| Machine Schedule | Schedule for machine and beamline shifts | schedule.html |
|
2025, KW41
{{ScheduleTableHead()}}
| Mon., 06.10.2025 {{}} |
| 00:00 - 24:00 | {{TopUp400}} | Beamline development | OP shift crew |
| Tue., 07.10.2025 {{}} |
| 00:00 - 07:00 | {{TopUp400}} | Beamline development | OP shift crew |
| 07:00 - 09:00 | {{TopUp400}} | Operator Training | {{Felix}} |
| 09:00 - 24:00 | {{TopUp400}} | MD: optics/ADTS/chrom measurements | {{Jesus}} |
| Wed., 08.10.2025 {{}} |
| 00:00 - 07:00 | {{TopUp400}} | MD Reserve | ?? |
| 07:00 - 09:00 | {{TopUp400}} | Operator Training | {{Felix}} |
| 09:00 - 24:00 | {{Unstable}} | MD: Timing update and test of timing scope | {{Romain}} and {{Felix}} |
| Thu., 09.10.2025 {{}} |
| 00:00 - 07:00 | {{TopUp400}} | MD Reserve | ?? |
| 07:00 - 09:00 | {{TopUp400}} | Operator Training | {{Felix}} |
| 09:00 - 13:00 | {{TopUp400}} | MD: Test of mobile excitation/measurement cart | {{Felix}} and {{Jonas}} |
| 13:00 - 24:00 | {{TopUp400}} | MD: Streak camera and fast diode measurements | {{Cigdem}} and {{Daniel}} |
| 09:00 - 24:00 | {{TopUp400}} | Parallel MD: XBPM Tests | {{Volker}} |
| Fri., 10.10.2025 {{}} |
| 00:00 - 07:00 | {{TopUp400}} | MD Reserve | ?? |
| 07:00 - 09:00 | {{TopUp400}} | Operator Training | {{Felix}} |
| 09:00 - 10:00 | {{TopUp400}} | Prepare user operation | {{Felix}} |
| 10:00 - 24:00 | {{TopUp400}} | Beamline development | OP shift crew |
| Sat., 11.10.2025 {{}} |
| 00:00 - 24:00 | {{TopUp400}} | Beamline development | OP shift crew |
| Sun., 12.10.2025 {{_}} |
| 00:00 - 24:00 | {{TopUp400}} | Beamline development | OP shift crew |
2025, KW40
{{ScheduleTableHead()}}
| Mon., 29.09.2025 {{}} |
| 00:00 - 24:00 | {{TopUp400}} | Beamline development | OP shift crew |
| Tue., 30.09.2025 {{}} |
| 00:00 - 07:00 | {{TopUp400}} | Beamline development | OP shift crew |
| 07:00 - 09:00 | {{TunnelCo}} | Switch X02 / U15 pumps to warm operation | {{RomainG}} and {{Oliver}} |
| 09:00 - 12:00 | {{Unstable}} | MD: measure feed forward for X11 / UE36 | {{Simona}} and {{Masamitsu}} |
| 12:00 - 16:00 | {{Unstable}} | MD: test new booster RF waveform | {{Jonas}} and {{Lukas}} |
| 16:00 - 24:00 | {{Unstable}} | MD: optics/ADTS/chrom measurements | {{Jesus}} |
| Wed., 01.10.2025 {{}} |
| 00:00 - 07:00 | {{TopUp400}} | MD Reserve | |
| 07:00 - 24:00 | {{TopUp400}} | Beamline development | OP shift crew |
| Thu., 02.10.2025 {{}} |
| 00:00 - 24:00 | {{TopUp400}} | Beamline development | OP shift crew |
| Fri., 03.10.2025 {{}} |
| 00:00 - 24:00 | {{TopUp400}} | Beamline development | OP shift crew |
| Sat., 04.10.2025 {{}} |
| 00:00 - 24:00 | {{TopUp400}} | Beamline development | OP shift crew |
| Sun., 05.10.2025 {{_}} |
| 00:00 - 24:00 | {{TopUp400}} | Beamline development | OP shift crew |
2025, KW39
{{ScheduleTableHead()}}
| Mon., 22.09.2025 {{}} |
| 00:00 - 15:00 | {{TunnelFr}} | Replacement of 21 mm vacuum chamber in X11 | {{RomainG}} |
| 15:00 - 15:30 | {{TunnelCo}} | SU Patrol | {{Oliver}} and {{Juri}} |
| 15:30 - 17:00 | {{Unstable}} | Machine Startup | {{Felix}} and OP shift crew |
| 17:00 - 20:00 | {{Unstable}} | Re-establish orbit, injection and optics | {{Jonas}} and {{Masamitsu}} and {{Felix}} |
| 20:00 - 24:00 | {{TopUp400}} | Beam scrubbing | OP Shift Crew |
| Tue., 23.09.2025 {{}} |
| 00:00 - 07:00 | {{TopUp400}} | Beam scrubbing | OP Shift Crew |
| 07:00 - 18:00 | {{Unstable}} | Re-establish orbit, injection and optics | {{Jonas}} and {{Masamitsu}} and {{Felix}} |
| 18:00 - 24:00 | {{Unstable}} | ADTS/optics measurements | {{Jesus}} |
| Wed., 24.09.2025 {{}} |
| 00:00 - 13:00 | {{TopUp400}} | Beam scrubbing | OP Shift Crew |
| 13:00 - 17:00 | {{Unstable}} | First Light X11 / SIM | {{Felix}} and OP Shift Crew |
| 17:00 - 24:00 | {{TopUp400}} | Beamline development | OP shift crew |
| Thu., 25.09.2025 {{}} |
| 00:00 - 07:00 | {{TopUp400}} | Beamline development | OP shift crew |
| 07:00 - 17:00 | {{Unstable}} | First Light X02 / I-TOMCAT | {{Jonas}} and OP Shift Crew |
| 17:00 - 24:00 | {{TopUp400}} | Beamline development | OP shift crew |
| Fri., 26.09.2025 {{}} |
| 00:00 - 07:00 | {{TopUp400}} | Beamline development | OP shift crew |
| 07:00 - 17:00 | {{Unstable}} | First Light X02 / I-TOMCAT | {{Jonas}} and OP Shift Crew |
| 17:00 - 24:00 | {{TopUp400}} | Beamline development | OP shift crew |
| Sat., 27.09.2025 {{}} |
| 00:00 - 24:00 | {{TopUp400}} | Beamline development | OP shift crew |
| Sun., 28.09.2025 {{_}} |
| 00:00 - 24:00 | {{TopUp400}} | Beamline development | OP shift crew |
2025, KW38
{{ScheduleTableHead()}}
| Mon., 15.09.2025 {{}} |
| 00:00 - 07:00 | {{TopUp300}} | Beamline development | OP shift crew |
| 07:00 - 09:00 | {{Unstable}} | Operator training | {{Felix}} |
| 09:00 - 10:00 | {{Unstable}} | ADTS/optics measurements | {{Jesus}} and {{Jonas}} and {{Jonas}} |
| 10:00 - 12:00 | {{Unstable}} | Check X11 Shutter/Stopper and OH Bremsstrahlung | {{OliverC}}, {{ArminK}} and {{Felix}} |
| 10:30 - 14:00 | {{Unstable}} | Timing: switch base delays to ticks, common PVs and local mode fix of bucket shut | {{Romain}} and {{Felix}} |
| 14:00 - 19:00 | {{Unstable}} | Measure feed forward table for U15/X02 | {{Simona}} and {{Masamitsu}} |
| 19:00 - 24:00 | {{Unstable}} | ADTS/optics measurements | {{Jesus}} |
| Tue., 16.09.2025 {{}} |
| 00:00 - 07:00 | {{Unstable}} | Machine development shift | ??? |
| 07:00 - 24:00 | {{TopUp300}} | Beamline development | OP shift crew |
| Wed., 17.09.2025 {{}} |
| 00:00 - 13:00 | {{TopUp300}} | Beamline development | OP shift crew |
| 13:00 - 24:00 | {{TunnelFr}} | Replacement of 21 mm vacuum chamber in X11 | {{RomainG}} |
| Thu., 18.09.2025 {{}} |
| 00:00 - 24:00 | {{TunnelFr}} | Replacement of 21 mm vacuum chamber in X11 | {{RomainG}} |
| Fri., 19.09.2025 {{}} |
| 00:00 - 24:00 | {{TunnelFr}} | Replacement of 21 mm vacuum chamber in X11 | {{RomainG}} |
| Sat., 20.09.2025 {{}} |
| 00:00 - 24:00 | {{TunnelFr}} | Replacement of 21 mm vacuum chamber in X11 | {{RomainG}} |
| Sun., 21.09.2025 {{_}} |
| 00:00 - 24:00 | {{TunnelFr}} | Replacement of 21 mm vacuum chamber in X11 | {{RomainG}} |
2025, KW37
{{ScheduleTableHead()}}
| Mon., 08.09.2025 {{}} |
| 00:00 - 24:00 | {{TopUp400}} | Beamline development | OP shift crew |
| Tue., 09.09.2025 {{}} |
| 00:00 - 07:00 | {{TopUp400}} | Beamline development | OP shift crew |
| 07:00 - 09:00 | {{Unstable}} | Operator training | {{Felix}} and OP shift crew |
| 09:00 - 12:00 | {{Unstable}} | Superbend checks, ARC04 alignment, BPM Cooling upgrade | {{Max}} and {{Romain}} |
| 12:00 - 14:00 | {{Unstable}} | Check BPM stability with new cooling | {{Masamitsu}}|
| 14:00 - 19:00 | {{Unstable}} | Update the base timing delays in the injection chain from us to ticks | {{Romain}} |
| 14:00 - 19:00 | {{Unstable}} | (parasitic) Optimize Kollimator settings | {{Felix}} and {{Masamitsu}} and {{Rebecca}} |
| 19:00 - 24:00 | {{Unstable}} | Machine development shift | ??? |
| Wed., 10.09.2025 {{}} |
| 00:00 - 07:00 | {{Unstable}} | Machine development shift | ??? |
| 07:00 - 14:00 | {{Unstable}} | X11/UE36 Investigations | {{Masamitsu}}, {{Jonas}} and {{Felix}} |
| 18:00 - 24:00 | {{TopUp300}} | Beamline development | OP shift crew |
| Thu., 11.09.2025 {{}} |
