@@ -207,7 +207,7 @@ Minutes written by {{Felix}}
## 23/06/2025
**Participants:**
{{RomainG}}, {{Lukas}}, {{Masamitsu}}, {{Boris}}, {{Jonas}}, {{Michael}}, {{Cigdem}}, {{Simona}}, {{Martin}}, {{Jesus}}, {{Felix}}
{{Hans}}, {{RomainG}}, {{Lukas}}, {{Masamitsu}}, {{Boris}}, {{Jonas}}, {{Michael}}, {{Cigdem}}, {{Simona}}, {{Martin}}, {{Jesus}}, {{Felix}}
1. **Introduction**
@@ -249,6 +249,8 @@ Minutes written by {{Felix}}
* Summary of machine activities since last BDM, i.e., of KW 25
*
* Incidents/Issues
* Archiver performance not meeting expectations
* Felix will follow up with Tadej
* PSYS beam dump today
* needs to be followed up
* Beam Dump Kicker Issue: Saturday Evening the BDK did not recover after a beam dump
@@ -257,10 +259,21 @@ Minutes written by {{Felix}}
* **Despite unfortunately not having a pulsed magnets piquet service, we luckily have a highly motivated Martin who came to PSI from Zurich during the night from Saturday to Sunday and managed to fix the beam dump kicker after ~5 hours enabling further operation at nominal parameters over the weekend**
* switches not holding high voltage, issue with one of the switches
* abnormal power consumption from the HV PS
* switch degraded and features increased leakage current
* interlock due to monitored average power from HV PS
* switch exchanged for test switch which needed second tunnel access for quickfix and confirmed to be the underlying issue
* possibly linked to radiation damage of semiconductor (very high gain thyristors)
* according to company this should not be the case
* we need to prepare easy procedure for final beam dump to operate with 2/4 or 3/4 stages
* leakage current started rising 1-2 hours before incident
* manual beam dump tests only feasible without RF outage for current below 10 mA
* ALIMA-CV-a6:I-SET Offset
* Set/RB comparison alarm
* RB does however follow set with offset
* [elog](https://elog-gfa.psi.ch/SLS/61358) - Lukas suggests to increase alarm tolerance --> yes, please but also fix the PS since it has significant offset
* PS currently still in Paolo's responsibility
* Lukas willi follow up with Paolo
* Replacement of the power supplies is foreseen for 2026/2027 and will move responsibility to the power supply group
* Beamdrop starting at shift handover on Friday
* After Injection issues operators switched back to workaround timing system
* root cause unclear - maybe a silent interlock or crash/limit reached for timing master filling pattern local mode
@@ -288,42 +301,58 @@ Minutes written by {{Felix}}
![K2_1721](files/20250623_K2_1721.png)
![K2_1731_WithFan](files/20250623_K2_1731_WithFan.png)
* Next steps: X-Ray, swap for spare chamber
* X-ray in August shutdown
* **Linac and LTB Optimization** by {{Jonas}}, {{Simona}} and {{Volker}}
* [elog](https://elog-gfa.psi.ch/SLS+Development/2511)
* **Booster/BRTL Optimization** by {{Jonas}}
* ...
* **Storage Ring Optimization** by {{Masamitsu}}
* ...
* goal was to switch off solenoids
* Jonas optimized for max charge day before and achieved 600 pC at gun bias 40 kV
* 600 pC at gun bias 40 kV was achieved also with one solenoid switched off
* Optimal transmission for 300 pC from Linac
* High sensitivity to orbit in LinaC
* **Feedbacks and BPMs** by {{Boris}}
* [elog](https://elog-gfa.psi.ch/SLS+Development/2508)
* [elog](https://elog-gfa.psi.ch/SLS+Development/2510)
* spikes on BPM data
* stops FOFB every 70 seconds
* scale of issue not yet clear, next FOFB version will count these spikes
* synchrotron oscillations on order of um observed at dispersive BPMs while usually nm
* LLRF feedback not changed
* Test of switching LLRF off to confirm it as source should be performed
* supression of booster induced orbit distortion by FOFB
* possible if spike issue fixed
* goal is to get FOFB running with low gain to supress 3 Hz distortions by order of magnitude
* higher gain increases risk of FOFB outage
* **RF** by {{Lukas}}
* ...
* 3HC spectrum analyzer could be used to compare sidebands with issue observed by Boris
* pressure fluctuations being investigated, possibly related to gauge
* LLRF upgrades of HLA performed enabling diagnostic post mortem tests
* LLRF FW upgrade to be done
* **Diagnostics** by {{Cigdem}}
* ...
* PCT noise level worse than SLS - 1
* Beam size measurement is running, EPICS PVs with customizable ROI array would be nice
* Horizontal emittance measurement showing increased beam size not 100% understood
* knife edge scan from PX-III can be used for comparison
* contribution from spurious dispersion
* continuous measurement of energy spread and emittance/beam size challenging due to small beam size
* **ID Feed Forward** by {{Masamitsu}} and {{Simona}} and {{Dirk}}
* ...
* PX-II asked for smallest gap setting so far --> EPICS soft limit at 100 mA
* **Pulsed Magnets** by {{Martin}}
* ...
* preparing final beam dump system
* priority of health monitoring system dropped
* prototype will be finished but final setup needs to be transferred to AEK request
* exchange of pinger HV PS planned
* **Impedances and MBFB kickers** by {{Micha}}
* ...
* **Timing** by {{Romain}}
* ...
* **ID Feed Forward** by {{Masamitsu}} and {{Simona}} and {{Dirk}}
* ...
* **Shift Summaries**
* **Girder Alignment** by {{Michael}}
* all alignment data (sectors 1,2,3,4,5,6,8) in model illustrates necessary movements for required angle change for ADDAMS (X04SA) shows significant realignment would be required to correct the 50 urad
* root cause of this error to be investigated
* wait for full picture (data from Karsten) before decision of compromise between alignment to zero vs alignment to global smoothing fit
* need to be very transparent with beamlines while taking these decisions
3. **Requests**
+3 -2
View File
@@ -13,8 +13,9 @@ template: schedule.html
| `00:00 - 24:00` | Top-up, 400 mA | Beamline development | OP shift crew |
| **Tuesday, 24.06.2025** {: colspan=4} | &#8288 {: style="padding:0"} | &#8288 {: style="padding:0"} | &#8288 {: style="padding:0"} |
| `00:00 - 07:00` | Top-up, 400 mA | Beamline development | OP shift crew |
| `07:00 - 15:00` | unstable | Machine development ??FOFB | ?? |
| `15:00 - 24:00` | unstable | Machine development ??FOFB | ?? |
| `07:00 - 09:00` | unstable | operator training | ?? |
| `09:00 - 17:00` | unstable | FOFB development ??FOFB | {{Boris}} and Jonas |
| `17:00 - 24:00` | unstable | Machine development ??FOFB | {{Boris}} |
| **Wednesday, 25.06.2025** {: colspan=4} | &#8288 {: style="padding:0"} | &#8288 {: style="padding:0"} | &#8288 {: style="padding:0"} |
| `00:00 - 07:30` | unstable, all gaps open | FOFB development | {{Boris}} |
| `07:30 - 08:00` | unstable | Beam Dump and refill to 60 mA | OP shift crew |