Flomni commissioning 3 #240

Merged
holler merged 8 commits from flomni_commissioning_3 into main 2026-07-02 08:47:33 +02:00
Member
No description provided.
holler added 7 commits 2026-07-02 08:45:09 +02:00
added predict gap to csaxs
CI for csaxs_bec / test (push) Successful in 1m32s
7676faf3ff
Update predict_gap constants to corrected 3-parameter fit
CI for csaxs_bec / test (push) Successful in 1m33s
10b48d009b
Replace the 4-parameter (quadratic) constants with the 3-parameter
pure-exponential fit from plot_intensity_map.py (operating-locus
calibration, gap-residual RMS ~14 um). c2 was insignificant (0.2 sigma)
and left E_inf degenerate (+/-11 keV).

Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
save roi in pixels with images
CI for csaxs_bec / test (push) Failing after 1m29s
500c1e6c53
added ROI selector to saved datafile
CI for csaxs_bec / test (push) Failing after 1m29s
CI for csaxs_bec / test (pull_request) Failing after 1m27s
c109687cf3
holler added 1 commit 2026-07-02 08:45:20 +02:00
Merge branch 'main' into flomni_commissioning_3
CI for csaxs_bec / test (push) Successful in 1m30s
CI for csaxs_bec / test (pull_request) Successful in 1m33s
8ad8394915
holler merged commit 0972f4971b into main 2026-07-02 08:47:33 +02:00
holler deleted branch flomni_commissioning_3 2026-07-02 08:47:34 +02:00
Sign in to join this conversation.
No Reviewers
No labels
1 Participants
Notifications
Due Date
No due date set.
Dependencies

No dependencies set.

Reference: bec/csaxs_bec#240