02/06/2026
-
Introduction
- Communication
- The current machine schedule is available at https://sls.psi.ch/schedule/.
- Machine development shifts with increased sensitivity to vibrations are marked with red text "(No Vibration)"
- Please send shift requests ahead of the UOM meetings.
- Communication
-
Reports
-
Operation
- Vacuum scrubbing since shutdown with installation of elliptical undulator UE38 in X07M
- good start with fast ramp up to 400 mA with acceptable lossratio
- accumulating beam dose fast, i.e., 77 Ah accumulated since shutdown
- lifetime unfortunately not improving since last week, i.e., stuck at 7 hours
- beam size unfortunately also not improving since last week, i.e.,
- horizontal: 11 μm
- vertical: 27 μm
- Scrubbing with closed IDs starting this weekend
- ID measurements
- Feed Forward tables for second UE36_1 and UE38 measured
- FF tables implemented in epics
- Perturbation from UE36_1 found to be larger than previously installed UE36_2 potentially due to measurements happening before alignment
- Vacuum scrubbing since shutdown with installation of elliptical undulator UE38 in X07M
-
Beamline Development Shifts
-
SU checks after shutdown
- went well
-
Polarization switching orbit bump for PolLux
- elog
- Tests show significant perturbation of machine optics including significant blow up of the vertical beam size that will be noticeable by other beamlines
- Dynamic feed forward optics correction will be very challenging
- Further investigations needed
-
Single Bunch Tests SuperXAS
- Issue with broader peak in detector 120 instead of 20 ns from expected still present
- Timing signal from EVR seems to be fine according to timing expert
- From detector side also everything seems to be fine according to beamline expert
- Analysis of event stream and detector data (photons and triggers) and investigation of distribution next step to understand issue, i.e., are photons or events or both fluctuating
-
-
-
Requests
-
PolLux shift for testing single bunch
- parasitically possible with bunch train
- will be done and exchange with SuperXAS on the topic
-
Orbit bumps
- startup next week with same bump settings as end of last year except SIM
-
-
AOB
-
Beamline Info Panels
- Please make sure every beamline expert knows how to open and fully understands the beamline info panel
- e.g., caqtdm -noMsg -noMsg -attach -macro Beamline=X01DA /sls/op/config/qt/X_Info_Panel.ui
- feedback: FOFB information and beam size would be useful on this panel
- beamsize PVs from diagnostic beamlines:
- X01DD-FE-CAM1:SIG-X
- X01DD-FE-CAM1:SIG-Y
- X08DB-FE-CAM1:SIG-X
- X08DB-FE-CAM1:SIG-Y
- Please make sure every beamline expert knows how to open and fully understands the beamline info panel
-
Beamline Phone Numbers
- Beamline overview including telephone at sls.psi.ch
- please take the requirement of having a phone number for your hutch seriously
- please send me an email with your phone number
- Beamline overview including telephone at sls.psi.ch
-
Criticallity of vertical beam size blow up
- Not really but smaller would be better
- No specific threshold
- Corresponding increase of divergence (the observed beam size blow up is an emittance blow up, i.e., beam size and divergence are increased) is more critical
-
Minutes written by {{Felix}}
03/12/2025
-
Introduction
-
Approval of last minutes
- All those present confirm the minutes of the last meeting.
-
Communication
- The current machine schedule is available at https://sls.psi.ch/schedule/.
- Please send shift requests by e-mail ahead of the UOM meetings.
-
-
Agenda
-
Machine Status
- Nominal operation conditions
- 13 hours lifetime at 400 mA
- FPFB is running minimizing the current variation along the bunch train
- top up current thresholds 400 and 403 mA with ~6.5 minutes between each top up
- Machine availability has been ~98 % with an MTTR of ~35 minutes during the last weeks, i.e., since start of user operation
- Nominal operation conditions
-
Operation Schedule
- Operation until Christmas with start of phase 2 shutdown following DUO schedule https://duo.psi.ch/duo/public_calendar.php
- Camshaft Tests for SuperXAS during today's beamline development shift
- If successful we keep the camshaft fill pattern until Sunday
- For Monday the camshaft charge will be reduced to match the average bunch charge of the train
- Remain in regular user operation schedule with
- Machine development from 7 AM on Tuesday until 7AM on Wednesday
- Beamline development from 7 AM until 3 PM on Wednesday
- Reserve weekend 20./21.12. not yet decided
- Would it be ok if we share, i.e, machine development on Sunday from 7 Am until 23 PM and user operation for the remaining time? No!
