From 8ea130ddaa7191ef154bb95d4165fdbc0b2d296c Mon Sep 17 00:00:00 2001 From: armborst_f Date: Tue, 11 Aug 2026 07:45:00 +0200 Subject: [PATCH] update schedule --- docs/machine/mdm.md | 28 ++++++++++++++-------------- 1 file changed, 14 insertions(+), 14 deletions(-) diff --git a/docs/machine/mdm.md b/docs/machine/mdm.md index 1dde4ad..35a494f 100644 --- a/docs/machine/mdm.md +++ b/docs/machine/mdm.md @@ -238,20 +238,20 @@ Minutes written by {{Felix}} 3. **Shift Requests** - | {{o}} | **Details** | **Who** | - | :---- | :------------------------------------------------------ | :------------------------------------------- | - | {{o}} | Operator Training | {{Felix}} | - | {{o}} | Operator Startup | {{Felix}} | - | {{x}} | Check movable power dividers of linac with beam (Felix calls Paolo as soon as startup is done) | {{Fabio}}, {{Paolo}} | - | {{x}} | Test timing | {{Romain}}, {{Felix}} | - | {{o}} | 2 hours, Investigate tune feeedback drift | {{Masamitsu}}, {{Felix}} | - | {{o}} | 4 hours, implement ID Optics Feed Forward | {{Masamitsu}}, {{Felix}} | - | {{o}} | 2 hours, measure feed forward X06 U17 (not wednesday evening) | {{Simona}} | - | 8 hours | thorough linac setup | {{Volker}}, {{Felix}}, Neven | - | 13-17h | 14.8., 4 hours, for BPM firmware upgrade (trying to fix the FOFB fiber link issue as needed to get a fast orbit interlock) | {{Boris}}, {{JonasP}} | - | 13-16h | 25.8. test cooling PLC upgrade | {{Lukas}} | - | 16-22h | 25.8., 6 hours, test of new ring corrector power supply firmware ({{HansJ}} has time from 11-22h), as needed to reach > 1 kHz FOFB 0dB point and better suppress 50 and 90 Hz perturbations & improve general FOFB stability. | {{Boris}}, {{HansJ}} | - | 2 hours | Investigate injection drifts | {{Martin}}, {{Felix}} | +| | **Details** | **Who** | +| :---- | :------------------------------------------------------ | :------------------------------------------- | +| {{o}} | Operator Training | {{Felix}} | +| {{o}} | Operator Startup | {{Felix}} | +| {{x}} | Check movable power dividers of linac with beam (Felix calls Paolo as soon as startup is done) | {{Fabio}}, {{Paolo}} | +| {{x}} | Test timing | {{Romain}}, {{Felix}} | +| {{o}} | 2 hours, Investigate tune feeedback drift | {{Masamitsu}}, {{Felix}} | +| {{o}} | 4 hours, implement ID Optics Feed Forward | {{Masamitsu}}, {{Felix}} | +| {{o}} | 2 hours, measure feed forward X06 U17 (not wednesday evening) | {{Simona}} | +| {{o}} | 8 hours, thorough linac setup | {{Volker}}, {{Felix}}, Neven | +| {{o}} | 14.8., 13-17h, for BPM firmware upgrade (trying to fix the FOFB fiber link issue as needed to get a fast orbit interlock) | {{Boris}}, {{JonasP}} | +| {{o}} | 13-16h, 25.8. test cooling PLC upgrade | {{Lukas}} | +| {{o}} | 16-22h, 25.8., 6 hours, test of new ring corrector power supply firmware ({{HansJ}} has time from 11-22h), as needed to reach > 1 kHz FOFB 0dB point and better suppress 50 and 90 Hz perturbations & improve general FOFB stability. | {{Boris}}, {{HansJ}} | +| {{o}} | 2 hours, Investigate injection drifts | {{Martin}}, {{Felix}} | Minutes written by {{Felix}}