2025, KW41

{{ScheduleTableHead()}} | Mon., 06.10.2025 {{}} | | 00:00 - 24:00 | {{TopUp400}} | Beamline development | OP shift crew | | Tue., 07.10.2025 {{}} | | 00:00 - 07:00 | {{TopUp400}} | Beamline development | OP shift crew | | 07:00 - 09:00 | {{TopUp400}} | Operator Training | {{Felix}} | | 09:00 - 24:00 | {{TopUp400}} | MD: optics/ADTS/chrom measurements | {{Jesus}} | | Wed., 08.10.2025 {{}} | | 00:00 - 07:00 | {{TopUp400}} | MD Reserve | ?? | | 07:00 - 09:00 | {{TopUp400}} | Operator Training | {{Felix}} | | 09:00 - 24:00 | {{Unstable}} | MD: Timing update and test of timing scope | {{Romain}} and {{Felix}} | | Thu., 09.10.2025 {{}} | | 00:00 - 07:00 | {{TopUp400}} | MD Reserve | ?? | | 07:00 - 09:00 | {{TopUp400}} | Operator Training | {{Felix}} | | 09:00 - 13:00 | {{TopUp400}} | MD: Test of mobile excitation/measurement cart | {{Felix}} and {{Jonas}} | | 13:00 - 24:00 | {{TopUp400}} | MD: Streak camera and fast diode measurements | {{Cigdem}} and {{Daniel}} | | 09:00 - 24:00 | {{TopUp400}} | Parallel MD: XBPM Tests | {{Volker}} | | Fri., 10.10.2025 {{}} | | 00:00 - 07:00 | {{TopUp400}} | MD Reserve | ?? | | 07:00 - 09:00 | {{TopUp400}} | Operator Training | {{Felix}} | | 09:00 - 10:00 | {{TopUp400}} | Prepare user operation | {{Felix}} | | 10:00 - 24:00 | {{TopUp400}} | Beamline development | OP shift crew | | Sat., 11.10.2025 {{}} | | 00:00 - 24:00 | {{TopUp400}} | Beamline development | OP shift crew | | Sun., 12.10.2025 {{_}} | | 00:00 - 24:00 | {{TopUp400}} | Beamline development | OP shift crew |

2025, KW40

{{ScheduleTableHead()}} | Mon., 29.09.2025 {{}} | | 00:00 - 24:00 | {{TopUp400}} | Beamline development | OP shift crew | | Tue., 30.09.2025 {{}} | | 00:00 - 07:00 | {{TopUp400}} | Beamline development | OP shift crew | | 07:00 - 09:00 | {{TunnelCo}} | Switch X02 / U15 pumps to warm operation | {{RomainG}} and {{Oliver}} | | 09:00 - 12:00 | {{Unstable}} | MD: measure feed forward for X11 / UE36 | {{Simona}} and {{Masamitsu}} | | 12:00 - 16:00 | {{Unstable}} | MD: test new booster RF waveform | {{Jonas}} and {{Lukas}} | | 16:00 - 24:00 | {{Unstable}} | MD: optics/ADTS/chrom measurements | {{Jesus}} | | Wed., 01.10.2025 {{}} | | 00:00 - 07:00 | {{TopUp400}} | MD Reserve | | | 07:00 - 24:00 | {{TopUp400}} | Beamline development | OP shift crew | | Thu., 02.10.2025 {{}} | | 00:00 - 24:00 | {{TopUp400}} | Beamline development | OP shift crew | | Fri., 03.10.2025 {{}} | | 00:00 - 24:00 | {{TopUp400}} | Beamline development | OP shift crew | | Sat., 04.10.2025 {{}} | | 00:00 - 24:00 | {{TopUp400}} | Beamline development | OP shift crew | | Sun., 05.10.2025 {{_}} | | 00:00 - 24:00 | {{TopUp400}} | Beamline development | OP shift crew |