| 00:00 - 12:00 | {{TopUp400}} | Beamline development | OP shift crew |
| 12:00 - 13:00 | {{Unstable}} | Machine development shift | {{Jonas}} |
| 13:00 - 24:00 | {{TopUp300}} | Beamline development | OP shift crew |
| Fri., 12.09.2025 {{}} |
| 00:00 - 07:00 | {{TopUp300}} | Beamline development | OP shift crew |
| 07:00 - 09:00 | {{TunnelCo}} | Repair gate valve SuperXAS, SU mapping UE36 | {{Rebecca}} |
| 09:00 - 19:00 | {{TopUp400}} | Beamline development | OP shift crew |
| 19:00 - 24:00 | {{TopUp300}} | Beamline development | OP shift crew |
| Sat., 13.09.2025 {{}} |
| 00:00 - 24:00 | {{TopUp300}} | Beamline development | OP shift crew |
| Sun., 14.09.2025 {{_}} |
| 00:00 - 24:00 | {{TopUp300}} | Beamline development | OP shift crew |
2025, KW36
{{ScheduleTableHead()}}
| Mon., 01.09.2025 {{}} |
| 07:00 - 12:00 | {{No_Light}} | Beamline PSYS tests | OP Shift Crew |
| 12:00 - 15:00 | {{Unstable}} | Machine startup | OP Shift Crew and {{Felix}} |
| 15:00 - 17:00 | {{Unstable}} | Reestablish orbit | {{Masamitsu}} |
| 17:00 - 21:00 | {{Unstable}} | Beam dump kicker tests | {{Martin}} and {{Felix}} |
| 21:00 - 24:00 | {{Unstable}} | Update the base timing delays in the injection chain from us to ticks | {{Romain}} |
| Tue., 02.09.2025 {{}} |
| 00:00 - 07:00 | {{TopUp400}} | BPM Stability Measurements | {{Boris}} |
| 08:00 - 12:00 | {{TopUp400}} | Bunch length measurements | {{Cigdem}} and {{Daniel}} |
| 12:00 - 18:00 | Decaying | Booster RF-ramp tests | {{Lukas}} and {{Jonas}} |
| 18:00 - 24:00 | {{Unstable}} | ADTS Measurements | {{Jesus}} |
| Wed., 03.09.2025 {{}} |
| 00:00 - 07:00 | {{Unstable}} | ADTS Measurements | {{Jesus}} |
| 07:00 - 09:00 | {{Unstable}} | Operator training | {{Felix}} |
| 09:00 - 16:00 | {{No_Light}} | Controlled tunnel access for alignment of 4 AN magnets in ARC4 and ARC5 (Mit SU abgesprochen: kein Rundgang und kein Warten notwendig) | {{Karsten}} and {{Tino}} |
| 16:00 - 18:00 | {{Unstable}} | Reestablish orbit | {{Masamitsu}} |
| 18:00 - 24:00 | {{Unstable}} | Measure/optimize optics | {{Masamitsu}} |
| Thu., 04.09.2025 {{}} |
| 00:00 - 07:00 | {{TopUp400}} | BPM Stability Measurements | {{Boris}} |
| 07:00 - 12:00 | {{Unstable}} | BPM FW/SW Upgrade | {{JonasP}} and {{Boris}} |
| 12:00 - 16:00 | {{Unstable}} | Event Master / FPFB development | {{Romain}} and {{Pedro}} |
| 16:00 - 24:00 | {{Unstable}} | FOFB FW/SW Upgrade | {{Goran}} |
| 16:00 - 24:00 | {{Unstable}} | (Parasitic) Event Master / FPFB development | {{Romain}} and {{Pedro}} |
| Fri., 05.09.2025 {{}} |
| 00:00 - 07:00 | {{TopUp400}} | BPM stability measurements | {{Boris}} |
| 07:00 - 24:00 | {{TopUp400}} | Beamline development | OP shift crew |
| Sat., 06.09.2025 {{}} |
| 00:00 - 24:00 | {{TopUp400}} | Beamline development | OP shift crew |
| Sun., 07.09.2025 {{_}} |
| 00:00 - 24:00 | {{TopUp400}} | Beamline development | OP shift crew |
2025, KW32
Time |
Machine State | Description | Contact |
|---|---|---|---|
| Monday, 04.08.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
00:00 - 10:00 |
400 mA, top up | Beamline development | OP Shift Crew |
10:00 - 24:00 |
unstable | BPM development | {{Boris}} |
| Tuesday, 05.08.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
00:00 - 07:20 |
unstable | BPM development | {{Boris}} |
07:20 - 07:30 |
Beam Dump | Vorebereitung Tunnelzugang Überwacht | OP Shift Crew |
07:30 - 08:00 |
Tunnel access | SU Patrol | {{Oliver}} and {{Rebecca}} |
08:00 - 10:00 |
Tunnel access | Beam Dump Kicker Repair | {{Martin}} |
10:00 - 14:00 |
unstable | FPFB/timing development shift | {{Pedro}} and {{Romain}} |
14:00 - 18:00 |
unstable | Timing development shift | {{Romain}} and {{Felix}} |
18:00 - 24:00 |
400 mA, top up | Machine development reserve | OP Shift Crew |
| Wednesday, 06.08.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
00:00 - 07:00 |
400 mA, top up | Machine development reserve | OP Shift Crew |
07:00 - 09:00 |
unstable | Operator Training | {{Felix}} |
09:00 - 17:00 |
unstable | MBFB development shift | {{Pedro}} and {{Boris}} |
17:00 - 24:00 |
unstable | BRTL dispersion correction + quadrupole scans (+ optics matching) | {{Jonas}} |
| Thursday, 07.08.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
00:00 - 07:30 |
400 mA, top up | Machine development reserve | OP Shift Crew |
07:30 - 08:00 |
No beam | Beam Dump for tunnel access | OP Shift crew |
08:00 - 10:00 |
No beam | Tunnel Access for realignment of 2 AN in sector 6 | {{Tino}} |
10:00 - 12:00 |
unstable | Restore machine orbit/optics | {{Masamitsu}} |
12:00 - 20:00 |
unstable | FOFB development | {{Boris}} |
20:00 - 24:00 |
unstable | BO extraction / SR injection optimization | {{Jonas}}, {{Felix}} and {{Masamitsu}} |
| Friday, 08.08.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
00:00 - 07:00 |
400 mA, top up | Machine development reserve | OP Shift Crew |
07:00 - 10:00 |
unstable | Operator training | {{Felix}} |
10:00 - 18:00 |
unstable | FOFB development | {{Boris}} |
15:00 - 24:00 |
Shutdown {: colspan=3} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
| Saturday, 09.08.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
00:00 - 24:00 |
Shutdown {: colspan=3} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
| Sunday, 10.08.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
00:00 - 24:00 |
Shutdown {: colspan=3} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
2025, KW31
Time |
Machine State | Description | Contact |
|---|---|---|---|
| Monday, 28.07.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
00:00 - 07:00 |
Top-up, 400 mA | Beamline development | OP shift crew |
07:00 - 12:00 |
?? | FPFB/timing development | {{Pedro}} and {{Romain}} |
10:00 - 12:00 |
?? | Parasitic BPM/FB pikett training | {{Boris}} and Co. |
12:00 - 18:00 |
?? | BPM/FOFB development | {{Boris}} and {{Goran}} |
18:00 - 24:00 |
?? | Optics optimization | {{Masamitsu}} |
| Tuesday, 29.07.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
00:00 - 08:00 |
?? | (Remote) Test beta function measurement and cycle magnets after finishing | {{Jonas}} |
08:00 - 10:00 |
?? | BPM/FOFB development | {{Boris}} and {{Goran}} |
10:00 - 18:00 |
?? | Error detection using machine learning | {{Simona}} |
18:00 - 24:00 |
?? | Round beam tests | {{Jonas}} |
| Wednesday, 30.07.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
00:00 - 08:00 |
400 mA, top up | Machine development reserve | OP Shift Crew |
08:00 - 09:00 |
unstable | Beam assisted girder alignment arcs 5 to 8 | {{Michael}} |
09:00 - 09:30 |
Tunnel access | SU Patrol | {{Oliver}} and {{Rebecca}} |
09:30 - 13:00 |
Tunnel access | Repair ethercat for girder mover encoders of ARC8 | Kurt |
09:30 - 13:00 |
Tunnel access | Plinth realignment arcs 5 to 8 | {{Karsten}} |
09:30 - 13:00 |
Tunnel access | Check girder movers for arcs 5 to 8 | {{Max}} and {{FelixM}} |
13:00 - 18:00 |
unstable | Beam assisted girder alignment arcs 5 to 8 | {{Michael}} |
18:00 - 24:00 |
unstable | Optics correction after alignment | {{Masamitsu}} |
| Thursday, 31.07.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
00:00 - 08:00 |
unstable | BPM/FOFB development | {{Boris}} |
08:00 - 14:00 |
?? | Camshaft tests | {{Jonas}} and {{Micha}} |
14:00 - 24:00 |
unstable | BPM/FOFB development | {{Boris}} and {{Goran}} |
