The beacon-period gate in online_notify already rejected a parse failure and a non-positive value, but epicsScanDouble parses "nan" and "inf", and maxPeriod<=0.0 is false for both, so a non-finite period reached the beacon delay loop. A NaN maxdelay makes delay<maxdelay false forever, pinning the beacon interval at the 0.02 s startup value - a ~50 Hz beacon flood on every configured interface; an infinite maxdelay lets the doubling delay grow without bound, silencing beacons entirely. Gate on finite() (from epicsMath.h), matching the client-side EPICS_CA_MAX_SEARCH_PERIOD handling in udpiiu.cpp, and name the actual problem in the diagnostic instead of "float fetch failed" (the message already covered the non-positive case, which is not a fetch failure).
EPICS Base
EPICS (Experimental Physics and Industrial Control System) is a set of software tools and applications which provide a software infrastructure for use in building distributed control systems to operate devices such as Particle Accelerators, Large Experiments and major Telescopes. EPICS Base is the central core of the control system toolkit. More details can be found at the About page of the official website
Links
Documentation
Community Communication
Quick Install
Download a release from the Downloads page and unpack it. Inside the unpacked folder run:
make
For more information on how to install on your system see the Installation page of the documentation.
Quick run a softIOC
After building, you can run an example soft-IOC (Input/Output Controller) which runs a Channel Access server.
./bin/*/softIoc -x first
Run the dbl command to list the records it provides:
epics> dbl
first:BaseVersion
first:exit
epics>
Contributing
See CONTRIBUTING.md.
License
EPICS Base is distributed subject to a Software License Agreement found in the file LICENSE that is included with this distribution.