- Camshaft Tests for SuperXAS during today's beamline development shift
- Operation until Christmas with start of phase 2 shutdown following DUO schedule https://duo.psi.ch/duo/public_calendar.php
-
Beamline Panels
- Please add the beamline operation info panels to your launcher and have it open on your console
- e.g., caqtdm -macro Beamline=X01DD /sls/op/config/qt/X_Info_Panel.ui
- control of beamline and view of machine/total orbit bump for your sourcepoint
- control/view of your absorber/shutter (bend) or gap/shutter (ID)
- small accelerator status overview
- operator messages
- easy access to related panels
- feedback welcome
- panel updates have been made, please restart open panels
- Light Delivery status is now visible
- separate beamline non-expert panel in preparation
- Please add the beamline operation info panels to your launcher and have it open on your console
-
Light Delivery
- When light delivery is available for your beamline type (Dipole / ID) you need to do the following to get light:
- set your attended status to attended or remote
- this will automatically set all CLOSE4OP PVs to enable and the gap control to Experiment
- for dipoles
- enable your absorber and shutter control (...CLOSE4BL PVs)
- open your absober and shutter
- for IDs
- enable your shutter (...CLOSE4BL PV)
- close your gap
- set your attended status to attended or remote
- When light delivery is available for your beamline type (Dipole / ID) you need to do the following to get light:
-
Beamline Phones
- Every beamline should have at least one fixed and possibly also a mobile beamline phone number
- This is mandatory for safety reasons
- It would be great to add these to the beamline contact overview (https://intranet.psi.ch/de/sls-operation/verantwortliche-strahllinien) and also the panels
-
UE36 in X11 from SIM beamline stuck
- 2 hour Tunnel access during yesterdays machine development shift revealed that one of the 4 magnet arrays is stuck and the assumption is that the pneumatic brake is stuck
- transmission train: motor, brake, bearings, spindle
- Roughly half day is required to do the repair.
- Tunnel access must be finished by 2 PM
- Feedback
- Debye is fine
- SuperXAS desperately needs user operation in afternoon
- Tomcat, ADDAMs and PX would prefer a shorter access
- Strategy
- best case finish by 11 AM
- try to finish by 12
- worst case finish tunnel access at 2 PM
- 2 hour Tunnel access during yesterdays machine development shift revealed that one of the 4 magnet arrays is stuck and the assumption is that the pneumatic brake is stuck
-
-
Requests
- Wed., 10.12.2025 (KW50)
- Tunnel access for repair work on UE36
- Wed., 17.12.2025 (KW51)
- requests by mail
- beamline plans exist
- Wed., 10.12.2025 (KW50)
Minutes written by {{Felix}}
05/11/2025
-
Introduction
-
Approval of last minutes
- All those present confirm the minutes of the last meeting.
-
Communication
- The current machine schedule is available at https://sls.psi.ch/schedule/.
- Please send shift requests by e-mail ahead of the UOM meetings.
-
-
Agenda
-
Machine Status
- Back to nominal operation conditions after ID bake efforts out during shutdown, i.e.,
-
12 hours lifetime at 400 mA
- top up current thresholds 400 and 403 mA with ~ 5 to 6 minutes between each top up
-
- Cooling issue encountered over weekend:
- Outage of tunnel air conditioning unit nr. 5 for arc 9 starts Sat. 3:16
- Beam loss due to temp interlock 33 minutes later Sat. 3:49
- Tunnel accesss for cooling piquet to exclude water leak
- Beam limited to ~100 mA after repair of air conditioning unit
- Issue followed by closed valve in cooling circuit of arc 9
- Back to nominal operation conditions after ID bake efforts out during shutdown, i.e.,
-
Operation Schedule
- Operation until Christmas with start of phase 2 shutdown without further interventions following DUO schedule https://duo.psi.ch/duo/public_calendar.php
- First light for PXI today and tomorrow from 07-17:00
- Next week (KW 46) beamline development
- The week after (KW 47) begins user operation until 19.12.