| Friday, 01.08.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
00:00 - 10:00 |
unstable | BPM/FOFB development | {{Boris}} |
10:00 - 24:00 |
?? | Optics measurements (LOCO and local dispersion) | {{Masamitsu}} and {{Simona}} |
| Saturday, 02.08.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
00:00 - 20:00 |
400 mA, top up | Beamline development | OP Shift Crew |
20:00 - 24:00 |
unstable | BPM/FOFB development | {{Boris}} |
| Sunday, 03.08.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
00:00 - 08:00 |
unstable | BPM/FOFB development | {{Boris}} |
00:00 - 24:00 |
400 mA, top up | Beamline development | OP Shift Crew |
2025, KW30
Time |
Machine State | Description | Contact |
|---|---|---|---|
| Monday, 21.07.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
00:00 - 07:20 |
Top-up, 400 mA | Beamline development | OP shift crew |
07:20 - 07:30 |
no beam | Beam Dump, Vorbereitung Tunnelzugang Überwacht | OP Shift Crew |
07:30 - 08:00 |
no beam | Freimessung Tunnel durch SU | {{Rebecca}} and {{OliverC}} |
08:00 - 14:00 |
no beam | Realignment of plinths in arcs 9 to 12 | {{Karsten}} and {{Tino}} |
08:00 - 17:00 |
no beam | Escalation tests X12SA (cSAXS) | SPS group |
17:00 - 24:00 |
Top-up, 400 mA | Beamline development | OP shift crew |
| Tuesday, 22.07.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
00:00 - 07:00 |
Top-up, 400 mA | Beamline development | OP shift crew |
07:00 - 10:00 |
unstable, all gaps open | Operator Training | {{Felix}} |
10:00 - 14:00 |
unstable, all gaps open | Beam assisted vertical girder alignment in arcs 9 to 12 | {{Michael}} and {{FelixM}} |
14:00 - 15:00 |
unstable, all gaps open | Test of Event Master Interface to FPFB and of the FPFB | {{Romain}} and {{Pedro}} |
15:00 - 19:00 |
unstable, all gaps open | Upgrade and test of FOFB firmware and software | {{Boris}} |
19:00 - 24:00 |
Top-up, 400 mA | BPM tests | {{Boris}} |
| Wednesday, 23.07.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
00:00 - 07:00 |
Top-up, 400 mA | BPM tests | {{Boris}} |
07:00 - 07:30 |
Top-up, 60 mA | Beam Dump und füllen auf 60 mA | OP shift crew |
07:30 - 17:00 |
Top-up, 60 mA | First light cSAXS | SLS 2.0 Commissioning Team |
17:00 - 24:00 |
Top-up, 400 mA | Beamline development | OP shift crew |
| Thursday, 24.07.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
08:00 - 17:00 |
Top-up, 400 mA | First light cSAXS | SLS 2.0 Commissioning Team |
17:00 - 24:00 |
Top-up, 400 mA | Beamline development | OP shift crew |
| Friday, 25.07.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
00:00 - 24:00 |
Top-up, 400 mA | Beamline development | OP shift crew |
| Saturday, 26.07.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
00:00 - 24:00 |
Top-up, 400 mA | Beamline development | OP shift crew |
| Sunday, 27.07.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
00:00 - 24:00 |
Top-up, 400 mA | Beamline development | OP shift crew |
2025, KW29
Time |
Machine State | Description | Contact |
|---|---|---|---|
| Monday, 14.07.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
00:00 - 24:00 |
Top-up, 400 mA | Pilot user operation | OP shift crew |
| Tuesday, 15.07.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
00:00 - 07:00 |
Top-up, 400 mA | Pilot user operation | OP shift crew |
07:20 - 07:30 |
no beam | Beam Dump, Vorbereitung Tunnelzugang Überwacht | OP Shift Crew |
07:30 - 08:00 |
no beam | Freimessung Tunnel durch SU | {{Rebecca}} and {{OliverC}} |
08:00 - 14:00 |
no beam | Realignment of plinths in arcs 1 to 4 | {{Karsten}} and {{Tino}} |
08:00 - 14:00 |
no beam | Girder mover tests for arcs 1 to 4 | {{FelixM}} and {{Max}} |
14:00 - 20:00 |
unstable, all gaps open | Beam assisted vertical girder alignment in arcs 1 to 4 | {{Michael}} and {{FelixM}} |
20:00 - 24:00 |
unstable, all gaps open | FOFB development | {{Boris}} |
| Wednesday, 16.07.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
00:00 - 07:00 |
unstable, all gaps open | FOFB development | {{Boris}} |
07:00 - 15:00 |
Top-up, 400 mA | Beamline development | OP shift crew |
15:00 - 24:00 |
Top-up, 400 mA | Beamline development | OP shift crew |
| Thursday, 17.07.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
00:00 - 24:00 |
Top-up, 400 mA | Beamline development | OP shift crew |
| Friday, 18.07.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
00:00 - 24:00 |
Top-up, 400 mA | Beamline development | OP shift crew |
| Saturday, 19.07.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
00:00 - 24:00 |
Top-up, 400 mA | Beamline development | OP shift crew |
| Sunday, 20.07.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
00:00 - 24:00 |
Top-up, 400 mA | Beamline development | OP shift crew |
2025, KW28
Time |
Machine State | Description | Contact |
|---|---|---|---|
| Monday, 07.07.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
00:00 - 24:00 |
Top-up, 400 mA | Pilot user operation | OP shift crew |
| Tuesday, 08.07.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
00:00 - 09:00 |
Top-up, 400 mA | Pilot user operation | OP shift crew |
09:00 - 17:00 |
unstable, all gaps open | FOFB development w. crossbar test | {{Boris}} and Jonas |
17:00 - 00:00 |
unstable, all gaps open | FOFB development | {{Boris}} |
09:00 - 00:00 |
unstable, all gaps open | FPFB development in parallel | {{Romain}} and {{Pedro}} |
| Wednesday, 09.07.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
00:00 - 07:00 |
unstable, Top-up, 400 mA | machine development reserve w. crossbar ON | ??? |
07:20 - 07:30 |
no beam | Beam Dump, Vorbereitung Tunnelzugang Überwacht | OP Shift Crew |
07:30 - 08:00 |
no beam | Freimessung Tunnel durch SU | {{Rebecca}} and {{OliverC}} |
08:00 - 10:00 |
no beam | Escalation tests X07DB (ISS) | {{Tony}} and {{Joerg}} |
10:00 - 15:00 |
Top-up, 60 - 400 mA | First light X07DB (ISS) | {{Joerg}} |
15:00 - 24:00 |
Top-up, 400 mA | Pilot user operation | OP shift crew |
| Thursday, 10.07.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
00:00 - 24:00 |
Top-up, 400 mA | Pilot user operation | OP shift crew |
| Friday, 11.07.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
00:00 - 24:00 |
Top-up, 400 mA | Pilot user operation | OP shift crew |
| Saturday, 12.07.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
00:00 - 24:00 |
Top-up, 400 mA | Pilot user operation | OP shift crew |
| Sunday, 13.07.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
00:00 - 24:00 |
Top-up, 400 mA | Pilot user operation | OP shift crew |
2025, KW27
Time |
Machine State | Description | Contact |
|---|---|---|---|
| Monday, 30.06.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
00:00 - 24:00 |
Top-up, 400 mA | Beamline development | OP shift crew |
| Tuesday, 01.07.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
00:00 - 07:00 |
Top-up, 400 mA | Beamline development | OP shift crew |
07:00 - 10:00 |
unstable, all gaps open | operator training | {{Felix}} |
08:00 - 10:00 |
unstable, all gaps open | RF HLA update | {{Roger}} |
10:00 - 13:00 |
unstable, all gaps open | BPM noise tests | {{Boris}} |
13:00 - 15:00 |
unstable, all gaps open | BPM/Feedbacks piquet training | {{Boris}} and machine experts |
15:00 - 23:00 |
unstable, all gaps open | FPFB development | {{Pedro}} and {{Romain}} |
