2060 00:00 - 02:00 Test on influence of ELM brake for servo motor on the stored beam with and without FOFB Thomas Schmidt, Marc Br\u00fcgger 02:00 - 06:00 Reserve 06:00 - 07:00 Test the booster inj/ext with the upgraded timing system and fine delay feature, tests on the timing master software with beam Alexander, Romain 08:00 - 12:00 Machine Learning for SLS 2.0: Test Model Simona 12:00 - 14:00 Optimizing the Beam Size to Lifetime Ratio Cigdem, Simona 14:00 - 22:00 Beam Size Minimization Measurements Michael, Cigdem 22:00 - 24:00 Reserve Friday, 29.09.2023 \u2060 \u2060 00:00 - 06:00 Reserve 06:00 - 07:00 Test the booster inj/ext with the upgraded timing system and fine delay feature, tests on the timing master software with beam Alexander, Romain 07:00 - 11:00 Test New SLS2 FOFB Goran, Boris Software Development for Emittance Measurement Jan \u2060 11:00 - 15:00 Test of SLS 2.0 MBFB and FPFB Pedro, Boris 15:00 - 15:30 Test Spare PCT Hardware Cigdem 15:30 - 19:30 Optimizing the Beam Size to Lifetime Ratio Cigdem, Simona 19:30 - 24:00 Reserve Saturday, 30.09.2023 \u2060 \u2060 00:00 - 07:30 Reserve 07:30 - 08:00 Ceremonial Beam Dump GFA In parallel, 25. - 30.09.2023 \u2060 \u2060 High power tests of coupler and power transition in the teststand (should not affect operation) Lukas , Roger AOB Communication Strategy and Plan for SLS 2.0 At the last SRDG meeting ( https://indico.psi.ch/event/15040/ ) the new SLS 2.0 communication strategy was mentioned. Some example tweets are linked below. All those present at this meeting agree that it is not a good idea to rename the well known name \"SLS 2.0\" which stands for it being the successor to the existing SLS back to the name of its predecessor after commissioning. End of SLS Party (PSD) Monday, 25 th September, 16:00 - 18:00 Place: tent at the SLS (when facing the SLS entrance, the tent is located on the left hand side) Please register by Monday, 18 th September 2023 in https://indico.psi.ch/e/SLS-party SLS Letztes Elektron vor dem Upgrade Z'Morge (GFA) Saturday, 30 th September, 07:30 - 09:30 Place: Foyer in front of the Control Room (WGBG) https://indico.psi.ch/event/15122/ SLS 2.0 related tweets posted by the official PSI twitter/X account","title":"MDM minutes"},{"location":"mdm/minutes/#20092023","text":"Participants: Felix Armborst, Simona Bettoni, Michael B\u00f6ge, Christopher H. Gough, Jonas Kallestrup, Thomas Geoffrey Lucas, Andreas L\u00fcdeke, Anuschka Pauluhn, Volker Schlott, Lukas Stingelin, Jean-Francois Thomsen Reports Machine Operation This year was the worst year in the history of SLS operation. With 92% it was worse than first year with 94 %. With 99.6% Availability in the last weeks without major outages. Beamlosses partly occured due to beamlines Electron source pulser tests second pulse from new board amended pulse length shorter at lower charge ~100 pC was in operation the last weeks observed energy stability seems to have more jitter than old pulser \u2192 diagnosed to be problem of modulator board measured to feature jitter of ~12ps compared to old one with ~20ps injection rate to booster rather low Debye commissioning measured entire night with -1.3 mm bump @ 85 mA very useful for debugging beamline photo of monochromatic photon beam at end of beamline Problem with old frontend of IR beamline mirror moved and probably tilted large orbit bump and low current required to mitigate vacuum interlocks party today Beam size optimization short unsatisfying shift wrong file loaded in shift before corrected in this shift \u2192 got below 10 um Test of new FOFB bug identified (corrector matrix transposed accidentally) seems to work well now Linac radiation mapping measured radiation dose, waiting for report measured dose rates higher than old measurements with multibunch mode measurements were performed at higher charge than required for operation Single bunch measurements results in RF elog measured zero current bunch length seems to fit prediction within 1% microwave instability confirmed at 3.4 mA somewhat smaller than model (4 mA) maybe due to missing impedance ID and orbit code to compensate for undulator gap change kick was tested working code output pdf in elog local correction with 4 correctors QT GUI not yet working on Bay 4 next time with only local correctors took response matrix data 150 samples for machine learning model X04SA-ID orbit optimization Goal was to callibrate new SiC XBPMs in X04 and compare to existing frontend XBPMs at X04 and X11 beamline was operated during MD shift time was short and current reduced for Debye SU measurements X11 nobody was available to help BPM tild measurement last bpm rotation