- Reserve weekend 20./21.12. not yet decided
- Operation until Christmas with start of phase 2 shutdown without further interventions following DUO schedule https://duo.psi.ch/duo/public_calendar.php
-
Gitea Migration
- auto deploy repos being migrated now and thus no update for machine software possible
-
Machine Status PVs for Beamlines
- AGEOP-STATUS:INJECTION-ACTIVE
- AGEOP-STATUS:INJECTION-WARMUP
- AGEOP-STATUS:LIGHT-DELIVERY
- AGEOP-STATUS:INJECTION-MODE
- ? AGEOP-STATUS:MACHINE-STATUS (NOMINAL Operation, Beam Loss, ...)
-
Beamline Panels
- Please add the beamline operation info panels to your launcher and have it open on your console
- e.g., caqtdm -macro Beamline=X01DD /sls/op/config/qt/X_Info_Panel.ui
- control of beamline and view of machine/total orbit bump for your sourcepoint
- control/view of your absorber/shutter (bend) or gap/shutter (ID)
- small accelerator status overview
- operator messages
- easy access to related panels
- feedback welcome
- The beamline orbit bump must only be changed in steps of 1 um or urad per second or slower
- other wise the fast orbit feedback might fail
- we need to gather some experience with user controlled bumps - it could be that additional machine protection measures have to be taken to ensure stable operation
- Feedback
- separate expert and user version of X_Info_Panel.ui would be nice
- Please add the beamline operation info panels to your launcher and have it open on your console
-
Top-Up Schemes
- TOMCAT: shorter periodicity preferred, option 2 not required, scan duration anyhow longer than top-up periodicity and lost frames acceptable, depends heavily on how transparent the injection can be made
- Debye: we see a signature of the injection (and pre-injection) on our data. Shorter periodicity would be rather detrimental. With the present injection scheme, Debye would be more wanting to push towards much less frequent top-up
-
Beamline Phones
- Every beamline should have at least one fixed and possibly also a mobile beamline phone number
- This is mandatory for safety reasons
- It would be great to add these to the beamline contact overview (https://intranet.psi.ch/de/sls-operation/verantwortliche-strahllinien) and also the panels
-
-
Requests
- large bumps still possible this and next week afterwards only wednesday morning
- X11MA would like to do some bump tests
- X10DA/SuperXAS would like to do camshaft tests 3.12.
- large bumps still possible this and next week afterwards only wednesday morning
Minutes written by {{Felix}}
24/09/2025
-
Introduction
-
Approval of last minutes
- All those present confirm the minutes of the last meeting.
-
Communication
- The current machine schedule is available at https://sls.psi.ch/schedule/.
- Please send shift requests by e-mail ahead of the UOM meetings.
-
-
Agenda
-
Machine Status
- Limited performance due to high losses and bad lifetime from increased vacuum pressure after X02/U15 and X11/UE36 installation
- Small aperture, 21 mm, 2m long copper vacuum chamber upstream of X11/UE36 was removed and replaced with 40 mm chamber with additional pumping intersection
- Machine performance from loss / lifetime perspective now acceptable
- Beam size remains increased by factor ~2
- For more infos, see last meeting on the topic: https://indico.psi.ch/event/18038/
- Limited performance due to high losses and bad lifetime from increased vacuum pressure after X02/U15 and X11/UE36 installation
-
Operation Schedule
- Operation until October shutdown without further interventions following DUO schedule https://duo.psi.ch/duo/public_calendar.php
- Machine development / scrubbing until 13:00 today
- First light for SIM today from 13-17:00
- First light for I-TOMCAT tomorrow and Friday from 8-17:00
- Beamline development from today until October shutdown
- Machine development next Tuesday and Tuesday until Friday morning the week after
- Operation until October shutdown without further interventions following DUO schedule https://duo.psi.ch/duo/public_calendar.php
-
Beamline Panels
- Please add the beamline operation info panels to your launcher and have it open on your console
- e.g., caqtdm -macro Beamline=X01DD /sls/op/config/qt/X_Info_Panel.ui
- control of beamline and view of machine/total orbit bump for your sourcepoint
- control/view of your absorber/shutter (bend) or gap/shutter (ID)
- small accelerator status overview
- operator messages
- easy access to related panels
- feedback welcome
- The beamline orbit bump must only be changed in steps of 1 um or urad per second or slower
- other wise the fast orbit feedback might fail
- we need to gather some experience with user controlled bumps - it could be that additional machine protection measures have to be taken to ensure stable operation
- Please add the beamline operation info panels to your launcher and have it open on your console
-
Top-Up Schemes