15:00 - 23:00 |
unstable, all gaps open | Amplitude dependant tune shift measurement | {{Jesus}} and {{Jonas}} |
23:00 - 24:00 |
unstable, all gaps open | FOFB development | {{Boris}} |
| Wednesday, 02.07.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
00:00 - 03:00 |
unstable, all gaps open | machine development reserve | ??? |
03:00 - 24:00 |
Top-up, 400 mA | Pilot user operation | OP shift crew |
| Thursday, 03.07.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
00:00 - 24:00 |
Top-up, 400 mA | Pilot user operation | OP shift crew |
| Friday, 04.07.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
00:00 - 24:00 |
Top-up, 400 mA | Pilot user operation | OP shift crew |
| Saturday, 05.07.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
00:00 - 24:00 |
Top-up, 400 mA | Pilot user operation | OP shift crew |
| Sunday, 06.07.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
00:00 - 24:00 |
Top-up, 400 mA | Pilot user operation | OP shift crew |
2025, KW26
Time |
Machine State | Description | Contact |
|---|---|---|---|
| Monday, 23.06.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
00:00 - 24:00 |
Top-up, 400 mA | Beamline development | OP shift crew |
| Tuesday, 24.06.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
00:00 - 07:00 |
Top-up, 400 mA | Beamline development | OP shift crew |
07:00 - 09:00 |
unstable, all gaps open | operator training | {{Felix}} |
09:00 - 17:00 |
unstable, all gaps open | FOFB development ??FOFB | {{Boris}} and Jonas |
17:00 - 18:00 |
unstable, all gaps open | pointing in X01DD | {{Cigdem}} and {{Masamitsu}} |
18:00 - 24:00 |
unstable, all gaps open | FOFB development | {{Boris}} |
| Wednesday, 25.06.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
00:00 - 07:30 |
unstable, all gaps open | FOFB development | {{Boris}} |
07:30 - 08:00 |
unstable | Beam Dump and refill to 60 mA | OP shift crew |
08:00 - 17:00 |
Top-up, 60 mA | First light (PX-II and S-TOMCAT) | SLS 2.0 Commissioning Team |
17:00 - 24:00 |
unstable, all gaps open | FOFB development | {{Boris}} |
| Thursday, 26.06.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
00:00 - 08:00 |
unstable, all gaps open | FOFB development | {{Boris}} |
08:00 - 17:00 |
Top-up, 400 mA | First light (PX-II and S-TOMCAT) | SLS 2.0 Commissioning Team |
17:00 - 24:00 |
unstable, all gaps open | FOFB development | {{Boris}} |
| Friday, 27.06.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
00:00 - 07:00 |
unstable, all gaps open | FOFB development | {{Boris}} |
07:00 - 17:00 |
Top-up, 400 mA | First light (PX-II and S-TOMCAT) | SLS 2.0 Commissioning Team |
17:00 - 24:00 |
Top-up, 400 mA | Beamline development | OP shift crew |
| Saturday, 28.06.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
00:00 - 24:00 |
Top-up, 400 mA | Beamline development | OP shift crew |
| Sunday, 29.06.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
00:00 - 24:00 |
Top-up, 400 mA | Beamline development | OP shift crew |
2025, KW25
Time |
Machine State | Description | Contact |
|---|---|---|---|
| Monday, 16.06.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
00:00 - 24:00 |
top up, 400 mA | Beamline Development | OP Shift Crew |
| Tuesday, 17.06.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
00:00 - 08:00 |
top up, 400 mA | Beamline Development | OP Shift Crew |
08:00 - 10:00 |
no beam | LLRF updates (Post Mortem Trigger) | {{Lukas}}, {{Roger}}, {{Zheqiao}} and {{Radoslaw}} |
10:00 - 13:00 |
unstable | Timing Development | {{Romain}} and {{Felix}} |
13:00 - 24:00 |
unstable | FPFB Development | {{Pedro}} and {{Romain}} |
14:00 - 24:00 |
unstable | FOFB Development (remote) | {{Boris}} |
| Wednesday, 18.06.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
00:00 - 07:20 |
unstable | FOFB Development | {{Boris}} |
07:20 - 07:30 |
no beam | Beam Dump, Vorbereitung Tunnelzugang Überwacht | OP Shift Crew |
07:30 - 08:00 |
no beam | Freimessung Tunnel durch SU | {{OliverC}} |
08:00 - 14:00 |
no beam | Linac Optimization | {{Simona}}, {{Jonas}} and {{Fabio}} |
08:00 - 14:00 |
no beam | Vorbereitungsarbeiten Beamline Inbetriebnahmen | {{Juri}} |
14:00 - 17:00 |
unstable | Maschine hochfaren | OP Shift Crew |
17:00 - 24:00 |
top up, 400 mA | Beamline Development | OP Shift Crew |
| Thursday, 19.06.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
00:00 - 15:00 |
top up, 400 mA | Beamline Development | OP Shift Crew |
15:00 - 22:00 |
unstable | FOFB Development (remote) | {{Boris}} |
22:00 - 24:00 |
top up, 400 mA | Beamline Development | OP Shift Crew |
| Friday, 20.06.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
00:00 - 24:00 |
top up, 400 mA | Beamline Development | OP Shift Crew |
| Saturday, 21.06.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
00:00 - 24:00 |
top up, 400 mA | Beamline Development | OP Shift Crew |
| Sunday, 22.06.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
00:00 - 24:00 |
top up, 400 mA | Beamline Development | OP Shift Crew |
2025, KW24
Time |
Machine State | Description | Contact |
|---|---|---|---|
| Monday, 09.06.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
00:00 - 24:00 |
top up, 400 mA | Beam scrubbing | OP Shift Crew |
| Tuesday, 10.06.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
00:00 - 06:50 |
top up, 400 mA | Beam scrubbing | OP Shift Crew |
06:50 - 07:00 |
no beam | Beam Dump, Vorbereitung Tunnelzugang Überwacht | OP Shift Crew |
07:00 - 07:30 |
no beam | Freimessung Tunnel durch SU | {{OliverC}} |
07:30 - 14:00 |
no beam | Vorbereitungsarbeiten Beamline Inbetriebnahmen | {{Juri}} |
14:00 - 15:00 |
unstable | Maschine hochfaren | OP Shift Crew |
15:00 - 22:00 |
unstable | FOFB Development | {{Boris}} |
22:00 - 24:00 |
top up, 400 mA | Beam scrubbing | OP Shift Crew |
| Wednesday, 11.06.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
00:00 - 08:00 |
top up, 400 mA | Beam scrubbing | OP Shift Crew |
08:00 - 14:00 |
unstable | FOFB Development | {{Boris}} |
14:00 - 22:00 |
unstable | FPFB Development | {{Romain}} and {{Pedro}} |
22:00 - 24:00 |
top up, 400 mA | Beam scrubbing | OP Shift Crew |
| Thursday, 12.06.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
00:00 - 08:00 |
top up, 400 mA | Beam scrubbing | OP Shift Crew |
08:00 - 14:00 |
unstable | FOFB Development | {{Boris}} |
14:00 - 15:00 |
no beam | Tunnel Access for Kicker 2 | {{RomainG}} and {{Martin}} |
15:00 - 24:00 |
unstable | Beamline Development | OP Shift Crew |
| Friday, 13.06.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
00:00 - 24:00 |
top up, 400 mA | Beamline Development | OP Shift Crew |
| Saturday, 14.06.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
00:00 - 24:00 |
top up, 400 mA | Beamline Development | OP Shift Crew |
| Sunday, 15.06.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
00:00 - 24:00 |
top up, 400 mA | Beamline Development | OP Shift Crew |
2025, KW23
Time |
Machine State | Description | Contact |
|---|---|---|---|
| Monday, 02.06.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
00:00 - 06:50 |
top up, 400 mA | Beam scrubbing | OP Shift Crew |
06:50 - 07:00 |
no beam | Beam Dump, Vorbereitung Tunnelzugang Überwacht | OP Shift Crew |
07:00 - 07:30 |
no beam | Freimessung Tunnel durch SU | {{OliverC}} |