measurement long ago, lots of HW exchange since then tilt error lets horizontal dispersion appear vertical, making vertical dispersion suppression difficult shift was successful Operator training 5 participants, well recieved explained LINAC setup including different bunchers SME and longitudinal loss monitors with persistent mode showing minimum, maximum, current and average loss worked nicely LLM give nice unique signature of current state of injection losses good to identify drifts and problems early more power in subharmonic prebuncher (SPB) would be good (stronger gradient enables shorter bunch which is good for further bunching and acceleration in 3 GHz structures) idea is to give operators tools/cookbook to double check setup from RF group and correct for long term drifts Requests Time Description Participants Monday, 25.09.2023 \u2060 \u2060 10:00 - 14:00 Test of SLS 2.0 MBFB and FPFB Pedro, Boris 14:00 - 18:00 Test New SLS2 FOFB Goran, Boris 18:00 - 24:00 Machine Learning for SLS 2.0: Train Model Simona Tuesday, 26.09.2023 \u2060 \u2060 00:00 - 07:00 Reserve 07:00 - 18:00 BD Collaboration, Coupling / Round Beam Jonas, Felix, Cigdem, Paul Goslawski, Peter Kuske 18:00 - 22:00 Investigation of the Super-3HC failure and impedance of the vacuum-components Lukas, Operator 22:00 - 24:00 BD Collaboration, TRIBs and Coupling / Round Beam Jonas, Felix, Cigdem, Paul Goslawski, Peter Kuske Wednesday, 27.09.2023 \u2060 \u2060 00:00 - 07:00 BD Collaboration, TRIBs and Coupling / Round Beam Jonas, Felix, Cigdem, Paul Goslawski, Peter Kuske 07:00 - 14:00 Robinson stability measurements at lower current (with streak-cam) Lukas 14:00 - 20:00 SLS 2.0 Injection Chain Setup for 2.7 GeV Jonas, Thomas 20:00 - 24:00 50 mA Storage Ring Kicker Matching Chris, Martin, Jonas Software Development for BPM TbT Data Jan \u2060 Thursday, 28.09.2023 \u2060 \u2060 00:00 - 02:00 Test on influence of ELM brake for servo motor on the stored beam with and without FOFB Thomas Schmidt, Marc Br\u00fcgger 02:00 - 06:00 Reserve 06:00 - 07:00 Test the booster inj/ext with the upgraded timing system and fine delay feature, tests on the timing master software with beam Alexander, Romain 08:00 - 12:00 Machine Learning for SLS 2.0: Test Model Simona 12:00 - 14:00 Optimizing the Beam Size to Lifetime Ratio Cigdem, Simona 14:00 - 22:00 Beam Size Minimization Measurements Michael, Cigdem 22:00 - 24:00 Reserve Friday, 29.09.2023 \u2060 \u2060 00:00 - 06:00 Reserve 06:00 - 07:00 Test the booster inj/ext with the upgraded timing system and fine delay feature, tests on the timing master software with beam Alexander, Romain 07:00 - 11:00 Test New SLS2 FOFB Goran, Boris Software Development for Emittance Measurement Jan \u2060 11:00 - 15:00 Test of SLS 2.0 MBFB and FPFB Pedro, Boris 15:00 - 15:30 Test Spare PCT Hardware Cigdem 15:30 - 19:30 Optimizing the Beam Size to Lifetime Ratio Cigdem, Simona 19:30 - 24:00 Reserve Saturday, 30.09.2023 \u2060 \u2060 00:00 - 07:30 Reserve 07:30 - 08:00 Ceremonial Beam Dump GFA In parallel, 25. - 30.09.2023 \u2060 \u2060 High power tests of coupler and power transition in the teststand (should not affect operation) Lukas , Roger AOB Communication Strategy and Plan for SLS 2.0 At the last SRDG meeting ( https://indico.psi.ch/event/15040/ ) the new SLS 2.0 communication strategy was mentioned. Some example tweets are linked below. All those present at this meeting agree that it is not a good idea to rename the well known name \"SLS 2.0\" which stands for it being the successor to the existing SLS back to the name of its predecessor after commissioning. End of SLS Party (PSD) Monday, 25 th September, 16:00 - 18:00 Place: tent at the SLS (when facing the SLS entrance, the tent is located on the left hand side) Please register by Monday, 18 th September 2023 in https://indico.psi.ch/e/SLS-party SLS Letztes Elektron vor dem Upgrade Z'Morge (GFA) Saturday, 30 th September, 07:30 - 09:30 Place: Foyer in front of the Control Room (WGBG) https://indico.psi.ch/event/15122/ SLS 2.0 related tweets posted by the official PSI twitter/X account","title":"20/09/2023"},{"location":"uom/minutes/","text":"Minutes of the SLS 2.0 User Operation Meetings 20/06/2025 Participants: Felix Armborst, ... Reports Machine Commissioning Requests AOB","title":"UOM minutes"},{"location":"uom/minutes/#20062025","text":"Participants: Felix Armborst, ... Reports Machine Commissioning Requests AOB","title":"20/06/2025"}]}
\ No newline at end of file
diff --git a/mkdocs/site/sitemap.xml.gz b/mkdocs/site/sitemap.xml.gz
index 9f333ef..4b61e89 100644
Binary files a/mkdocs/site/sitemap.xml.gz and b/mkdocs/site/sitemap.xml.gz differ