@@ -38,13 +38,10 @@
* Measurement and interlock of CBI, i.e., MBFB
* Cables missing until Feb. shutdown
* No calibration and thus absolute measurement possible until then
* empirically determined threshold for interlock
* Empirically determined threshold for interlock
* Control of filling pattern
* Fast interlock for super-3HC (also requires beam dump kicker)
* New LLRF available soon, temperature readout in control system still missing
* **Linac/LTB Optimization** by {{Volker}}
* ...
* **Booster/BRTL Optimization** by {{Jonas}}
* Tunes at ramp beginning of ramp improved
@@ -82,7 +79,7 @@
* confirmation of required field in first section required and coming this week
* other labs?
* not widely asked
* felix attaches specsheet here : [here]()
* felix attaches specsheet: [here]('files/SLS_BeamDumpCaps.pdf')
* neck injury of colleague might slow done control system HW
* working 25 % from home
* kicker bump leakage