@@ -4,7 +4,7 @@ The following mailing lists have been prepared for the SLS 2.0 Operations Manage
* **PSI.SLS-MDM** (SLS 2.0 machine experts are the members)
* **PSI.SLS-UOM** (SLS 2.0 beamline experts are the members)
Please forward membership requests to [felix.armborst@psi.ch](mailto:felix.armborst@psi.ch).
PSD members can register via their secretariat. Other membership requests can be sent to [felix.armborst@psi.ch](mailto:felix.armborst@psi.ch).
There are two associated meeting series:
@@ -13,12 +13,14 @@ There are two associated meeting series:
* Reports on machine development shifts and operation
* Requests for and planning of upcoming machine development shifts
* The agendas of these meetings are available on [indico](https://indico.psi.ch/category/662/)
* Resuming activity for LINAC commissioning in September 2024
* **User Operations Meeting (UOM)** <br>Focused on the beamline development shifts for SLS 2.0
* Target audience are beamline experts and interested machine experts
* Reports on beamline development shifts and operation
* Requests for and planning of upcoming beamline development shifts
* Requests for and planning of upcoming user operations shifts
* The agendas of these meetings are available on [indico](https://indico.psi.ch/category/668/)
* Resuming activity for beamline commissioning in August 2025
Documentation on how to create such a website is available on [gitlab](https://git.psi.ch/pages).
+8 -8
View File
@@ -6,10 +6,10 @@ The SLS 2.0 Operations Manager is [Felix Armborst](mailto:felix.armborst@psi.ch)
* **Develop and steer overall operation, development and shutdown schedule**
* Coordinate with all stakeholders including operations and other accelerator facilities at PSI
* Annual DUO planning
* Report all relevant information including short term machine and beamline development plans at weekly operations meetings
* **Develop and steer beamline and machine development plans**
* Coordinate with machine groups on equipment, control and SW readiness and validation testing
* Planning of annual DUO SLS Operations calender schedule
* Report all relevant information including short term machine and beamline development plans at weekly internal operations meetings (WöBs)
* **Develop and steer machine and beamline development plans**
* Coordinate with **machine** groups on equipment, control and SW readiness and validation testing
* Coordinate with beam dynamics groups on machine development activities
* Coordinate with beamline groups on beamline development activities
* **Develop and steer operator training**
@@ -25,6 +25,7 @@ The SLS 2.0 Operations Manager is [Felix Armborst](mailto:felix.armborst@psi.ch)
* **Prepare and analyse the SLS 2.0 operations statistics**
* Report the annual SLS 2.0 operations statistics at the European Synchrotron Light Sources Workshop (ESLS)
* Write SLS 2.0 part of the annual report "Operation of the PSI Accelerator Facilities"
* Analyse operations statistics with regard to accelerator reliability and propose improvements
The SLS 2.0 Machine Coordinator is [Jonas Kallestrup](mailto:jonas.kallestrup@psi.ch) and has the following mandate:
@@ -32,8 +33,7 @@ The SLS 2.0 Machine Coordinator is [Jonas Kallestrup](mailto:jonas.kallestrup@ps
* **Develop measurement techniques** for hitherto poorly quantified parameters
* **Report** to Bereichsleitungssitzung
The SLS 2.0 Machine Responsible GFA is [Hans Braun](mailto:hans.braun@psi.ch) and has the following mandate:
The SLS 2.0 Area Coordinator is [Juri Honegger](mailto:juri.honegger@psi.ch) and has the following mandate:
The SLS 2.0 Machine Responsible PSD is [Frithjof Nolting](mailto:frithjof.nolting@psi.ch) and has the following mandate:
The SLS 2.0 Area Coordinator is [Juri Honegger](mailto:juri.honegger@psi.ch) and has the following mandate:
The SLS 2.0 Machine Responsible GFA is [Hans Braun](mailto:hans.braun@psi.ch)
The SLS 2.0 Machine Responsible PSD is [Frithjof Nolting](mailto:frithjof.nolting@psi.ch)
+3 -1
View File
@@ -303,7 +303,7 @@
<li><strong>PSI.SLS-MDM</strong> (SLS 2.0 machine experts are the members)</li>
<li>
<p><strong>PSI.SLS-UOM</strong> (SLS 2.0 beamline experts are the members)</p>
