@@ -141,14 +141,14 @@ Minutes written by {{Felix}}
* Successful first light for VUV and cSAXS
* Tune Feedback implemented
* Incidents/Issues
* Two? SC superbend interlocks via VCS and MIS des
* X07 temperature sensors not connected and absorber not cooled
* Two? SC superbend interlocks via VCS and MIS today
* Vacuum mishap: X07 temperature sensors not connected and absorber not cooled
* Regular Vacuum Pressure Spikes in straights 7 and 11
* IOC load and link issues due to puppet runs
* SLS gateway security patch next Tuesday 7 AM
* SLS gateway security patch scheduled for next Tuesday 7 AM
* Nr. of vacuum issues from beamlines propagating to machine increasing
* Interlock Beam Dumps
* https://sls.psi.ch/machine/cbd/
* new risky beam dump https://sls.psi.ch/machine/cbd/
* **Linac/LTB Optimization** by {{Jonas}}
* 15 % injection rate increase after optimization of linac
@@ -159,13 +159,13 @@ Minutes written by {{Felix}}
* Noise of water flow measurement increased
* Beam dump requests due to overvoltage detection on cavities indicating instability loss mechanism
* best case fast ion instability
* maybe also CBI
* 3 hours MD time required after summer shutdown for testing cooling PLC upgrade
* maybe also CBI, MBFB post mortem would be good
* while migration to new PCT system is ongoing the rapid current drop interlock is not available
* **Super-3HC**
* incident with compressor: interruption of PS for venting of compressor, maintenance by cryo group in next shutdown planned, i.e., warmup required, more info in cryo elog
* **Pulsed Magnets** by {{Martin}}
* New FW for red pitayas with readout via memory instead of CPU so far working stable
* New FW for red pitayas with value readout via memory instead of CPU so far working stable
* **Feedbacks and BPMs** by {{Boris}}
* Post mortem data for BPM now available
@@ -196,14 +196,6 @@ Minutes written by {{Felix}}
* increased local corrector limits enabling 10x faster switching of large localized bumps
* further improvement and generic implementation possible
3. **Shift Requests**
* KW36
* [x] ...
* KW37
* [x] ...
* KW38
* [] ...
Minutes written by {{Felix}}
+7 -5
View File
@@ -6,6 +6,13 @@ template: main.html
hide:
- toc
---
<!--
| 4 hours | ID characterization | {{Masamitsu}} |
| 4 hours | BPM3 FW CRC End-to-End checksum to FOFB Datenlink test | {{Boris}}, {{JonasP}} |
| 4 hours | Bunch length/Streak Camera measurements for exotic fill patterns | {{Cigdem}}, {{Micha}}, {{Alessandro}} |
| 1 hours | Test 3HC over voltage reset | {{Renata}}, {{Alessandro}} |
| 1/2 hour | Visit tunnel on 14th of Juli 12:30 to 13:00 | {{Volker}} and {{Rebecca}} |
-->
## Machine Development
@@ -13,12 +20,7 @@ hide:
| :------- | :------------------------------------------------------ | :------------------------------------------- |
| 2 hours | Operator Training | {{Felix}} |
| 2 hours | Investigate tune feeedback drift | {{Masamitsu}}, {{Felix}} |
<!-- | 4 hours | ID characterization | {{Masamitsu}} | -->
| 2 hours | Investigate injection drifts | {{Martin}}, {{Felix}} |
<!-- | 4 hours | BPM3 FW CRC End-to-End checksum to FOFB Datenlink test | {{Boris}}, {{JonasP}} | -->
<!-- | 4 hours | Bunch length/Streak Camera measurements for exotic fill patterns | {{Cigdem}}, {{Micha}}, {{Alessandro}} | -->
<!-- | 1 hours | Test 3HC over voltage reset | {{Renata}}, {{Alessandro}} | -->
<!-- | 1/2 hour | Visit tunnel on 14th of Juli 12:30 to 13:00 | {{Volker}} and {{Rebecca}} | -->
| 4 hours | After summer shutdown: implement ID Optics Feed Forward | {{Masamitsu}}, {{Felix}} |
| 3 hours | After summer shutdown: test cooling PLC upgrade | {{Lukas}} |
| 8 hours | After summer shutdown: test timing | {{Romain}}, {{Felix}} |