- TOMCAT: shorter periodicity preferred, option 2 not required, scan duration anyhow longer than top-up periodicity and lost frames acceptable, depends heavily on how transparent the injection can be made
- Debye: we see a signature of the injection (and pre-injection) on our data. Shorter periodicity would be rather detrimental. With the present injection scheme, Debye would be more wanting to push towards much less frequent top-up
-
Beamline Phones
- Every beamline should have at least one fixed and possibly also a mobile beamline phone number
- This is mandatory for safety reasons
- It would be great to add these to the beamline contact overview (https://intranet.psi.ch/de/sls-operation/verantwortliche-strahllinien) and also the panels
-
Console issue today
- a significant fraction of the consoles in the control room spontaneously rebooted this morning around 6 thus stopping any local feedback loops and destroying any locally recorded data
- the same is observed on many beamline consoles
-
-
Requests
- X11MA / SIM: 400 mA for first light starting at 13:00 on Wednesday, September 24th, 2025
- X02SA / I-TOMCAT: 60 mA for first light starting at 8:00 on Thursday, September 25th, 2025
- X04SA / ADDAMS: aligning undulator is desired --> possibly Wed. 1st October until 3 PM
Minutes written by {{Felix}}
10/09/2025
-
Introduction
-
Approval of last minutes * All those present confirm the minutes of the last meeting.
-
Communication
- The current machine schedule is available at https://sls.psi.ch/schedule/.
- Please send shift requests by e-mail ahead of the UOM meetings.
-
-
Agenda
-
Machine Status
- Limited performance due to high losses and bad lifetime
- Removal of newly installed UE36 in X11 not yet decided, next decision meeting Wednesday, 17.09.2025
- Ongoing investigations and planning: https://indico.psi.ch/event/18002/
- Operation until then
- Machine development today until evening
- Beamline development from today evening until Monday morning
- Machine development Monday
- Beamline development from Tuesday morning (Powder Diffraction School measurements Tuesday/Wednesday)
- Maybe Shutdown beginning Wednesday evening
- Limited performance due to high losses and bad lifetime
-
Alignment
- Detailed overview: download
- Main takes:
- No actions necessary on beamline side before October shutdown (multiple machine alignment tasks ongoing)
- Final machine alignment only achieved after phase 2 shutdown
- Larger orbit bumps can be provided until completion of phase 2, i.e., ~summer 2026 (by then beamlines should be aligned to the machine)
- Further alignments may become necessary (e.g., due to settlements or incidents)
- For smaller orbit bumps we will provide a tool for the beamlines after the October shutdown
-
Beamline Panels
- Please add the beamline operation info panels to your launcher and have it open on your console
- e.g., caqtdm -macro Beamline=X01DD /sls/op/config/qt/X_Info_Panel.ui
- control of beamline and view of machine/total orbit bump for your sourcepoint
- control/view of your absorber/shutter (bend) or gap/shutter (ID)
- small accelerator status overview
- operator messages
- easy access to related panels
- feedback welcome
- The beamline orbit bump must only be changed in steps of 1 um or urad per second or slower
- other wise the fast orbit feedback might fail
- we need to gather some experience with user controlled bumps - it could be that additional machine protection measures have to be taken to ensure stable operation
- Please add the beamline operation info panels to your launcher and have it open on your console
-
Top-Up Schemes
- Lower and upper beam current thresholds defining top-up (e.g., adjusted for on average 3 min top-up periodicity)
- top-up starting time defined by lifetime and current thresholds
- top-up duration defined by injection efficiency and current thresholds
- advantages: stable average beam current, stable average top-up duration
- disadvantages: gating beamline measurement requires external trigger, i.e., EPICS or timing Event
- Fixed periodicity (e.g., 3 minutes) and upper beam current threshold defining top-up
- top-up starting time predefined by desired periodicity
- top-up duration defined by injection efficiency, current thresholds and lifetime
- advantages: gating beamline measurement with local timer possible, i.e., time until next top-up fixed and known (useful for uninterruptible scanning measurements)
- disadvantages: in rare cases significant fluctuations of beam current and top-up duration possible
- Bunch charge thresholds defining top-up
- top-up starting time defined by lifetime and current thresholds of all individual bunches
- top-up duration is 1 shot, i.e., 1/3 s
- advantages: most stable average current
- disadvantages: same as 1. and many individual top-ups (fine if transparent injection can be achieved)
- Main Questions
- preferred periodicity, i.e., how many minutes?