2025, KW39

{{ScheduleTableHead()}} | Mon., 22.09.2025 {{}} | | 00:00 - 15:00 | {{TunnelFr}} | Replacement of 21 mm vacuum chamber in X11 | {{RomainG}} | | 15:00 - 15:30 | {{TunnelCo}} | SU Patrol | {{Oliver}} and {{Juri}} | | 15:30 - 17:00 | {{Unstable}} | Machine Startup | {{Felix}} and OP shift crew | | 17:00 - 20:00 | {{Unstable}} | Re-establish orbit, injection and optics | {{Jonas}} and {{Masamitsu}} and {{Felix}} | | 20:00 - 24:00 | {{TopUp400}} | Beam scrubbing | OP Shift Crew | | Tue., 23.09.2025 {{}} | | 00:00 - 07:00 | {{TopUp400}} | Beam scrubbing | OP Shift Crew | | 07:00 - 18:00 | {{Unstable}} | Re-establish orbit, injection and optics | {{Jonas}} and {{Masamitsu}} and {{Felix}} | | 18:00 - 24:00 | {{Unstable}} | ADTS/optics measurements | {{Jesus}} | | Wed., 24.09.2025 {{}} | | 00:00 - 13:00 | {{TopUp400}} | Beam scrubbing | OP Shift Crew | | 13:00 - 17:00 | {{Unstable}} | First Light X11 / SIM | {{Felix}} and OP Shift Crew | | 17:00 - 24:00 | {{TopUp400}} | Beamline development | OP shift crew | | Thu., 25.09.2025 {{}} | | 00:00 - 07:00 | {{TopUp400}} | Beamline development | OP shift crew | | 07:00 - 17:00 | {{Unstable}} | First Light X02 / I-TOMCAT | {{Jonas}} and OP Shift Crew | | 17:00 - 24:00 | {{TopUp400}} | Beamline development | OP shift crew | | Fri., 26.09.2025 {{}} | | 00:00 - 07:00 | {{TopUp400}} | Beamline development | OP shift crew | | 07:00 - 17:00 | {{Unstable}} | First Light X02 / I-TOMCAT | {{Jonas}} and OP Shift Crew | | 17:00 - 24:00 | {{TopUp400}} | Beamline development | OP shift crew | | Sat., 27.09.2025 {{}} | | 00:00 - 24:00 | {{TopUp400}} | Beamline development | OP shift crew | | Sun., 28.09.2025 {{_}} | | 00:00 - 24:00 | {{TopUp400}} | Beamline development | OP shift crew |

2025, KW38

{{ScheduleTableHead()}} | Mon., 15.09.2025 {{}} | | 00:00 - 07:00 | {{TopUp300}} | Beamline development | OP shift crew | | 07:00 - 09:00 | {{Unstable}} | Operator training | {{Felix}} | | 09:00 - 10:00 | {{Unstable}} | ADTS/optics measurements | {{Jesus}} and {{Jonas}} and {{Jonas}} | | 10:00 - 12:00 | {{Unstable}} | Check X11 Shutter/Stopper and OH Bremsstrahlung | {{OliverC}}, {{ArminK}} and {{Felix}} | | 10:30 - 14:00 | {{Unstable}} | Timing: switch base delays to ticks, common PVs and local mode fix of bucket shut | {{Romain}} and {{Felix}} | | 14:00 - 19:00 | {{Unstable}} | Measure feed forward table for U15/X02 | {{Simona}} and {{Masamitsu}} | | 19:00 - 24:00 | {{Unstable}} | ADTS/optics measurements | {{Jesus}} | | Tue., 16.09.2025 {{}} | | 00:00 - 07:00 | {{Unstable}} | Machine development shift | ??? | | 07:00 - 24:00 | {{TopUp300}} | Beamline development | OP shift crew | | Wed., 17.09.2025 {{}} | | 00:00 - 13:00 | {{TopUp300}} | Beamline development | OP shift crew | | 13:00 - 24:00 | {{TunnelFr}} | Replacement of 21 mm vacuum chamber in X11 | {{RomainG}} | | Thu., 18.09.2025 {{}} | | 00:00 - 24:00 | {{TunnelFr}} | Replacement of 21 mm vacuum chamber in X11 | {{RomainG}} | | Fri., 19.09.2025 {{}} | | 00:00 - 24:00 | {{TunnelFr}} | Replacement of 21 mm vacuum chamber in X11 | {{RomainG}} | | Sat., 20.09.2025 {{}} | | 00:00 - 24:00 | {{TunnelFr}} | Replacement of 21 mm vacuum chamber in X11 | {{RomainG}} | | Sun., 21.09.2025 {{_}} | | 00:00 - 24:00 | {{TunnelFr}} | Replacement of 21 mm vacuum chamber in X11 | {{RomainG}} |