07:30 - 17:00 |
no beam | Vorbereitungsarbeiten Beamline Inbetriebnahmen | {{Juri}} |
17:00 - 20:00 |
unstable | Maschine hochfaren | OP Shift Crew |
20:00 - 24:00 |
top up, 400 mA | Beam scrubbing | OP Shift Crew |
| Tuesday, 03.06.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
00:00 - 06:50 |
top up, 400 mA | Beam scrubbing | OP Shift Crew |
06:50 - 07:00 |
no beam | Beam Dump, Vorbereitung Tunnelzugang Überwacht | OP Shift Crew |
07:00 - 07:30 |
no beam | Freimessung Tunnel durch SU | {{OliverC}} |
07:30 - 17:00 |
no beam | Vorbereitungsarbeiten Beamline Inbetriebnahmen | {{Juri}} |
17:00 - 20:00 |
unstable | Maschine hochfaren | OP Shift Crew |
20:00 - 24:00 |
top up, 400 mA | Beam scrubbing | OP Shift Crew |
| Wednesday, 04.06.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
00:00 - 06:50 |
top up, 400 mA | Beam scrubbing | OP Shift Crew |
06:50 - 07:00 |
no beam | Beam Dump, Vorbereitung Tunnelzugang Überwacht | OP Shift Crew |
07:00 - 07:30 |
no beam | Freimessung Tunnel durch SU | {{OliverC}} |
07:30 - 17:00 |
no beam | Vorbereitungsarbeiten Beamline Inbetriebnahmen | {{Juri}} |
17:00 - 20:00 |
unstable | Maschine hochfaren | OP Shift Crew |
20:00 - 24:00 |
top up, 400 mA | Beam scrubbing | OP Shift Crew |
| Thursday, 05.06.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
00:00 - 06:50 |
top up, 400 mA | Beam scrubbing | OP Shift Crew |
06:50 - 07:00 |
no beam | Beam Dump, Vorbereitung Tunnelzugang Überwacht | OP Shift Crew |
07:00 - 07:30 |
no beam | Freimessung Tunnel durch SU | {{OliverC}} |
07:30 - 17:00 |
no beam | Vorbereitungsarbeiten Beamline Inbetriebnahmen | {{Juri}} |
17:00 - 20:00 |
unstable | Maschine hochfaren | OP Shift Crew |
20:00 - 24:00 |
top up, 400 mA | Beam scrubbing | OP Shift Crew |
| Friday, 06.06.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
00:00 - 06:50 |
top up, 400 mA | Beam scrubbing | OP Shift Crew |
06:50 - 07:00 |
no beam | Beam Dump, Vorbereitung Tunnelzugang Überwacht | OP Shift Crew |
07:00 - 07:30 |
no beam | Freimessung Tunnel durch SU | {{OliverC}} |
07:30 - 17:00 |
no beam | Vorbereitungsarbeiten Beamline Inbetriebnahmen | {{Juri}} |
17:00 - 20:00 |
unstable | Maschine hochfaren | OP Shift Crew |
20:00 - 24:00 |
top up, 400 mA | Beam scrubbing | OP Shift Crew |
| Saturday, 07.06.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
00:00 - 24:00 |
top up, 400 mA | Beam scrubbing | OP Shift Crew |
| Sunday, 08.06.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
00:00 - 24:00 |
top up, 400 mA | Beam scrubbing | OP Shift Crew |
2025, KW22
Time |
Machine State | Description | Contact |
|---|---|---|---|
| Monday, 26.05.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
08:00 - 10:00 |
unstable | OP Training | {{Felix}} |
10:00 - 14:00 |
mA? | Beam current vs beam size check | {{Cigdem}} and {{Felix}} |
14:00 - 22:00 |
mA? | MBFB Development | {{Boris}} and {{Pedro}} |
22:00 - 08:00 |
top up, 400 mA | Beam scrubbing | OP Shift Crew |
| Tuesday, 27.05.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
06:00 - 12:00 |
top up, 400 mA | Vorbereitung Beamline SU Permit Validation SuperXAS | {{OliverC}} and {{Maarten}} |
08:30 - 09:00 |
decaying beam | Linac Modulator 1 SF6 auffüllen | {{Dani}} |
12:00 - 14:00 |
unstable | Check cabling/connection Timing/FPFB (GPACs) | {{Romain}} and {{Pedro}} |
14:00 - 20:00 |
unstable | Check Timing Master FP control local mode | {{Romain}} and {{Felix}} |
20:00 - 08:00 |
top up, 400 mA | Beam scrubbing | OP Shift Crew |
| Wednesday, 28.05.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
08:00 - 10:00 |
top up, 400 mA | Beamline SU Permit Validation Pollux/SuperXAS | {{OliverC}} and {{Joerg}} and {{Maarten}} |
10:00 - 12:00 |
unstable | Postmortem trigger alignment | {{Romain}}, {{Roger}}, {{Cigdem}} and {{Felix}} |
12:00 - 22:00 |
unstable | FOFB/MBFB Development | {{Boris}} and {{Pedro}} and {{Goran}} |
22:00 - 24:00 |
top up, 400 mA | Beam scrubbing | OP Shift Crew |
| Thursday, 29.05.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
00:00 - 24:00 |
top up, 400 mA | Beam scrubbing (Ascension) | OP Shift Crew |
| Friday, 30.05.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
00:00 - 10:00 |
top up, 400 mA | Beam scrubbing | OP Shift Crew |
10:00 - 14:30 |
unstable | Injection studies | {{Masamitsu}} and {{Martin}} |
14:30 - 20:00 |
unstable | Reduce beam size and measure the PSF of the zone plate setup | {{Cigdem}} and {{Masamitsu}} |
20:00 - 24:00 |
top up, 400 mA | Beam scrubbing | OP Shift Crew |
| Saturday, 31.05.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
00:00 - 24:00 |
top up, 400 mA | Beam scrubbing | OP Shift Crew |
| Sunday, 01.06.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
00:00 - 24:00 |
top up, 400 mA | Beam scrubbing | OP Shift Crew |
2025, KW21
Time |
Machine State | Description | Contact |
|---|---|---|---|
| Monday, 19.05.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
00:00 - 24:00 |
Shutdown | X04 Frontend Repair | {{Reno}} |
08:00 - 18:00 |
Beamline Development | X07DA/Pollux - Shutter, PLC and PSYS Tests | {{Tony}} |
| Tuesday, 20.05.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
00:00 - 15:00 |
Shutdown | X04 Frontend Repair | {{Reno}} |
08:00 - 15:00 |
Beamline Development | X07DA/Pollux - Escalation Tests | {{Tony}} |
15:00 - 18:00 |
Machine Startup | Startup | COM Team |
18:00 - 08:00 |
top up, 400 mA | Scrubbing | OP Shift Crew |
| Wednesday, 21.05.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
08:00 - 18:00 |
top up, 60 mA | First Light ADDAMS, Pollux & SuperXAS | {{Felix}} |
18:00 - 08:00 |
top up, 400 mA | Beam scrubbing | OP Shift Crew |
| Thursday, 22.05.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
08:00 - 10:00 |
Tunnel Access | SLS tour for 5-way meeting | {{Thomas}} |
10:00 - 12:00 |
Machine Startup | Startup | COM Team |
12:00 - 18:00 |
top up, 40 mA | First Light ADDAMS, Pollux & SuperXAS | {{Felix}} |
18:00 - 08:00 |
top up, 400 mA | Beam scrubbing | OP Shift Crew |
| Friday, 23.05.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
08:00 - 18:00 |
top up, 40 mA | First Light ADDAMS, Pollux & SuperXAS | {{Felix}} |
18:00 - 24:00 |
top up, 400 mA | Beam scrubbing | OP Shift Crew |
| Saturday, 24.05.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
00:00 - 24:00 |
top up, 400 mA | Beam scrubbing | OP Shift Crew |
| Sunday, 25.05.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
00:00 - 24:00 |
top up, 400 mA | Beam scrubbing | OP Shift Crew |
2025, KW20
Time |
Machine State | Description | Contact |
|---|---|---|---|
| Monday, 12.05.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
10:00 - 12:00 |
unstable | LLRF Tests | {{Lukas}} and {{Roger}} |
14:00 - 16:00 |
unstable | LLRF FW-Update FO-Strahlstrom basierte Anpassung der HF-Limiten | {{Roger}} |
20:00 - 08:00 |
top up, 400 mA | Beam scrubbing | OP Shift Crew |
| Tuesday, 13.05.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
08:00 - 09:20 |
unstable | OP Training | {{Felix}} |
09:20 - 14:00 |
decaying beam, 200 mA | Booster Optimization | {{Jonas}} |
09:20 - 14:00 |
decaying beam, 200 mA, no OFB | Check implementation of ID feedforward for X04 (elog) | {{Simona}} and {{Masamitsu}} |
14:00 - 20:00 |