<p>Please forward membership requests to <a href="mailto:felix.armborst@psi.ch">felix.armborst@psi.ch</a>.</p>
<p>PSD members can register via their secretariat. Other membership requests can be sent to <a href="mailto:felix.armborst@psi.ch">felix.armborst@psi.ch</a>.</p>
</li>
</ul>
<p>There are two associated meeting series:</p>
@@ -313,6 +313,7 @@
<li>Reports on machine development shifts and operation</li>
<li>Requests for and planning of upcoming machine development shifts</li>
<li>The agendas of these meetings are available on <a href="https://indico.psi.ch/category/662/">indico</a></li>
<li>Resuming activity for LINAC commissioning in September 2024</li>
</ul>
</li>
<li><strong>User Operations Meeting (UOM)</strong> <br>Focused on the beamline development shifts for SLS 2.0 <ul>
@@ -321,6 +322,7 @@
<li>Requests for and planning of upcoming beamline development shifts</li>
<li>Requests for and planning of upcoming user operations shifts</li>
<li>The agendas of these meetings are available on <a href="https://indico.psi.ch/category/668/">indico</a></li>
<li>Resuming activity for beamline commissioning in August 2025</li>
</ul>
</li>
</ul>
+7 -6
View File
@@ -305,12 +305,12 @@
<ul>
<li><strong>Develop and steer overall operation, development and shutdown schedule</strong><ul>
<li>Coordinate with all stakeholders including operations and other accelerator facilities at PSI</li>
<li>Annual DUO planning</li>
<li>Report all relevant information including short term machine and beamline development plans at weekly operations meetings</li>
<li>Planning of annual DUO SLS Operations calender schedule</li>
<li>Report all relevant information including short term machine and beamline development plans at weekly internal operations meetings (WöBs)</li>
</ul>
</li>
<li><strong>Develop and steer beamline and machine development plans</strong><ul>
<li>Coordinate with machine groups on equipment, control and SW readiness and validation testing</li>
<li><strong>Develop and steer machine and beamline development plans</strong><ul>
<li>Coordinate with <strong>machine</strong> groups on equipment, control and SW readiness and validation testing</li>
<li>Coordinate with beam dynamics groups on machine development activities</li>
<li>Coordinate with beamline groups on beamline development activities</li>
</ul>
@@ -334,6 +334,7 @@
<li><strong>Prepare and analyse the SLS 2.0 operations statistics</strong><ul>
<li>Report the annual SLS 2.0 operations statistics at the European Synchrotron Light Sources Workshop (ESLS)</li>
<li>Write SLS 2.0 part of the annual report "Operation of the PSI Accelerator Facilities"</li>
<li>Analyse operations statistics with regard to accelerator reliability and propose improvements</li>
</ul>
</li>
</ul>
@@ -343,9 +344,9 @@
<li><strong>Develop measurement techniques</strong> for hitherto poorly quantified parameters</li>
<li><strong>Report</strong> to Bereichsleitungssitzung</li>
</ul>
<p>The SLS 2.0 Machine Responsible GFA is <a href="mailto:hans.braun@psi.ch">Hans Braun</a> and has the following mandate:</p>
<p>The SLS 2.0 Machine Responsible PSD is <a href="mailto:frithjof.nolting@psi.ch">Frithjof Nolting</a> and has the following mandate:</p>
<p>The SLS 2.0 Area Coordinator is <a href="mailto:juri.honegger@psi.ch">Juri Honegger</a> and has the following mandate:</p>
<p>The SLS 2.0 Machine Responsible GFA is <a href="mailto:hans.braun@psi.ch">Hans Braun</a>
The SLS 2.0 Machine Responsible PSD is <a href="mailto:frithjof.nolting@psi.ch">Frithjof Nolting</a></p>
</article>
File diff suppressed because one or more lines are too long
+4 -4
View File
@@ -2,22 +2,22 @@
<urlset xmlns="http://www.sitemaps.org/schemas/sitemap/0.9">
<url>
<loc>https://sls.gitpages.psi.ch/</loc>
<lastmod>2023-12-10</lastmod>
<lastmod>2023-12-11</lastmod>
<changefreq>daily</changefreq>
</url>
<url>
<loc>https://sls.gitpages.psi.ch/mandate/</loc>
<lastmod>2023-12-10</lastmod>
<lastmod>2023-12-11</lastmod>
<changefreq>daily</changefreq>
</url>
<url>
<loc>https://sls.gitpages.psi.ch/mdm/minutes/</loc>
<lastmod>2023-12-10</lastmod>
<lastmod>2023-12-11</lastmod>
<changefreq>daily</changefreq>
</url>
<url>