2025, KW37

{{ScheduleTableHead()}} | Mon., 08.09.2025 {{}} | | 00:00 - 24:00 | {{TopUp400}} | Beamline development | OP shift crew | | Tue., 09.09.2025 {{}} | | 00:00 - 07:00 | {{TopUp400}} | Beamline development | OP shift crew | | 07:00 - 09:00 | {{Unstable}} | Operator training | {{Felix}} and OP shift crew | | 09:00 - 12:00 | {{Unstable}} | Superbend checks, ARC04 alignment, BPM Cooling upgrade | {{Max}} and {{Romain}} | | 12:00 - 14:00 | {{Unstable}} | Check BPM stability with new cooling | {{Masamitsu}}| | 14:00 - 19:00 | {{Unstable}} | Update the base timing delays in the injection chain from us to ticks | {{Romain}} | | 14:00 - 19:00 | {{Unstable}} | (parasitic) Optimize Kollimator settings | {{Felix}} and {{Masamitsu}} and {{Rebecca}} | | 19:00 - 24:00 | {{Unstable}} | Machine development shift | ??? | | Wed., 10.09.2025 {{}} | | 00:00 - 07:00 | {{Unstable}} | Machine development shift | ??? | | 07:00 - 14:00 | {{Unstable}} | X11/UE36 Investigations | {{Masamitsu}}, {{Jonas}} and {{Felix}} | | 18:00 - 24:00 | {{TopUp300}} | Beamline development | OP shift crew | | Thu., 11.09.2025 {{}} | | 00:00 - 12:00 | {{TopUp400}} | Beamline development | OP shift crew | | 12:00 - 13:00 | {{Unstable}} | Machine development shift | {{Jonas}} | | 13:00 - 24:00 | {{TopUp300}} | Beamline development | OP shift crew | | Fri., 12.09.2025 {{}} | | 00:00 - 07:00 | {{TopUp300}} | Beamline development | OP shift crew | | 07:00 - 09:00 | {{TunnelCo}} | Repair gate valve SuperXAS, SU mapping UE36 | {{Rebecca}} | | 09:00 - 19:00 | {{TopUp400}} | Beamline development | OP shift crew | | 19:00 - 24:00 | {{TopUp300}} | Beamline development | OP shift crew | | Sat., 13.09.2025 {{}} | | 00:00 - 24:00 | {{TopUp300}} | Beamline development | OP shift crew | | Sun., 14.09.2025 {{_}} | | 00:00 - 24:00 | {{TopUp300}} | Beamline development | OP shift crew |

2025, KW36

{{ScheduleTableHead()}} | Mon., 01.09.2025 {{}} | | 07:00 - 12:00 | {{No_Light}} | Beamline PSYS tests | OP Shift Crew | | 12:00 - 15:00 | {{Unstable}} | Machine startup | OP Shift Crew and {{Felix}} | | 15:00 - 17:00 | {{Unstable}} | Reestablish orbit | {{Masamitsu}} | | 17:00 - 21:00 | {{Unstable}} | Beam dump kicker tests | {{Martin}} and {{Felix}} | | 21:00 - 24:00 | {{Unstable}} | Update the base timing delays in the injection chain from us to ticks | {{Romain}} | | Tue., 02.09.2025 {{}} | | 00:00 - 07:00 | {{TopUp400}} | BPM Stability Measurements | {{Boris}} | | 08:00 - 12:00 | {{TopUp400}} | Bunch length measurements | {{Cigdem}} and {{Daniel}} | | 12:00 - 18:00 | Decaying | Booster RF-ramp tests | {{Lukas}} and {{Jonas}} | | 18:00 - 24:00 | {{Unstable}} | ADTS Measurements | {{Jesus}} | | Wed., 03.09.2025 {{}} | | 00:00 - 07:00 | {{Unstable}} | ADTS Measurements | {{Jesus}} | | 07:00 - 09:00 | {{Unstable}} | Operator training | {{Felix}} | | 09:00 - 16:00 | {{No_Light}} | Controlled tunnel access for alignment of 4 AN magnets in ARC4 and ARC5 (Mit SU abgesprochen: kein Rundgang und kein Warten notwendig) | {{Karsten}} and {{Tino}} | | 16:00 - 18:00 | {{Unstable}} | Reestablish orbit | {{Masamitsu}} | | 18:00 - 24:00 | {{Unstable}} | Measure/optimize optics | {{Masamitsu}} | | Thu., 04.09.2025 {{}} | | 00:00 - 07:00 | {{TopUp400}} | BPM Stability Measurements | {{Boris}} | | 07:00 - 12:00 | {{Unstable}} | BPM FW/SW Upgrade | {{JonasP}} and {{Boris}} | | 12:00 - 16:00 | {{Unstable}} | Event Master / FPFB development | {{Romain}} and {{Pedro}} | | 16:00 - 24:00 | {{Unstable}} | FOFB FW/SW Upgrade | {{Goran}} | | 16:00 - 24:00 | {{Unstable}} | (Parasitic) Event Master / FPFB development | {{Romain}} and {{Pedro}} | | Fri., 05.09.2025 {{}} | | 00:00 - 07:00 | {{TopUp400}} | BPM stability measurements | {{Boris}} | | 07:00 - 24:00 | {{TopUp400}} | Beamline development | OP shift crew | | Sat., 06.09.2025 {{}} | | 00:00 - 24:00 | {{TopUp400}} | Beamline development | OP shift crew | | Sun., 07.09.2025 {{_}} | | 00:00 - 24:00 | {{TopUp400}} | Beamline development | OP shift crew |