- preferred top-up scheme?
- comment: current change implies motion of sourcepoint (0.3 um/mA in both planes) giving stronger motivation for option 1
- TOMCAT: shorter periodicity preferred, option 2 not required, scan duration anyhow longer than top-up periodicity and lost frames acceptable, depends heavily on how transparent the injection can be made
- Lower and upper beam current thresholds defining top-up (e.g., adjusted for on average 3 min top-up periodicity)
-
-
Requests
- PX-II bumps
Minutes written by {{Felix}}
27/08/2025
Participants: {{ChristianS}}, {{Jonas}}, {{Felix}}
-
Introduction
- Communication
- The current machine schedule is available at https://sls.psi.ch/schedule/.
- Please send shift requests by e-mail ahead of the UOM meetings.
- Communication
-
Agenda
-
Alignment
- Detailed overview: download
- Main takes:
- No actions necessary on beamline side before October shutdown (multiple machine alignment tasks ongoing)
- Final machine alignment only achieved after phase 2 shutdown
- Larger orbit bumps can be provided until completion of phase 2, i.e., ~summer 2026 (by then beamlines should be aligned to the machine)
- Further alignments may become necessary (e.g., due to settlements or incidents)
- For smaller orbit bumps we will provide a tool for the beamlines after the October shutdown
-
Top-Up Schemes
- Lower and upper beam current thresholds defining top-up (e.g., adjusted for on average 3 min top-up periodicity)
- top-up starting time defined by lifetime and current thresholds
- top-up duration defined by injection efficiency and current thresholds
- advantages: stable average beam current, stable average top-up duration
- disadvantages: gating beamline measurement requires external trigger, i.e., EPICS or timing Event
- Fixed periodicity (e.g., 3 minutes) and upper beam current threshold defining top-up
- top-up starting time predefined by desired periodicity
- top-up duration defined by injection efficiency, current thresholds and lifetime
- advantages: gating beamline measurement with local timer possible, i.e., time until next top-up fixed and known (useful for uninterruptible scanning measurements)
- disadvantages: in rare cases significant fluctuations of beam current and top-up duration possible
- Bunch charge thresholds defining top-up
- top-up starting time defined by lifetime and current thresholds of all individual bunches
- top-up duration is 1 shot, i.e., 1/3 s
- advantages: most stable average current
- disadvantages: same as 1. and many individual top-ups (fine if transparent injection can be achieved)
- Main Questions
- preferred periodicity, i.e., how many minutes?
- preferred top-up scheme?
- comment: current change implies motion of sourcepoint (0.3 um/mA in both planes) giving stronger motivation for option 1
- TOMCAT: shorter periodicity preferred, option 2 not required, scan duration anyhow longer than top-up periodicity and lost frames acceptable, depends heavily on how transparent the injection can be made
- Lower and upper beam current thresholds defining top-up (e.g., adjusted for on average 3 min top-up periodicity)
-
-
Requests
- Monday, 01.09., PSYS tests I-TOMCAT, PX-I, SIM
- Wednesday, 10.09., Reserve I/O (escalation tests?)
- X10SA, PX-II, sicher etwas Maschinen/BL Zeit, um das Alignment zu optimieren
Minutes written by {{Felix}}