unstable | Optics refinement | {{Masamitsu}} and {{Boris}} |
20:00 - 08:00 |
top up, 400 mA | Beam scrubbing | OP Shift Crew |
| Wednesday, 14.05.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
08:00 - 09:00 |
unstable | OP Training | {{Felix}} |
09:00 - 14:00 |
decaying beam, 400 mA | Vertical girder alignment with the girder mover system for sector 8 (elog) | {{Michael}} |
14:00 - 20:00 |
unstable | MBFB Development | {{Boris}} |
20:00 - 09:00 |
top up, 400 mA | Beam scrubbing | OP Shift Crew |
| Thursday, 15.05.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
09:00 - 14:00 |
unstable | SU Collimators (and Dump) | {{Felix}} and SU |
14:00 - 20:00 |
unstable | 3HC tuning / bunch lengthening optimization for 30 bucket gap and camshaft investigations | {{Micha}}, {{Alessandro}}, {{Helge}}, {{Cigdem}} and {{Felix}} |
20:00 - 08:00 |
top up, 400 mA | Beam scrubbing | OP Shift Crew |
| Friday, 16.05.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
08:00 - 10:00 |
unstable | Finish check new timing version | {{Felix}} and {{Romain}} |
10:00 - 14:00 |
unstable | 3HC tuning / bunch lengthening optimization for 30 bucket gap and camshaft investigations | {{Micha}}, {{Alessandro}}, {{Helge}}, {{Cigdem}} and {{Felix}} |
| SHUTDOWN (DUO PLAN) {: colspan=3} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
2025, KW19
Time |
Description | Contact |
|---|---|---|
| Friday, 09.05.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
07:30 - 08:00 |
Sperre Shutter und Strahlfreigabe | SU |
08:00 - 18:00 |
Test new timing version and machine startup | {{Romain}} and {{Felix}} |
18:00 - 24:00 |
Beam scrubbing | OP Shift Crew |
| Saturday, 10.05.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
00:00 - 24:00 |
Beam scrubbing | OP Shift Crew |
| Sunday, 11.05.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
00:00 - 11:00 |
Beam scrubbing | OP Shift Crew |
11:00 - 21:00 |
Booster injection/ramp optimization | {{Jonas}} |
11:00 - 21:00 |
Storage ring tune based optics measurements | {{Jesus}} |
21:00 - 08:00 |
Beam scrubbing over night | OP Shift Crews and {{Felix}} |
2025, KW16
Time |
Description | Contact |
|---|---|---|
| Monday, 14.04.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
08:00 - 11:00 |
OP training injector | SLS OP IB Team |
11:00 - 18:00 |
SOFB | {{Boris}} |
18:00 - 08:00 |
Beam scrubbing over night | OP Shift Crews and {{Felix}} |
| Tuesday, 15.04.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
08:00 - 10:00 |
OP training injector | SLS OP IB Team |
10:00 - 14:00 |
SOFB test new FW | {{Boris}} |
14:00 - 18:00 |
LLRF-Tests -Messungen und -Optimierung | {{Roger}} and {{Radoslaw}} |
18:00 - 22:00 |
SOFB test new FW | {{Boris}} |
22:00 - 08:00 |
Beam scrubbing over night | OP Shift Crews and {{Felix}} |
| Wednesday, 16.04.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
07:30 - 08:00 |
SU Freimessung Tunnel | {{OliverC}} |
| SHUTDOWN (DUO PLAN) {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
2025, KW15
Time |
Description | Contact |
|---|---|---|
| Monday, 07.04.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
08:00 - 11:00 |
Bunch lengthening optimization using 3HC and streak camera | {{Micha}}, {{Alessandro}} and {{Cigdem}} |
11:00 - 18:00 |
SOFB | {{Boris}} and {{Goran}} |
18:00 - 07:30 |
Beam scrubbing over night | OP Shift Crews and {{Felix}} |
| Tuesday, 08.04.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
07:30 - 24:00 |
Tunnel Access {: colspan=3} | ⁠ {: style="padding:0"} |
| Wednesday, 09.04.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
00:00 - 12:00 |
Tunnel Access {: colspan=3} | ⁠ {: style="padding:0"} |
12:00 - 14:00 |
Machine Startup | |
14:00 - 19:00 |
SOFB | {{Boris}} |
19:00 - 24:00 |
Optics measurements | {{Jesus}} and {{Jonas}} |
| Thursday, 10.04.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
08:00 - ??:?? |
Machine Startup | ... |
??:?? - ??:?? |
SLS 2.0 first light at beamlines PX-III and Debye (60 mA, shutters closed) | ... |
??:?? - ??:?? |
SLS 2.0 first light at beamlines PX-III and Debye (ramp up to 400 mA, shutters open) | ... |
18:00 - 24:00 |
Optics measurements | {{Jesus}} and {{Jonas}} |
| Friday, 11.04.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
??:?? - ??:?? |
SLS 2.0 first light at beamlines PX-III and Debye (400 mA, shutters open, light in experiments) | ... |
18:00 - 24:00 |
Optics measurements | {{Jesus}} and {{Jonas}} |
24:00 - 08:00 |
Beam scrubbing over weekend | OP Shift Crews and {{Felix}} |
| Sunday, 13.04.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
10:00 - 18:00 |
Optics measurements | {{Jesus}} and {{Jonas}} |
2025, KW14
Time |
Description | Contact |
|---|---|---|
| Monday, 31.03.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
08:00 - 11:00 |
OP training injector | SLS OP IB Team |
11:00 - 12:00 |
Current increase | SLS COM Team |
12:00 - 18:00 |
SOFB commissioning | {{Boris}} |
18:00 - 08:00 |
Beam scrubbing over night | OP Shift Crews and {{Felix}} |
| Tuesday, 01.04.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
08:00 - 12:00 |
Tunnel Access {: colspan=3} | ⁠ {: style="padding:0"} |
12:00 - 16:00 |
timing tests | {{Romain}} and {{Felix}} |
16:00 - 17:00 |
Current increase | SLS COM Team |
18:00 - 08:00 |
Beam scrubbing over night | OP Shift Crews and {{Felix}} |
| Wednesday, 02.04.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
08:00 - 10:00 |
OP training injector | SLS OP IB Team |
10:00 - 14:00 |
Measure beta functions and ADTS | {{Jesus}} |
14:00 - 15:00 |
Current increase | SLS COM Team |
15:00 - 18:00 |
booster extraction | {{Jonas}} |
18:00 - 08:00 |
Beam scrubbing over night | OP Shift Crews and {{Felix}} |
| Thursday, 03.04.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
08:00 - 10:00 |
OP training injector | SLS OP IB Team |
10:00 - 14:00 |
LLRF-Tests -Messungen und -Optimierung | {{Lukas}}, {{Roger}} and Radoslaw |
14:00 - 15:00 |
Current increase | SLS COM Team |
15:00 - 18:00 |
Test all 4 girder movers for sector 6 | {{Michael}} |
18:00 - 10:00 |
Beam scrubbing over night | OP Shift Crews and {{Felix}} |
| Friday, 04.04.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
10:00 - 14:00 |
ID Feed Forward tests | {{Simona}} and {{Masamitsu}} |
14:00 - 18:00 |
SOFB commissioning | {{Boris}} |
18:00 - 08:00 |
Beam scrubbing over weekend | OP Shift Crews and {{Felix}} |
2025, KW13
Time |
Description | Contact |
|---|---|---|
| Monday, 24.03.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
08:00 - 10:00 |
OP training injector | SLS OP IB Team |
11:00 - 16:00 |
NAFF based tune measurement tests | {{Jonas}} and {{Jesus}} |
16:00 - 17:00 |
current increase | Com Team |
18:00 - 08:00 |
Beam scrubbing over night | OP Shift Crews and {{Felix}} |
| Tuesday, 25.03.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
07:30 - 15:00 |
Tunnel Access {: colspan=3} | ⁠ {: style="padding:0"} |
15:00 - 22:00 |
Timing and Injection guard tests | {{Romain}} and {{Felix}} |
22:00 - 08:00 |
Beam scrubbing over night | OP Shift Crews and {{Felix}} |
| Wednesday, 26.03.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
08:00 - 10:00 |
OP training: Injection Optimization | {{Volker}} |
10:00 - 14:00 |
LLRF HLA tests | {{Lukas}} and {{Roger}} |