2025, KW32

Time
Machine State Description
Contact
Monday, 04.08.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
00:00 - 10:00 400 mA, top up Beamline development OP Shift Crew
10:00 - 24:00 unstable BPM development {{Boris}}
Tuesday, 05.08.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
00:00 - 07:20 unstable BPM development {{Boris}}
07:20 - 07:30 Beam Dump Vorebereitung Tunnelzugang Überwacht OP Shift Crew
07:30 - 08:00 Tunnel access SU Patrol {{Oliver}} and {{Rebecca}}
08:00 - 10:00 Tunnel access Beam Dump Kicker Repair {{Martin}}
10:00 - 14:00 unstable FPFB/timing development shift {{Pedro}} and {{Romain}}
14:00 - 18:00 unstable Timing development shift {{Romain}} and {{Felix}}
18:00 - 24:00 400 mA, top up Machine development reserve OP Shift Crew
Wednesday, 06.08.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
00:00 - 07:00 400 mA, top up Machine development reserve OP Shift Crew
07:00 - 09:00 unstable Operator Training {{Felix}}
09:00 - 17:00 unstable MBFB development shift {{Pedro}} and {{Boris}}
17:00 - 24:00 unstable BRTL dispersion correction + quadrupole scans (+ optics matching) {{Jonas}}
Thursday, 07.08.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
00:00 - 07:30 400 mA, top up Machine development reserve OP Shift Crew
07:30 - 08:00 No beam Beam Dump for tunnel access OP Shift crew
08:00 - 10:00 No beam Tunnel Access for realignment of 2 AN in sector 6 {{Tino}}
10:00 - 12:00 unstable Restore machine orbit/optics {{Masamitsu}}
12:00 - 20:00 unstable FOFB development {{Boris}}
20:00 - 24:00 unstable BO extraction / SR injection optimization {{Jonas}}, {{Felix}} and {{Masamitsu}}
Friday, 08.08.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
00:00 - 07:00 400 mA, top up Machine development reserve OP Shift Crew
07:00 - 10:00 unstable Operator training {{Felix}}
10:00 - 18:00 unstable FOFB development {{Boris}}
15:00 - 24:00 Shutdown {: colspan=3} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
Saturday, 09.08.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
00:00 - 24:00 Shutdown {: colspan=3} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
Sunday, 10.08.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
00:00 - 24:00 Shutdown {: colspan=3} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}

2025, KW31

Time
Machine State Description
Contact
Monday, 28.07.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
00:00 - 07:00 Top-up, 400 mA Beamline development OP shift crew
07:00 - 12:00 ?? FPFB/timing development {{Pedro}} and {{Romain}}
10:00 - 12:00 ?? Parasitic BPM/FB pikett training {{Boris}} and Co.
12:00 - 18:00 ?? BPM/FOFB development {{Boris}} and {{Goran}}
18:00 - 24:00 ?? Optics optimization {{Masamitsu}}
Tuesday, 29.07.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
00:00 - 08:00 ?? (Remote) Test beta function measurement and cycle magnets after finishing {{Jonas}}
08:00 - 10:00 ?? BPM/FOFB development {{Boris}} and {{Goran}}
10:00 - 18:00 ?? Error detection using machine learning {{Simona}}
18:00 - 24:00 ?? Round beam tests {{Jonas}}
Wednesday, 30.07.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
00:00 - 08:00 400 mA, top up Machine development reserve OP Shift Crew
08:00 - 09:00 unstable Beam assisted girder alignment arcs 5 to 8 {{Michael}}
09:00 - 09:30 Tunnel access SU Patrol {{Oliver}} and {{Rebecca}}
09:30 - 13:00 Tunnel access Repair ethercat for girder mover encoders of ARC8 Kurt
09:30 - 13:00 Tunnel access Plinth realignment arcs 5 to 8 {{Karsten}}
09:30 - 13:00 Tunnel access Check girder movers for arcs 5 to 8 {{Max}} and {{FelixM}}
13:00 - 18:00 unstable Beam assisted girder alignment arcs 5 to 8 {{Michael}}
18:00 - 24:00 unstable Optics correction after alignment {{Masamitsu}}
Thursday, 31.07.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
00:00 - 08:00 unstable BPM/FOFB development {{Boris}}
08:00 - 14:00 ?? Camshaft tests {{Jonas}} and {{Micha}}
14:00 - 24:00 unstable BPM/FOFB development {{Boris}} and {{Goran}}
Friday, 01.08.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
00:00 - 10:00 unstable BPM/FOFB development {{Boris}}
10:00 - 24:00 ?? Optics measurements (LOCO and local dispersion) {{Masamitsu}} and {{Simona}}
Saturday, 02.08.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
00:00 - 20:00 400 mA, top up Beamline development OP Shift Crew
20:00 - 24:00 unstable BPM/FOFB development {{Boris}}
Sunday, 03.08.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
00:00 - 08:00 unstable BPM/FOFB development {{Boris}}
00:00 - 24:00 400 mA, top up Beamline development OP Shift Crew

