Files
Jungfraujoch/tests
leonarski_fandClaude Opus 5.5 244f3c0f9d rugnux: write the refined geometry as <prefix>_XDS.INP
A rotation run now writes the geometry it integrated at as an XDS input
beside the report: ORGX/ORGY (the PONI, 1-based), DETECTOR_DISTANCE, the
detector axes carrying the tilt, wavelength, the rotation axis the run
integrated at (ProcessResult::used_rotation_axis, after any sign rescue),
oscillation (with an adopted rotation scale), starting angle/frame, data
range, NX/NY/QX/QY, OVERLOAD, sensor thickness, space group and cell (left
commented where the group is not in its number's reference setting),
FRIEDEL'S_LAW per -A and the merged resolution range. HDF5 inputs get the
master file as an x_??????.h5 template and a LIB= line to point at the
reader plugin; a CBF series gets its ???? template and its own frame
numbers. The report names the file (XDS_INPUT=). Conventions per Kabsch
(2010) Acta Cryst. D66, 125-132.

The rotation axis goes out negated: rugnux turns the crystal by -phi about
its axis (IndexAndRefine), XDS by +phi about ROTATION_AXIS. Checked with
XDS IDXREF on two exports (one CBF, one HDF5 via durin): the negated axis
indexes 99.5% / 14% of the spots, rugnux's own sign 37% / 0.04%. On the
CBF set XDS then ran DEFPIX/INTEGRATE/CORRECT from the file unchanged
(apart from the job list): 99.8% complete, ISa 23.3, direct beam within
0.15 px and cell within 0.07 A of rugnux's.

Output only; no result changes.

Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01SVmAWnzCmRKAXVUCdc4iNi
2026-10-09 18:36:25 +02:00
..
2026-08-13 17:03:10 +02:00
2026-09-29 15:57:32 +02:00
2026-07-19 09:39:28 +02:00
2025-05-05 19:32:22 +02:00
2026-09-02 21:17:31 +02:00
2026-10-06 14:03:18 +02:00
2026-04-29 09:50:50 +02:00
2026-09-15 17:09:31 +02:00
2026-09-15 17:09:31 +02:00
2026-09-29 15:57:32 +02:00
2026-10-06 14:03:18 +02:00
2026-08-13 17:03:10 +02:00
2026-09-02 21:17:31 +02:00
2026-09-29 15:57:32 +02:00
2026-05-28 18:48:35 +02:00
2025-05-05 19:32:22 +02:00
2025-06-10 18:14:04 +02:00
2026-09-02 21:17:31 +02:00
2026-09-29 15:57:32 +02:00
2026-09-22 06:48:37 +02:00
2026-09-29 15:57:32 +02:00
2025-11-19 09:40:50 +01:00
2026-04-29 09:50:50 +02:00
2026-08-25 08:21:39 +02:00
2026-09-02 21:17:31 +02:00
2026-09-22 06:48:37 +02:00
2026-08-13 17:03:10 +02:00
2024-11-22 21:25:20 +01:00
2025-10-20 20:43:44 +02:00
2025-04-14 11:52:06 +02:00
2025-11-09 12:42:27 +01:00
2025-09-08 20:28:59 +02:00
2025-09-08 20:28:59 +02:00
2025-03-24 12:16:33 +01:00
2026-10-06 14:03:18 +02:00
2025-06-18 15:19:18 +02:00
2026-09-02 21:17:31 +02:00
2026-09-09 07:25:13 +02:00
2025-12-12 21:24:20 +01:00
2026-02-01 13:29:33 +01:00
2026-03-03 22:24:44 +01:00
2025-11-19 09:40:50 +01:00
2026-09-29 15:57:32 +02:00
2026-08-13 17:03:10 +02:00
2025-05-05 19:32:22 +02:00
2024-11-22 21:25:20 +01:00
2026-10-06 14:03:18 +02:00
2026-09-29 15:57:32 +02:00
2026-09-15 17:09:31 +02:00
2024-11-22 21:25:20 +01:00
2026-09-29 15:57:32 +02:00
2026-06-23 20:29:49 +02:00
2026-09-29 15:57:32 +02:00
2026-09-09 07:25:13 +02:00
2026-09-29 15:57:32 +02:00
2024-11-22 21:25:20 +01:00
2025-03-02 13:15:28 +01:00
2026-06-08 08:30:35 +02:00
2025-11-09 12:42:27 +01:00
2026-08-13 17:03:10 +02:00
2026-09-29 15:57:32 +02:00
2026-09-29 15:57:32 +02:00
2026-08-27 22:16:54 +02:00
2024-11-22 21:25:20 +01:00
2025-11-09 12:42:27 +01:00
2025-10-01 22:54:40 +02:00
2026-09-22 06:48:37 +02:00
2026-09-02 21:17:31 +02:00
2026-09-22 06:48:37 +02:00
2026-09-02 21:17:31 +02:00
2026-06-23 20:29:49 +02:00
2026-06-23 20:29:49 +02:00
2026-06-23 20:29:49 +02:00
2026-09-29 15:57:32 +02:00
2026-09-29 15:57:32 +02:00
2026-10-06 14:03:18 +02:00
2026-10-06 14:03:18 +02:00
2026-10-06 14:03:18 +02:00
2026-09-29 15:57:32 +02:00
2026-03-02 15:57:12 +01:00
2026-09-02 21:17:31 +02:00
2026-09-29 15:57:32 +02:00
2026-06-23 20:29:49 +02:00
2026-04-16 11:59:59 +02:00
2026-06-23 20:29:49 +02:00
2025-11-02 13:45:57 +01:00
2025-12-12 21:24:20 +01:00
2026-09-22 06:48:37 +02:00
2026-10-06 14:03:18 +02:00
2026-05-28 18:48:35 +02:00
2026-10-06 14:03:18 +02:00
2026-09-02 21:17:31 +02:00
2026-10-06 14:03:18 +02:00
2026-10-06 14:03:18 +02:00
2026-09-15 17:09:31 +02:00
2026-03-26 20:50:33 +01:00
2024-11-22 21:25:20 +01:00
2026-09-29 15:57:32 +02:00