<h1> Minutes of the SLS 2.0 Beam Development Meetings </h1>
## 20/01/2025
## 27/01/2025
**Participants:**
<!--
@@ -19,7 +19,73 @@
{{RomainG}},
{{Simona}},
{{Volker}},
-->{{Boris}}, {{Micha}}, {{Masamitsu}}, {{Jesus}}, {{Volker}}, {{Cigdem}}, {{Jonas}}, {{Felix}}, {{Lukas}}, {{Hans}}, {{Simona}}, {{Micha}}
-->
1. **Introduction**
* **Approval of last minutes**
* All those present confirm the [minutes](https://sls.gitpages.psi.ch/bdm/minutes/#20012025) of the last meeting
* **Communication**
* Please send shift requests for coming week until Friday then I can prepare preliminary schedule for discussion in the meeting
* For the convenience of the operators the machine shift and controlled tunnel access tables are located on dedicated subsites of the SLS 2.0 Operations Management website:
* [Tunnel Access](https://sls.gitpages.psi.ch/tunnel/)
* [Machine Shifts](https://sls.gitpages.psi.ch/shifts/)
* Machine Shift Reports
* Please prepare shift reports in elog. These will be linked in the machine shifts table.
* For SLS 2.0 commissioning shifts a template for the elog entries is prepared and will be automatically loaded when chosing the project "SLS-2 Commissioning" in the SLS Development Logbook
2. **Reports**
* **Linac/LTB Optimization** by {{Volker}}
* ...
* **Booster/BRTL Optimization** by {{Jonas}}
* ...
* **Linac/LTB Optimization** by {{Volker}}
* ...
* **Storage Ring Commissioning** by {{Masamitsu}}
* ...
* **Injection Elements** by {{Martin}}
* ...
* **RF** by {{Lukas}}
* ...
* **Diagnostics** by {{Cigdem}}
* ...
* **BPMs** by {{Boris}}
* ...
* **Remark** from {{Felix}}
* Wait with in advance request schedule / planning until we are out of the woods with the commissioning, i.e, reproducibly can achieve stored and accumulate beam
* [Shift schedule](https://sls.gitpages.psi.ch/shifts/)
* **General commissioning schedule for KW05**
* Operators start RF and Booster until 7:30
* Operator training from 7:30 until 8:30
* Linac/Booster Optimization until 10:00
* Storage Ring Commissioning until 18:00
* Boris BPM development in parallel and after 18:00
* **To Be Investigated**
* Timing
* **Tunnel Access**
* Wednesday morning 8:00 until 11:00 for MIS PLC reboot
Minutes written by {{Felix}}
## 20/01/2025
**Participants:**
{{Boris}}, {{Micha}}, {{Masamitsu}}, {{Jesus}}, {{Volker}}, {{Cigdem}}, {{Jonas}}, {{Felix}}, {{Lukas}}, {{Hans}}, {{Simona}}, {{Micha}}
@@ -122,7 +188,7 @@
* low level panels of VME EVRs are unfortunately not available
* Absence of timing expert unfortunate, updating config file of EVR not yet successful despite involving official substitute for timing expert
* running without backup for thin septum pulser
* high voltage power supplies for booster injection kickers ordered but not yet here (
* high voltage power supplies for booster injection kickers ordered but not yet here
* main and backup failed during commissioning
* 6 months lead time
@@ -195,23 +261,6 @@ Minutes written by {{Felix}}
## 13/01/2025
**Participants:**
<!--
{{Boris}},
{{Cigdem}},
{{Felix}},
{{Hans}},
{{Jan}},
{{Jesus}},
{{Jonas}},
{{Lukas}},
{{Martin}}
{{Masamitsu}},
{{Micha}},
{{Michael}},
{{RomainG}},
{{Simona}},
{{Volker}},
-->
{{Cigdem}}, {{Felix}}, {{Jesus}}, {{Jonas}}, {{Lukas}}, {{Martin}}, {{Masamitsu}}, {{Micha}}, {{Michael}}