2025, KW30

Time
Machine State Description
Contact
Monday, 21.07.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
00:00 - 07:20 Top-up, 400 mA Beamline development OP shift crew
07:20 - 07:30 no beam Beam Dump, Vorbereitung Tunnelzugang Überwacht OP Shift Crew
07:30 - 08:00 no beam Freimessung Tunnel durch SU {{Rebecca}} and {{OliverC}}
08:00 - 14:00 no beam Realignment of plinths in arcs 9 to 12 {{Karsten}} and {{Tino}}
08:00 - 17:00 no beam Escalation tests X12SA (cSAXS) SPS group
17:00 - 24:00 Top-up, 400 mA Beamline development OP shift crew
Tuesday, 22.07.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
00:00 - 07:00 Top-up, 400 mA Beamline development OP shift crew
07:00 - 10:00 unstable, all gaps open Operator Training {{Felix}}
10:00 - 14:00 unstable, all gaps open Beam assisted vertical girder alignment in arcs 9 to 12 {{Michael}} and {{FelixM}}
14:00 - 15:00 unstable, all gaps open Test of Event Master Interface to FPFB and of the FPFB {{Romain}} and {{Pedro}}
15:00 - 19:00 unstable, all gaps open Upgrade and test of FOFB firmware and software {{Boris}}
19:00 - 24:00 Top-up, 400 mA BPM tests {{Boris}}
Wednesday, 23.07.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
00:00 - 07:00 Top-up, 400 mA BPM tests {{Boris}}
07:00 - 07:30 Top-up, 60 mA Beam Dump und füllen auf 60 mA OP shift crew
07:30 - 17:00 Top-up, 60 mA First light cSAXS SLS 2.0 Commissioning Team
17:00 - 24:00 Top-up, 400 mA Beamline development OP shift crew
Thursday, 24.07.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
08:00 - 17:00 Top-up, 400 mA First light cSAXS SLS 2.0 Commissioning Team
17:00 - 24:00 Top-up, 400 mA Beamline development OP shift crew
Friday, 25.07.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
00:00 - 24:00 Top-up, 400 mA Beamline development OP shift crew
Saturday, 26.07.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
00:00 - 24:00 Top-up, 400 mA Beamline development OP shift crew
Sunday, 27.07.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
00:00 - 24:00 Top-up, 400 mA Beamline development OP shift crew

2025, KW29

Time
Machine State Description
Contact
Monday, 14.07.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
00:00 - 24:00 Top-up, 400 mA Pilot user operation OP shift crew
Tuesday, 15.07.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
00:00 - 07:00 Top-up, 400 mA Pilot user operation OP shift crew
07:20 - 07:30 no beam Beam Dump, Vorbereitung Tunnelzugang Überwacht OP Shift Crew
07:30 - 08:00 no beam Freimessung Tunnel durch SU {{Rebecca}} and {{OliverC}}
08:00 - 14:00 no beam Realignment of plinths in arcs 1 to 4 {{Karsten}} and {{Tino}}
08:00 - 14:00 no beam Girder mover tests for arcs 1 to 4 {{FelixM}} and {{Max}}
14:00 - 20:00 unstable, all gaps open Beam assisted vertical girder alignment in arcs 1 to 4 {{Michael}} and {{FelixM}}
20:00 - 24:00 unstable, all gaps open FOFB development {{Boris}}
Wednesday, 16.07.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
00:00 - 07:00 unstable, all gaps open FOFB development {{Boris}}
07:00 - 15:00 Top-up, 400 mA Beamline development OP shift crew
15:00 - 24:00 Top-up, 400 mA Beamline development OP shift crew
Thursday, 17.07.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
00:00 - 24:00 Top-up, 400 mA Beamline development OP shift crew
Friday, 18.07.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
00:00 - 24:00 Top-up, 400 mA Beamline development OP shift crew
Saturday, 19.07.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
00:00 - 24:00 Top-up, 400 mA Beamline development OP shift crew
Sunday, 20.07.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
00:00 - 24:00 Top-up, 400 mA Beamline development OP shift crew

