@@ -238,20 +238,20 @@ Minutes written by {{Felix}}
|
||||
|
||||
3. **Shift Requests**
|
||||
|
||||
| {{o}} | **Details** | **Who** |
|
||||
| :---- | :------------------------------------------------------ | :------------------------------------------- |
|
||||
| {{o}} | Operator Training | {{Felix}} |
|
||||
| {{o}} | Operator Startup | {{Felix}} |
|
||||
| {{x}} | Check movable power dividers of linac with beam (Felix calls Paolo as soon as startup is done) | {{Fabio}}, {{Paolo}} |
|
||||
| {{x}} | Test timing | {{Romain}}, {{Felix}} |
|
||||
| {{o}} | 2 hours, Investigate tune feeedback drift | {{Masamitsu}}, {{Felix}} |
|
||||
| {{o}} | 4 hours, implement ID Optics Feed Forward | {{Masamitsu}}, {{Felix}} |
|
||||
| {{o}} | 2 hours, measure feed forward X06 U17 (not wednesday evening) | {{Simona}} |
|
||||
| 8 hours | thorough linac setup | {{Volker}}, {{Felix}}, Neven |
|
||||
| 13-17h | 14.8., 4 hours, for BPM firmware upgrade (trying to fix the FOFB fiber link issue as needed to get a fast orbit interlock) | {{Boris}}, {{JonasP}} |
|
||||
| 13-16h | 25.8. test cooling PLC upgrade | {{Lukas}} |
|
||||
| 16-22h | 25.8., 6 hours, test of new ring corrector power supply firmware ({{HansJ}} has time from 11-22h), as needed to reach > 1 kHz FOFB 0dB point and better suppress 50 and 90 Hz perturbations & improve general FOFB stability. | {{Boris}}, {{HansJ}} |
|
||||
| 2 hours | Investigate injection drifts | {{Martin}}, {{Felix}} |
|
||||
| | **Details** | **Who** |
|
||||
| :---- | :------------------------------------------------------ | :------------------------------------------- |
|
||||
| {{o}} | Operator Training | {{Felix}} |
|
||||
| {{o}} | Operator Startup | {{Felix}} |
|
||||
| {{x}} | Check movable power dividers of linac with beam (Felix calls Paolo as soon as startup is done) | {{Fabio}}, {{Paolo}} |
|
||||
| {{x}} | Test timing | {{Romain}}, {{Felix}} |
|
||||
| {{o}} | 2 hours, Investigate tune feeedback drift | {{Masamitsu}}, {{Felix}} |
|
||||
| {{o}} | 4 hours, implement ID Optics Feed Forward | {{Masamitsu}}, {{Felix}} |
|
||||
| {{o}} | 2 hours, measure feed forward X06 U17 (not wednesday evening) | {{Simona}} |
|
||||
| {{o}} | 8 hours, thorough linac setup | {{Volker}}, {{Felix}}, Neven |
|
||||
| {{o}} | 14.8., 13-17h, for BPM firmware upgrade (trying to fix the FOFB fiber link issue as needed to get a fast orbit interlock) | {{Boris}}, {{JonasP}} |
|
||||
| {{o}} | 13-16h, 25.8. test cooling PLC upgrade | {{Lukas}} |
|
||||
| {{o}} | 16-22h, 25.8., 6 hours, test of new ring corrector power supply firmware ({{HansJ}} has time from 11-22h), as needed to reach > 1 kHz FOFB 0dB point and better suppress 50 and 90 Hz perturbations & improve general FOFB stability. | {{Boris}}, {{HansJ}} |
|
||||
| {{o}} | 2 hours, Investigate injection drifts | {{Martin}}, {{Felix}} |
|
||||
|
||||
|
||||