14:00 - 18:00 |
lifetime measurements | Micha and {{Felix}} |
18:00 - 08:00 |
Beam scrubbing over night | OP Shift Crews and {{Felix}} |
| Thursday, 27.03.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
08:00 - 10:00 |
OP training injector | SLS OP IB Team |
10:00 - 14:00 |
ID feed forward development | {{Simona}} and {{Masamitsu}} |
14:00 - 18:00 |
LLRF FW tests | {{Lukas}}, {{Roger}} and Radeck |
18:00 - 08:00 |
Beam scrubbing over night | OP Shift Crews and {{Felix}} |
| Friday, 28.03.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
08:00 - 10:00 |
OP training injector | SLS OP IB Team and {{Felix}} |
10:00 - 14:00 |
ID feed forward development | {{Simona}} and {{Masamitsu}} |
14:00 - 15:00 |
Current increase | Com Team |
15:00 - 18:00 |
Optics | {{Masamitsu}} |
18:00 - 08:00 |
Beam scrubbing over weekend | OP Shift Crews and {{Felix}} |
2025, KW12
Time |
Description | ELOG |
Contact |
|---|---|---|---|
| Monday, 17.03.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
08:00 - 10:00 |
OP training injector | ... | SLS OP IB Team |
10:00 - 14:00 |
Measurements of the beta-functions using the auxiliary quadrupoles | ... | {{Jesus}} and {{Jonas}} |
14:00 - 18:00 |
Single bunch for testing the MBFB kickers (passive, parasitic) | ... | {{Micha}} |
14:00 - 18:00 |
Test ID motion | DEV-LOG 2443 | {{Masamitsu}} |
18:00 - 08:00 |
Beam scrubbing over night | ... | OP Shift Crews and {{Felix}} |
| Tuesday, 18.03.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
08:00 - 12:00 |
Tunnel Access {: colspan=3} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
12:00 - 14:00 |
Startup and timing tests | ... | SLS IB Team and {{Felix}} |
14:00 - 18:00 |
Single bunch for testing the MBFB kickers (active, dedicated) | ... | {{Micha}} |
18:00 - 08:00 |
Downtime, thin septum not pulsing {: colspan=3} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
| Wednesday, 19.03.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
08:00 - 11:00 |
Tunnel Access for thin septum investigation | ⁠ {: style="padding:0"} | |
10:00 - 14:00 |
Improve LLRF Interlocks | ... | {{Lukas}} and {{Roger}} |
14:00 - 18:00 |
Single bunch for testing the MBFB kickers (active, dedicated) | ... | {{Micha}} |
18:00 - 08:00 |
Beam scrubbing over night | ... | OP Shift Crews and {{Felix}} |
| Thursday, 20.03.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
08:00 - 10:00 |
OP training injector | SLS-LOG 60216 | SLS IB Team |
10:00 - 14:00 |
ID FeedForward Tests/Development | ... | {{Masamitsu}} and {{Simona}} |
14:00 - 18:00 |
Improve LLRF Interlocks | ... | {{Lukas}} and {{Roger}} |
18:00 - 08:00 |
Beam scrubbing over night | ... | OP Shift Crews and {{Felix}} |
| Friday, 21.03.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
08:00 - 10:00 |
OP training injector | ... | {{Lukas}} |
10:00 - 14:00 |
Measurements of the beta-functions using the auxiliary quadrupoles | ... | {{Jesus}} and {{Jonas}} |
10:00 - 14:00 |
MBFB Kicker | ... | {{Micha}} |
14:00 - 18:00 |
Commissioning of diagnostic beamlines | ... | {{Cigdem}} |
18:00 - 08:00 |
Beam scrubbing over weekend | ... | OP Shift Crews and {{Felix}} |
2025, KW11
Time |
Description | ELOG |
Contact |
|---|---|---|---|
| Tuesday, 11.03.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
13:00 - 14:00 |
Tunnel patrol | ... | {{Juri}}, {{MartinB}} and somebody from cooling group |
14:00 - 15:00 |
Booster and SR LLRF tests | ... | {{Lukas}} and {{Roger}} |
14:00 - 15:00 |
Check VCS Interlocks | ... | {{Natalia}}, {{Tony}} and {{Felix}} |
15:00 - 17:00 |
Reestablish stored beam and optimize injection | ... | {{Volker}}, {{Jonas}}, {{Masamitsu}} and {{Felix}} |
17:00 - 22:00 |
Beam dump kicker commissioning | ... | {{Martin}} and {{Felix}} and Jonas, Masamitsu |
22:00 - 08:00 |
Beam scrubbing during night (14 h) | ... | OP Shift Crews and {{Felix}} |
| Wednesday, 12.03.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
08:00 - 10:00 |
OP self-training injector | ... | ?? |
08:00 - 10:00 |
Repair magnet power supplies | SLS-LOG 60080 | ?? |
10:00 - 14:00 |
LLRF feedbacks to be tested several times at high currents | {{Lukas}} and {{Roger}} | |
14:00 - 18:00 |
Storage ring phase 5 | ... | {{Masamitsu}} |
18:00 - 08:00 |
Beam scrubbing during night (14 h) | ... | OP Shift Crews and {{Felix}} |
| Thursday, 13.03.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
08:00 - 10:00 |
OP Training | ... | {{Volker}} |
10:00 - 14:00 |
3HC tuning | ... | {{Lukas}} |
14:00 - 18:00 |
Storage ring phase 5 | ... | {{Masamitsu}} |
18:00 - 08:00 |
Beam scrubbing during night (14 h) | ... | OP Shift Crews and {{Felix}} |
| Friday, 14.03.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
08:00 - 10:00 |
OP Training | ... | {{Volker}} |
10:00 - 12:00 |
Linac klystron 2 solenoid tuning for lower charging voltage | ... | {{Juergen}} and {{Carl}} |
12:00 - 14:00 |
Optimization of injection | ... | {{Volker}}, {{Jonas}}, {{Masamitsu}} and {{Felix}} |
14:00 - 16:00 |
Instability at 100 mA | ... | {{Lukas}} and {{Micha}} |
16:00 - 18:00 |
Storage ring phase 5 | ... | {{Masamitsu}} |
18:00 - 08:00 |
Beam scrubbing during weekend (62 h) | ... | OP Shift Crews and {{Felix}} |
2025, KW08
Time |
Description | ELOG |
Contact |
|---|---|---|---|
| Monday, 17.02.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
06:00 - 08:00 |
OP beam scrubbing | SLS-LOG 60022 | Shift Crew |
08:00 - 09:30 |
OP Training + MD Support | - | {{Felix}} and Shift Crew |
11:00 - 13:00 |
Injector | DEV-LOG 2422 | {{Masamitsu}} |
13:00 - 16:00 |
Tunnel Access {: colspan=3} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
12:00 - 18:00 |
Dispersion knob preparation | DEV-LOG 2423 | {{Masamitsu}} |
20:00 - 08:00 |
OP Beam Scrubbing | SLS-LOG 60031 | Shift Crew |
| Tuesday, 18.02.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
08:00 - 20:00 |
OP Training + MD Support | ... | {{Felix}} |
09:00 - 11:00 |
Loss Studies / Reference Measurements | ... | {{Volker}}, {{Felix}} and {{Cigdem}} |
11:00 - 12:00 |
Test BPM Orbit Interlocks | ... | {{Felix}} and {{Goran}} |
12:00 - 18:00 |
Storage Ring Phase 5 | ... | {{Masamitsu}} |
20:00 - 07:00 |
OP Beam Scrubbing | SLS-LOG 60031 | Shift Crew |
| Wednesday, 19.02.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
06:50 - 07:00 |
OP Vorbereitung Tunnelzutritt | ... | Shift Crew |
07:00 - 07:30 |
SU Freimessung Tunnel | ... | {{OliverC}} |
| SHUTDOWN (DUO PLAN) {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
2025, KW07
Time |
Description | ELOG |
Contact |
|---|---|---|---|
| Monday, 10.02.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
06:00 - 08:00 |
OP | ... | Shift Crew |
08:00 - 10:00 |
OP Training | ... | {{Felix}} |
10:00 - 12:00 |
Injector | ... | {{Jonas}} |
12:00 - 18:00 |
Storage Ring Phase 5 | ... | {{Masamitsu}} |
| Tuesday, 11.02.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
06:00 - 06:30 |
Vorbereitung Tunnelzutritt (OP) | ... | Shift Crew |
06:30 - 11:00 |
Tunnel Access {: colspan=3} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
10:00 - 12:00 |
Injector | ... | {{Jonas}} |
12:00 - 18:00 |
Storage Ring Phase 5 | ... | {{Masamitsu}} |
| Wednesday, 12.02.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
06:00 - 08:00 |
OP | ... | Shift Crew |