2025, KW28

Time
Machine State Description
Contact
Monday, 07.07.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
00:00 - 24:00 Top-up, 400 mA Pilot user operation OP shift crew
Tuesday, 08.07.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
00:00 - 09:00 Top-up, 400 mA Pilot user operation OP shift crew
09:00 - 17:00 unstable, all gaps open FOFB development w. crossbar test {{Boris}} and Jonas
17:00 - 00:00 unstable, all gaps open FOFB development {{Boris}}
09:00 - 00:00 unstable, all gaps open FPFB development in parallel {{Romain}} and {{Pedro}}
Wednesday, 09.07.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
00:00 - 07:00 unstable, Top-up, 400 mA machine development reserve w. crossbar ON ???
07:20 - 07:30 no beam Beam Dump, Vorbereitung Tunnelzugang Überwacht OP Shift Crew
07:30 - 08:00 no beam Freimessung Tunnel durch SU {{Rebecca}} and {{OliverC}}
08:00 - 10:00 no beam Escalation tests X07DB (ISS) {{Tony}} and {{Joerg}}
10:00 - 15:00 Top-up, 60 - 400 mA First light X07DB (ISS) {{Joerg}}
15:00 - 24:00 Top-up, 400 mA Pilot user operation OP shift crew
Thursday, 10.07.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
00:00 - 24:00 Top-up, 400 mA Pilot user operation OP shift crew
Friday, 11.07.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
00:00 - 24:00 Top-up, 400 mA Pilot user operation OP shift crew
Saturday, 12.07.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
00:00 - 24:00 Top-up, 400 mA Pilot user operation OP shift crew
Sunday, 13.07.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
00:00 - 24:00 Top-up, 400 mA Pilot user operation OP shift crew

2025, KW27

Time
Machine State Description
Contact
Monday, 30.06.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
00:00 - 24:00 Top-up, 400 mA Beamline development OP shift crew
Tuesday, 01.07.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
00:00 - 07:00 Top-up, 400 mA Beamline development OP shift crew
07:00 - 10:00 unstable, all gaps open operator training {{Felix}}
08:00 - 10:00 unstable, all gaps open RF HLA update {{Roger}}
10:00 - 13:00 unstable, all gaps open BPM noise tests {{Boris}}
13:00 - 15:00 unstable, all gaps open BPM/Feedbacks piquet training {{Boris}} and machine experts
15:00 - 23:00 unstable, all gaps open FPFB development {{Pedro}} and {{Romain}}
15:00 - 23:00 unstable, all gaps open Amplitude dependant tune shift measurement {{Jesus}} and {{Jonas}}
23:00 - 24:00 unstable, all gaps open FOFB development {{Boris}}
Wednesday, 02.07.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
00:00 - 03:00 unstable, all gaps open machine development reserve ???
03:00 - 24:00 Top-up, 400 mA Pilot user operation OP shift crew
Thursday, 03.07.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
00:00 - 24:00 Top-up, 400 mA Pilot user operation OP shift crew
Friday, 04.07.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
00:00 - 24:00 Top-up, 400 mA Pilot user operation OP shift crew
Saturday, 05.07.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
00:00 - 24:00 Top-up, 400 mA Pilot user operation OP shift crew
Sunday, 06.07.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
00:00 - 24:00 Top-up, 400 mA Pilot user operation OP shift crew

2025, KW26

Time
Machine State Description
Contact
Monday, 23.06.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
00:00 - 24:00 Top-up, 400 mA Beamline development OP shift crew
Tuesday, 24.06.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
00:00 - 07:00 Top-up, 400 mA Beamline development OP shift crew
07:00 - 09:00 unstable, all gaps open operator training {{Felix}}
09:00 - 17:00 unstable, all gaps open FOFB development ??FOFB {{Boris}} and Jonas
17:00 - 18:00 unstable, all gaps open pointing in X01DD {{Cigdem}} and {{Masamitsu}}
18:00 - 24:00 unstable, all gaps open FOFB development {{Boris}}
Wednesday, 25.06.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
00:00 - 07:30 unstable, all gaps open FOFB development {{Boris}}
07:30 - 08:00 unstable Beam Dump and refill to 60 mA OP shift crew
08:00 - 17:00 Top-up, 60 mA First light (PX-II and S-TOMCAT) SLS 2.0 Commissioning Team
17:00 - 24:00 unstable, all gaps open FOFB development {{Boris}}
Thursday, 26.06.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
00:00 - 08:00 unstable, all gaps open FOFB development {{Boris}}
08:00 - 17:00 Top-up, 400 mA First light (PX-II and S-TOMCAT) SLS 2.0 Commissioning Team
17:00 - 24:00 unstable, all gaps open FOFB development {{Boris}}
Friday, 27.06.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
00:00 - 07:00 unstable, all gaps open FOFB development {{Boris}}
07:00 - 17:00 Top-up, 400 mA First light (PX-II and S-TOMCAT) SLS 2.0 Commissioning Team
17:00 - 24:00 Top-up, 400 mA Beamline development OP shift crew
Saturday, 28.06.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
00:00 - 24:00 Top-up, 400 mA Beamline development OP shift crew
Sunday, 29.06.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
00:00 - 24:00 Top-up, 400 mA Beamline development OP shift crew

