fix: according to 6124 planner feedback, use 10 to 20 keV at PXII
CI / lint (push) Skipped
CI / test (3.12) (push) Skipped
CI / test (3.13) (push) Skipped
CI / test-with-beamline-plugins (pxi_bec) (push) Skipped
CI / test-with-beamline-plugins (pxii_bec) (push) Skipped
CI / test-with-beamline-plugins (pxiii_bec) (push) Skipped
CI / lint (pull_request) Successful in 44s
CI / test (3.12) (pull_request) Successful in 1m1s
CI / test (3.13) (pull_request) Successful in 1m3s
CI / test (3.14) (pull_request) Successful in 1m3s
CI / test-with-beamline-plugins (pxi_bec) (pull_request) Successful in 1m8s
CI / test-with-beamline-plugins (pxii_bec) (pull_request) Successful in 1m12s
CI / test-with-beamline-plugins (pxiii_bec) (pull_request) Successful in 1m21s
CI / test-with-coverage (pull_request) Successful in 1m36s
CI / coverage-analysis (pull_request) Successful in 3s
CI / lint (push) Skipped
CI / test (3.12) (push) Skipped
CI / test (3.13) (push) Skipped
CI / test-with-beamline-plugins (pxi_bec) (push) Skipped
CI / test-with-beamline-plugins (pxii_bec) (push) Skipped
CI / test-with-beamline-plugins (pxiii_bec) (push) Skipped
CI / lint (pull_request) Successful in 44s
CI / test (3.12) (pull_request) Successful in 1m1s
CI / test (3.13) (pull_request) Successful in 1m3s
CI / test (3.14) (pull_request) Successful in 1m3s
CI / test-with-beamline-plugins (pxi_bec) (pull_request) Successful in 1m8s
CI / test-with-beamline-plugins (pxii_bec) (pull_request) Successful in 1m12s
CI / test-with-beamline-plugins (pxiii_bec) (pull_request) Successful in 1m21s
CI / test-with-coverage (pull_request) Successful in 1m36s
CI / coverage-analysis (pull_request) Successful in 3s
This commit is contained in:
@@ -12,7 +12,8 @@ from aare.gui.widgets.title_label import TitleLabel
|
||||
# daq.change_energy forwards straight to bec) — confirm the real monochromator
|
||||
# limits with the Beamline Scientist. Shared by both Set Energy rows.
|
||||
# X10SA mono reaches 6-30 keV; others keep the placeholder until confirmed.
|
||||
ENERGY_MIN_KEV, ENERGY_MAX_KEV = (6.0, 30.0) if mx_beamline() == MXBeamline.X10SA else (4.0, 20.0)
|
||||
# in the 6124 planner it says 10 to 20 keV at PXII
|
||||
ENERGY_MIN_KEV, ENERGY_MAX_KEV = (10.0, 20.0) if mx_beamline() == MXBeamline.X10SA else (4.0, 20.0)
|
||||
# "arrived" window for the moving->neutral transition; per-hardware knob like
|
||||
# MotorMoveGroup's tol (the mono never lands exactly on the setpoint)
|
||||
ENERGY_AT_TARGET_TOL_KEV = 0.001
|
||||
|
||||
Reference in New Issue
Block a user