@@ -116,7 +116,7 @@ Minutes written by {{Felix}}
## 05/08/2026
**Participants:**
..., {{Felix}}
{{Lukas}}, {{Jonas}}, {{Rebecca}}, {{Micha}}, {{Cigdem}}, {{Masamitsu}}, {{Paolo}}, {{Simona}}, Marco, {{Alessandro}}, {{Masamitsu}}, {{Boris}}, {{Felix}}
1. **Introduction**
@@ -155,59 +155,103 @@ Minutes written by {{Felix}}
* Visitors from Diamond ({{Volker}})
* Zoom am Freitag mit Linac Experten von Diamond (Neven ist vor Ort)
* Maschinenschicht Linac am Samstag, 15 August, ca. 9 bis 14 Uhr
* Startup of SLS and HIPA has Priority over SwissFEL next week
* **Linac/LTB Optimization** by {{Volker}}
* ...
* **Linac/LTB Optimization** by {{Lukas}}
* Startup on Friday
* **Booster/BRTL Optimization** by {{Jonas}}
* ...
* **Storage Ring Optimization** by {{Masamitsu}}
* ...
* Michael prepares corrector corrections for startup with data from Karsten expected on Thursday
* **RF** by {{Lukas}}
* **Linac**
* **Booster**
* Tests starting tomorrow (modifications on control and interlock system)
* **Storage Ring Main RF**
* Tests starting Friday (tunnel sector not yet available)
* Failures of ECMC servers due to network
* Failure of SSA safety controller
* Tests of spare parts
* Restart to nominal conditions in time should be feasible
* **Super-3HC**
* cold
* tuning tomorrow
* **Pulsed Magnets** by {{Martin}}
* ...
* work ongoing for protective covers installation in tunnel
* **Impedances and MBFB kickers** by {{Micha}}
* ...
* fast ion instabilities to be expected for startup
* recommendation: multiple gaps, e.g., 2 equally distributed 30 bucket gaps, {{Alessandro}} needs to check 3HC
* **Diagnostics** by {{Cigdem}}
* ...
* ICT in LTB has been replaced
* Karsten checked if BPM remains aligned, small error with respect to documented value from 2017 identified and corrected
* PCTs
* Old 125 MHz ADC system now off and to be removed, only new crates with 1 Mhz ADC running
* Waldemar took over FW, back on 10th
* Connection to BDC not yet available/tested, i.e., should be bridged for startup
* Interface to RF is there on same fiber connection, should be order of magnitude less noisy
* Main current PVs remain unchanged
* All BLMs now replaced with light tight cable jacket
* **Feedbacks and BPMs** by {{Boris}}
* ...
* **Timing** by {{Romain}}
* ...
* New X-Ray BPM optimized for fast RF response tested with DBPM3 electronics succesfully with 12 keV photons
* 100 nm noise
* beam spectrum agrees well with RF-BPM connected to same electronics
* to be installed permanently in straight X04 for further tests parasitically during beamline commissioning
* Working on improving CBI detection
* RFSoC with 1 interleaved channel now replaced with using all 8 channels enabling direct sampling
* currently 8 turns, next step: 100 ms of post mortem raw data
* next step: remove i-tech frontends and use raw beam data
* **ID Feed Forward** by {{Masamitsu}} and {{Simona}} and {{Dirk}}
* ...
* data for setting up optics FF is taken, HLA is prepared
* New FF tables to be measured
* X09LA U70
* X06 U17
* ID corrector magnets should be ready
* clear for X06
* for X09 Marco will double check
* **Radiation Protection** by {{Rebecca}}
* PX-I needs new first light shift for new U17 ID as if never had permit
* Also First Light: XIL (still waiting for answer from BAG), OPTICS
* **Shift Summaries**
*
* X07 UE38 decoupling using only local skew quadrupoles {{Jonas}}
* UE38 is assumed to be thin skew quad and model based the setpoint for matchinng quads is derived
* open gap LT 4.4 h, closed gap 3.6h, closed with compensation 4.0 h
* impact on beam size also well compensated
* TbT data as function of beam current for standard filling pattern {{Jonas}}
* decoherence changes a lot
* RF group confirms that the impedance and 3HC are both expected to contribute to changing decoherence
* Single bunch measurements {{Alessandro}}
* scanned current and main RF voltage vs bunch length and arrival time, estimating MC,
* RF-LOGs 2293 2294
* more data and measurements required for final results
* generally larger values than design observed, too early for numbers
* Test of new corrector magnet FW on one magnet {{Boris}}
* 10 kHz more signal BW for correctors
* PID replaced by model based FF (requires individual calibration for each power supply)
* Next test: roll out FW to multiple corrector magnets, maybe all correctors next shutdown
3. **Shift Requests**
| **Time** | **Description** | **Who** |
| :------- | :------------------------------------------------------ | :------------------------------------------- |
| 2 hours | Operator Training | {{Felix}} |
| 8-10h | Operator Training | {{Felix}} |
| 4 hours | Operator Startup | {{Felix}} |
| 2 hours | Investigate tune feeedback drift | {{Masamitsu}}, {{Felix}} |
| 2 hours | Investigate injection drifts | {{Martin}}, {{Felix}} |
| 4 hours | implement ID Optics Feed Forward | {{Masamitsu}}, {{Felix}} |
| 3 hours | test cooling PLC upgrade | {{Lukas}} |
| 4 hours | check movable power dividers of linac with beam (Felix calls Paolo as soon as startup is done) | {{Fabio}}, {{Paolo}} |
| 8 hours | test timing | {{Romain}}, {{Felix}} |
| 4 hours | check movable power dividers of linac with beam | {{Fabio}}, {{Paolo}} |
| 2 hours | Investigate tune feeedback drift | {{Masamitsu}}, {{Felix}} |
| 4 hours | implement ID Optics Feed Forward | {{Masamitsu}}, {{Felix}} |
| 2 hours | measure feed forward X06 U17 (not wednesday evening) | {{Simona}} |
| 8 hours | thorough linac setup | {{Volker}}, {{Felix}}, Neven |
| 10-17h | 14.8. for BPM firmware upgrade (trying to fix the FOFB fiber link issue as needed to get a fast orbit interlock) | {{Boris}}, {{JonasP}} |
| 11-22h | 25.8. test of new ring corrector power supply firmware ({{HansJ}} has time from 11-22h), as needed to reach > 1 kHz FOFB 0dB point and better suppress 50 and 90 Hz perturbations & improve general FOFB stability. | {{Boris}}, {{HansJ}} |
| 13-17h | 14.8., 4 hours, for BPM firmware upgrade (trying to fix the FOFB fiber link issue as needed to get a fast orbit interlock) | {{Boris}}, {{JonasP}} |
| 13-16h | 25.8. test cooling PLC upgrade | {{Lukas}} |
| 16-22h | 25.8., 6 hours, test of new ring corrector power supply firmware ({{HansJ}} has time from 11-22h), as needed to reach > 1 kHz FOFB 0dB point and better suppress 50 and 90 Hz perturbations & improve general FOFB stability. | {{Boris}}, {{HansJ}} |
| 2 hours | Investigate injection drifts | {{Martin}}, {{Felix}} |
Minutes written by {{Felix}}