2025, KW25

Time
Machine State Description
Contact
Monday, 16.06.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
00:00 - 24:00 top up, 400 mA Beamline Development OP Shift Crew
Tuesday, 17.06.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
00:00 - 08:00 top up, 400 mA Beamline Development OP Shift Crew
08:00 - 10:00 no beam LLRF updates (Post Mortem Trigger) {{Lukas}}, {{Roger}}, {{Zheqiao}} and {{Radoslaw}}
10:00 - 13:00 unstable Timing Development {{Romain}} and {{Felix}}
13:00 - 24:00 unstable FPFB Development {{Pedro}} and {{Romain}}
14:00 - 24:00 unstable FOFB Development (remote) {{Boris}}
Wednesday, 18.06.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
00:00 - 07:20 unstable FOFB Development {{Boris}}
07:20 - 07:30 no beam Beam Dump, Vorbereitung Tunnelzugang Überwacht OP Shift Crew
07:30 - 08:00 no beam Freimessung Tunnel durch SU {{OliverC}}
08:00 - 14:00 no beam Linac Optimization {{Simona}}, {{Jonas}} and {{Fabio}}
08:00 - 14:00 no beam Vorbereitungsarbeiten Beamline Inbetriebnahmen {{Juri}}
14:00 - 17:00 unstable Maschine hochfaren OP Shift Crew
17:00 - 24:00 top up, 400 mA Beamline Development OP Shift Crew
Thursday, 19.06.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
00:00 - 15:00 top up, 400 mA Beamline Development OP Shift Crew
15:00 - 22:00 unstable FOFB Development (remote) {{Boris}}
22:00 - 24:00 top up, 400 mA Beamline Development OP Shift Crew
Friday, 20.06.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
00:00 - 24:00 top up, 400 mA Beamline Development OP Shift Crew
Saturday, 21.06.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
00:00 - 24:00 top up, 400 mA Beamline Development OP Shift Crew
Sunday, 22.06.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
00:00 - 24:00 top up, 400 mA Beamline Development OP Shift Crew

2025, KW24

Time
Machine State Description
Contact
Monday, 09.06.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
00:00 - 24:00 top up, 400 mA Beam scrubbing OP Shift Crew
Tuesday, 10.06.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
00:00 - 06:50 top up, 400 mA Beam scrubbing OP Shift Crew
06:50 - 07:00 no beam Beam Dump, Vorbereitung Tunnelzugang Überwacht OP Shift Crew
07:00 - 07:30 no beam Freimessung Tunnel durch SU {{OliverC}}
07:30 - 14:00 no beam Vorbereitungsarbeiten Beamline Inbetriebnahmen {{Juri}}
14:00 - 15:00 unstable Maschine hochfaren OP Shift Crew
15:00 - 22:00 unstable FOFB Development {{Boris}}
22:00 - 24:00 top up, 400 mA Beam scrubbing OP Shift Crew
Wednesday, 11.06.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
00:00 - 08:00 top up, 400 mA Beam scrubbing OP Shift Crew
08:00 - 14:00 unstable FOFB Development {{Boris}}
14:00 - 22:00 unstable FPFB Development {{Romain}} and {{Pedro}}
22:00 - 24:00 top up, 400 mA Beam scrubbing OP Shift Crew
Thursday, 12.06.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
00:00 - 08:00 top up, 400 mA Beam scrubbing OP Shift Crew
08:00 - 14:00 unstable FOFB Development {{Boris}}
14:00 - 15:00 no beam Tunnel Access for Kicker 2 {{RomainG}} and {{Martin}}
15:00 - 24:00 unstable Beamline Development OP Shift Crew
Friday, 13.06.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
00:00 - 24:00 top up, 400 mA Beamline Development OP Shift Crew
Saturday, 14.06.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
00:00 - 24:00 top up, 400 mA Beamline Development OP Shift Crew
Sunday, 15.06.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
00:00 - 24:00 top up, 400 mA Beamline Development OP Shift Crew

