Files
gitea-pages/docs/mandate/index.md

3.7 KiB

Mandate

**Draft - Not Yet Final**

The SLS 2.0 Operations Manager is Felix Armborst and has the following mandate:

  • Develop and steer overall operation, development and shutdown schedule
    • Coordinate with all stakeholders including operations and other accelerator facilities at PSI
    • Planning of annual DUO SLS Operations calender schedule
    • Report all relevant information including short term machine and beamline development plans at weekly internal operations meetings (WöBs)
  • Develop and steer machine and beamline development plans
    • Coordinate with machine groups on equipment, control and SW readiness and validation testing
    • Coordinate with beam dynamics groups on machine development activities
    • Coordinate with beamline groups on beamline development activities
  • Develop and steer operator training
    • Defining theoretical and practical requirements for obtaining different levels (A-, and B-Operator)
    • Preparing and conducting theoretical and practical operator trainings
    • Preparing and conducting theoretical and practical operator exams
  • Handling of any schedule or technical issues
    • Analyse performance impact
    • Develop mitigation measures in collaboration with responsible groups
    • Report possibly resulting investment requirements to machine coordinator
  • Develop and maintain deployment plans for interfaces, high level SW and equipment integration
    • Follow up testing and update planning
    • coordinate with control responsible for the SLS
  • Prepare and analyse the SLS 2.0 operations statistics
    • Report the annual SLS 2.0 operations statistics at the European Synchrotron Light Sources Workshop (ESLS)
    • Write SLS 2.0 part of the annual report "Operation of the PSI Accelerator Facilities"
    • Analyse operations statistics with regard to accelerator reliability and propose improvements

The SLS 2.0 Machine Coordinator is Jonas Kallestrup and has the following mandate:

  • Follow up latest developments in Beam Dynamics / Collevtive Effects simulations and measurements, analyse performance impact and steer studies and mitigations
  • Develop measurement techniques for hitherto poorly quantified parameters
  • Report to
    • Bereichskonferenz 1/month
    • Every other week Extended ASA Meeting on Machine Topics
    • 2 Budget Workshops / year
  • Facilitate maintenance tasks
    • collect information from expert groups
    • compile reports describing equipment to maintained, summarizing possible solutions together with potential timelines and costs.
    • present report to relevant PSI management layers
    • coordinate execution of solutions
  • Address technical aspects limiting SLS 2.0 operation and science, and propose upgrades
    • collect information from expert groups
    • compile reports describing the limitations and their impact on SLS 2.0 operation and science, summarizing possible solutions together with potential timelines and costs.
    • present report to relevant PSI management layers
    • coordinate execution of solutions
  • Liaison with beamlines to ensure that the SLS 2.0 storage ring meets their scientific needs
    • develop and implement beam operation modes that addresses current and future needs of SLS 2.0 beamlines
    • propose and develop novel beam operation modes which may enable so far unexplored science, and survey their applicability to SLS 2.0 beamlines

The SLS 2.0 Area Coordinator is Juri Honegger and has the following mandate:

The SLS 2.0 Machine Responsible GFA is Hans Braun

The SLS 2.0 Machine Responsible PSD is Frithjof Nolting