08:00 - 10:00 |
OP Training | ... | {{Felix}} |
10:00 - 12:00 |
Injector | ... | {{Jonas}} |
12:00 - 18:00 |
Storage Ring Phase 5 | ... | {{Masamitsu}} |
| Thursday, 13.02.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
06:00 - 08:00 |
OP | ... | Shift Crew |
08:00 - 10:00 |
OP Training | ... | {{Volker}} |
10:00 - 14:00 |
Local LOCO Tests | ... | {{Simona}} |
12:00 - 18:00 |
Storage Ring Phase 5 | ... | {{Masamitsu}} |
| Friday, 14.02.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
06:00 - 08:00 |
OP | ... | Shift Crew |
08:00 - 10:00 |
OP Training | ... | {{Volker}} |
10:00 - 12:00 |
Injector | ... | {{Jonas}} |
12:00 - 18:00 |
Storage Ring Phase 5 | ... | {{Masamitsu}} |
2025, KW06
Time |
Description | ELOG |
Contact |
|---|---|---|---|
| Monday, 03.02.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
06:00 - 08:00 |
OP Shift Summary | SLS-Log 59885 | Shift Crew |
08:00 - 10:00 |
Longitudinal Linac Characterization | Dev-Log 2401 | {{Simona}} |
13:00 - 14:00 |
Storage ring chromaticity measurement | Dev-Log 2402 | {{Jonas}} |
| Tuesday, 04.02.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
06:00 - 08:00 |
OP Shift Summary | SLS-Log 59900 | Shift Crew |
07:00 - 11:00 |
Tunnel Access {: colspan=3} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
11:00 - 18:00 |
Recommissioning of the timing system | ... | {{Romain}} |
| Wednesday, 05.02.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
06:00 - 08:00 |
OP | ... | Shift Crew |
08:00 - 09:30 |
Timing Studies | ... | {{Romain}} |
10:00 - 12:00 |
BRTL adjustment + energy spread measurement | ... | {{Jonas}} |
11:30 - 12:30 |
BRTL ICT Setup | ... | {{Cigdem}} |
12:00 - 18:00 |
Storage Ring Orbit/Optics Measurement with Booster off | ... | {{Masamitsu}} |
| Thursday, 06.02.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
06:00 - 08:00 |
OP | ... | Shift Crew |
08:00 - 10:00 |
Operator Training | ... | {{Volker}} |
10:00 - 14:00 |
Booster beam decoupling | ... | {{Jonas}} |
14:00 - 18:00 |
Storage Ring Phase 4 | ... | {{Masamitsu}} |
| Friday, 07.02.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
06:00 - 08:00 |
OP | ... | Shift Crew |
06:00 - 08:00 |
Timing System Reboot | ... | {{Romain}} |
08:00 - 10:00 |
Operator Training | ... | {{Volker}} |
10:00 - 14:00 |
Booster emittance exchange | ... | {{Jonas}} |
14:00 - 18:00 |
Storage Ring Phase 4 | ... | {{Masamitsu}} |
2025, KW05
Time |
Description | ELOG |
Contact |
|---|---|---|---|
| Monday, 27.01.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
06:00 - 08:00 |
OP Startup & Training | ... | {{Max}} |
08:00 - 11:00 |
Linac Optimization | ... | {{Volker}} |
11:00 - 18:00 |
Storage Ring: restore stored beam | Dev-Log 2384 | {{Masamitsu}} |
| Tuesday, 28.01.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
06:00 - 08:00 |
OP Startup & Training | ... | {{Max}} |
08:00 - 10:00 |
Linac/LTB Optimization | ... | {{Volker}} |
10:00 - 14:00 |
Storage Ring - Stored beam: optimize orbit, optics and accumulation | .... | {{Masamitsu}} |
14:00 - 18:00 |
Storage Ring - Stored beam: setup PCT and XO1DD | .... | {{Cigdem}} |
14:00 - 18:00 |
Storage Ring - Stored beam: setup RF phasing | .... | {{Lukas}} |
| Wednesday, 29.01.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
06:00 - 22:00 |
OP Shift Summary | SLS-Log 59840 | {{Max}}, {{Sascha}} and {{Felix}} |
07:30 - 11:00 |
Tunnel Access {: colspan=3} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
10:00 - 14:00 |
Storage Ring - Stored beam: orbit, optics, accumulation, BBA | .... | {{Masamitsu}} |
| Thursday, 30.01.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
06:00 - 08:00 |
Linac | ... | {{Juergen}} |
06:00 - 22:00 |
OP Shift Summary | (SLS-Log 59841)[https://elog-gfa.psi.ch/SLS/59841] | {{Max}}, {{Sascha}} and {{Felix}} |
10:00 - 12:00 |
Booster Optimization | ... | {{Jonas}} |
| Friday, 31.01.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
06:00 - 08:00 |
OP Shift Summary | SLS-Log 59842 | Shift Crew |
08:00 - 10:00 |
Injector Setup OP Training | ... | {{Volker}} |
08:00 - 10:00 |
DBPM3 update | ... | {{Boris}} |
10:00 - 16:00 |
Storage Ring Commissioning | ... | {{Masamitsu}} |
10:00 - 16:00 |
Super-3HC Tuning | ... | {{Lukas}} |
2025, KW04
Time |
Description | ELOG |
Contact |
|---|---|---|---|
| Monday, 20.01.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
06:00 - 08:00 |
Injector Startup + OP Training | {{Felix}} | |
08:00 - 09:00 |
RF Master Oscillator sweep tests (RF, BPM) without Beam | Dev-Log 2372 RF-LOG 1910 |
{{Boris}} and {{Lukas}} |
10:00 - 12:00 |
Investigation of Booster-RF Ramp-Up Issues | RF-LOG 1911 | {{Lukas}} |
12:00 - 19:00 |
Multiple turns storage ring | ... | {{Masamitsu}} |
| Tuesday, 21.01.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
06:00 - 08:00 |
OP Startup & Training | {{Sascha}} | |
08:00 - 10:00 |
Tunnel Access {: colspan=3} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
10:00 - 12:00 |
Injector optimization | Dev-Log 2376 | {{Jonas}} |
13:00 - 21:00 |
Storage ring | Dev-Log 2378 | {{Masamitsu}} |
| Wednesday, 22.01.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
06:00 - 08:15 |
OP Startup & Training | SLS-Log 59748 | {{Stefan}} |
08:15 - 10:00 |
Linac Optimization | Dev-Log 2379 | {{Volker}} |
10:00 - 22:00 |
Storage ring commissioning phase 3: multi-turn | Dev-Log 2380 | {{Masamitsu}} |
| Thursday, 23.01.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
06:00 - 08:30 |
OP Startup & Training | SLS-Log 59764 | {{Stefan}} and {{Felix}} |
08:30 - 12:30 |
Storage ring commissioning phase 4: accumulation | SLS-Log 2381 | {{Masamitsu}} |
| Friday, 24.01.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
06:00 - 08:00 |
OP Startup & Training | SLS-Log 59776 | {{Stefan}} |
08:00 - 10:00 |
Storage ring RF phase investigation | RF-LOG 1916 | {{Lukas}} and {{Roger}} |
10:00 - 22:00 |
Restoring Stored Beam | Dev-Log 2382 | {{Masamitsu}} |
2025, KW03
Time |
Description | ELOG |
Contact |
|---|---|---|---|
| Tuesday, 14.01.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
09:00 - 15:00 |
Restart Injector Complex | Dev-LOG 2358 | {{Jonas}} |
15:00 - 17:00 |
BRTL Measurements | Dev-LOG 2364 | {{Jonas}} |
17:00 - 19:00 |
1st injection to storage ring | Dev-LOG 2360 | {{Masamitsu}} |
| Wednesday, 15.01.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
08:00 - 09:00 |
Test 3HC Interlock via MIS | SLS-LOG 59717 | {{Lukas}} |
09:00 - 10:00 |
Optimize BRTL | Dev-LOG 2364 | {{Jonas}} |
10:00 - 18:00 |
Injection and 1st turn storage ring | Dev-LOG 2365 | {{Masamitsu}} |
| Thursday, 16.01.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
07:00 - 13:00 |
Tunnel Access {: colspan=3} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
13:00 - 16:00 |
Booster Optimization | Dev-LOG 2367 | {{Jonas}} |
16:00 - 21:00 |
First turn storage ring | Dev-LOG 2367 | {{Masamitsu}} |
| Friday, 17.01.2025 {: colspan=4} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
06:00 - 08:00 |
Injector Startup + OP Training | {{Felix}} | |
09:00 - 12:00 |
Injector optimization | Dev-Log 2368 | {{Jonas}} |
12:00 - 13:00 |
Tunnel Access {: colspan=3} | ⁠ {: style="padding:0"} | ⁠ {: style="padding:0"} |
13:00 - 21:00 |
Multiple turns storage ring | Dev-Log 2369 | {{Masamitsu}} |