added link
All checks were successful
RSE-PSI Website Scheduler / checkout (push) Successful in 32s

This commit is contained in:
Michael Weinold
2026-02-02 15:30:14 +01:00
parent 23a20b169c
commit fde753c991

View File

@@ -2,7 +2,7 @@
## 2025
In 2025, we conducted a staff survey on the state of research software engineering at Paul Scherrer Institut (PSI). The survey was open in September and October 2025, and we received responses from over 50 research software engineers (RSEs) across all centers at PSI. On average, every respondent spent over half an hour on the survey.
In 2025, we conducted a staff survey on the state of research software engineering at Paul Scherrer Institut (PSI). The survey was open in September and October 2025, and we received responses from over 50 research software engineers (RSEs) across all centers at PSI. On average, every respondent spent over half an hour on the survey. The results [are available through the ETH Research Collection](https://doi.org/10.3929/ethz-c-000790389) and can be downloaded below:
<div class="pdf-component" style="border: 1px solid #ccc; border-radius: 6px; overflow: hidden; font-family: sans-serif; margin-bottom: 20px; background-color: #f5f5f5;">