update requests
Build and Deploy Documentation / build-and-deploy (push) Successful in 57s

This commit is contained in:
armborst_f committed 2026-11-02 09:19:28 +01:00
1 parent 2e1173c821
commit 30f467219b
1 file changed
+31 -7
+31 -7
View File
@@ -1,32 +1,56 @@
---
title: Pending MD/Tunnel Access Requests
description: Here an overview of pending requests is kept
description: Here information on obtaining timeslots for machine development shifts or maintenance activities is given.
template: main.html
hide:
- toc
---
## Machine Development
* The current machine schedule is available at [https://sls.psi.ch/schedule/.](https://sls.psi.ch/schedule/)
## Machine Development Shifts
Please send shift requests to [felix.armborst@psi.ch](mailto:felix.armborst@psi.ch)
| **Time** | **Description** | **Who** |
* Please send shift requests ahead of the MDM meetings.
* Elog
* Please prepare your shift reports in the elog before the next MDM.
* Any changes made to the machine (e.g., optics, orbit or machine interlock bridges) must be documented in the elog
* Control Room Etiquette
* Please keep voices down in the control room and go elsewhere for intense discussions.
* Please remember to always keep the control room informed, i.e., talk to the operators before starting and after finishing your shift/maintenance/repair work
* Spontaneous on-site shifts, e.g., over the weekend or night should be announced in advance to the control room.
<!-- | **Time** | **Description** | **Who** |
| :------- | :------------------------------------------------------ | :------------------------------------------- |
| 2 hours | Operator Training | {{Felix}} |
| 2 hours | Investigate injection drifts | {{Martin}}, {{Felix}} |
| 4 hours | Test ID Optics Feed Forward | {{Masamitsu}}, {{Felix}} |
| 4 hours | Test ID Pointing Feed Forward | {{Simona}}, {{Jonas}} |
| 4 hours | Test ID Pointing Feed Forward | {{Simona}}, {{Jonas}} | -->
## Tunnel Access
Please send requests for tunnel access to [sls-tunnel-access-requests@psi.ch](mailto:sls-tunnel-access-requests@psi.ch)
Please send requests for tunnel access during the SLS maintenance window () to [sls-tunnel-access-requests@psi.ch](mailto:sls-tunnel-access-requests@psi.ch)
| **Time** | **Description** | **Who** |
* SLS maintenance window
* Usually every Tuesday morning from shortly after 7 AM (**starts wih beam dump**) until 8 PM
* Intended to be used for
* System updates
* IOC updates/restarts
* Short tunnel access (controlled, **not** free access) for urgent work
* 30 minutes after beam dump access is possible without SU (for work taking no longer than 25 minutes)
* Access immediately after beam dump requires SU
* PSYS
* **It is obligatory that anybody accessing the tunnel is trained in the usage of the SLS PSYS**
* Please plan ahead and optimize your work for mimimizing the amount of PSYS interactions
<!-- | **Time** | **Description** | **Who** |
| :------- | :------------------------------------------------------ | :------------------------------------------- |
| 1 hour | X05DA OPTICS: alignment | {{Uwe}}, {{Karsten}} and {{Tino}} |
| 2 hours | X09LB XIL: alignment, i.e. lower FE Slits by 2.2 mm | {{Karsten}} and {{Tino}} |
| 4 hours | X09LB XIL: Check ID Alignment for smaller gap | {{Karsten}} and {{Tino}} |
| 1 hour | X04SA ADDAMS: Check water flow switch | {{Tony}}, {{David}}, |
| 2 hours | Setup dose measurement for UE IDs (X11/X07) + X03 (ref) | {{Rebecca}} and {{Felix}} |
| 2 hours | BDK: clean fibers and exchange diodes | {{Martin}}, {{Sladana}} and {{Felix}} |
| 2 hours | BDK: clean fibers and exchange diodes | {{Martin}}, {{Sladana}} and {{Felix}} | -->