add beam dump kicker specsheet
This commit is contained in:
Binary file not shown.
@@ -38,13 +38,10 @@
|
||||
* Measurement and interlock of CBI, i.e., MBFB
|
||||
* Cables missing until Feb. shutdown
|
||||
* No calibration and thus absolute measurement possible until then
|
||||
* empirically determined threshold for interlock
|
||||
* Empirically determined threshold for interlock
|
||||
* Control of filling pattern
|
||||
* Fast interlock for super-3HC (also requires beam dump kicker)
|
||||
* New LLRF available soon, temperature readout in control system still missing
|
||||
|
||||
* **Linac/LTB Optimization** by {{Volker}}
|
||||
* ...
|
||||
|
||||
* **Booster/BRTL Optimization** by {{Jonas}}
|
||||
* Tunes at ramp beginning of ramp improved
|
||||
@@ -82,7 +79,7 @@
|
||||
* confirmation of required field in first section required and coming this week
|
||||
* other labs?
|
||||
* not widely asked
|
||||
* felix attaches specsheet here : [here]()
|
||||
* felix attaches specsheet: [here]('files/SLS_BeamDumpCaps.pdf')
|
||||
* neck injury of colleague might slow done control system HW
|
||||
* working 25 % from home
|
||||
* kicker bump leakage
|
||||
|
||||
Reference in New Issue
Block a user