2025, KW23

Time
Machine State Description
Contact
Monday, 02.06.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
00:00 - 06:50 top up, 400 mA Beam scrubbing OP Shift Crew
06:50 - 07:00 no beam Beam Dump, Vorbereitung Tunnelzugang Überwacht OP Shift Crew
07:00 - 07:30 no beam Freimessung Tunnel durch SU {{OliverC}}
07:30 - 17:00 no beam Vorbereitungsarbeiten Beamline Inbetriebnahmen {{Juri}}
17:00 - 20:00 unstable Maschine hochfaren OP Shift Crew
20:00 - 24:00 top up, 400 mA Beam scrubbing OP Shift Crew
Tuesday, 03.06.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
00:00 - 06:50 top up, 400 mA Beam scrubbing OP Shift Crew
06:50 - 07:00 no beam Beam Dump, Vorbereitung Tunnelzugang Überwacht OP Shift Crew
07:00 - 07:30 no beam Freimessung Tunnel durch SU {{OliverC}}
07:30 - 17:00 no beam Vorbereitungsarbeiten Beamline Inbetriebnahmen {{Juri}}
17:00 - 20:00 unstable Maschine hochfaren OP Shift Crew
20:00 - 24:00 top up, 400 mA Beam scrubbing OP Shift Crew
Wednesday, 04.06.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
00:00 - 06:50 top up, 400 mA Beam scrubbing OP Shift Crew
06:50 - 07:00 no beam Beam Dump, Vorbereitung Tunnelzugang Überwacht OP Shift Crew
07:00 - 07:30 no beam Freimessung Tunnel durch SU {{OliverC}}
07:30 - 17:00 no beam Vorbereitungsarbeiten Beamline Inbetriebnahmen {{Juri}}
17:00 - 20:00 unstable Maschine hochfaren OP Shift Crew
20:00 - 24:00 top up, 400 mA Beam scrubbing OP Shift Crew
Thursday, 05.06.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
00:00 - 06:50 top up, 400 mA Beam scrubbing OP Shift Crew
06:50 - 07:00 no beam Beam Dump, Vorbereitung Tunnelzugang Überwacht OP Shift Crew
07:00 - 07:30 no beam Freimessung Tunnel durch SU {{OliverC}}
07:30 - 17:00 no beam Vorbereitungsarbeiten Beamline Inbetriebnahmen {{Juri}}
17:00 - 20:00 unstable Maschine hochfaren OP Shift Crew
20:00 - 24:00 top up, 400 mA Beam scrubbing OP Shift Crew
Friday, 06.06.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
00:00 - 06:50 top up, 400 mA Beam scrubbing OP Shift Crew
06:50 - 07:00 no beam Beam Dump, Vorbereitung Tunnelzugang Überwacht OP Shift Crew
07:00 - 07:30 no beam Freimessung Tunnel durch SU {{OliverC}}
07:30 - 17:00 no beam Vorbereitungsarbeiten Beamline Inbetriebnahmen {{Juri}}
17:00 - 20:00 unstable Maschine hochfaren OP Shift Crew
20:00 - 24:00 top up, 400 mA Beam scrubbing OP Shift Crew
Saturday, 07.06.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
00:00 - 24:00 top up, 400 mA Beam scrubbing OP Shift Crew
Sunday, 08.06.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
00:00 - 24:00 top up, 400 mA Beam scrubbing OP Shift Crew

2025, KW22

Time
Machine State Description
Contact
Monday, 26.05.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
08:00 - 10:00 unstable OP Training {{Felix}}
10:00 - 14:00 mA? Beam current vs beam size check {{Cigdem}} and {{Felix}}
14:00 - 22:00 mA? MBFB Development {{Boris}} and {{Pedro}}
22:00 - 08:00 top up, 400 mA Beam scrubbing OP Shift Crew
Tuesday, 27.05.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
06:00 - 12:00 top up, 400 mA Vorbereitung Beamline SU Permit Validation SuperXAS {{OliverC}} and {{Maarten}}
08:30 - 09:00 decaying beam Linac Modulator 1 SF6 auffüllen {{Dani}}
12:00 - 14:00 unstable Check cabling/connection Timing/FPFB (GPACs) {{Romain}} and {{Pedro}}
14:00 - 20:00 unstable Check Timing Master FP control local mode {{Romain}} and {{Felix}}
20:00 - 08:00 top up, 400 mA Beam scrubbing OP Shift Crew
Wednesday, 28.05.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
08:00 - 10:00 top up, 400 mA Beamline SU Permit Validation Pollux/SuperXAS {{OliverC}} and {{Joerg}} and {{Maarten}}
10:00 - 12:00 unstable Postmortem trigger alignment {{Romain}}, {{Roger}}, {{Cigdem}} and {{Felix}}
12:00 - 22:00 unstable FOFB/MBFB Development {{Boris}} and {{Pedro}} and {{Goran}}
22:00 - 24:00 top up, 400 mA Beam scrubbing OP Shift Crew
Thursday, 29.05.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
00:00 - 24:00 top up, 400 mA Beam scrubbing (Ascension) OP Shift Crew
Friday, 30.05.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
00:00 - 10:00 top up, 400 mA Beam scrubbing OP Shift Crew
10:00 - 14:30 unstable Injection studies {{Masamitsu}} and {{Martin}}
14:30 - 20:00 unstable Reduce beam size and measure the PSF of the zone plate setup {{Cigdem}} and {{Masamitsu}}
20:00 - 24:00 top up, 400 mA Beam scrubbing OP Shift Crew
Saturday, 31.05.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
00:00 - 24:00 top up, 400 mA Beam scrubbing OP Shift Crew
Sunday, 01.06.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
00:00 - 24:00 top up, 400 mA Beam scrubbing OP Shift Crew

2025, KW21

Time
Machine State Description
Contact
Monday, 19.05.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
00:00 - 24:00 Shutdown X04 Frontend Repair {{Reno}}
08:00 - 18:00 Beamline Development X07DA/Pollux - Shutter, PLC and PSYS Tests {{Tony}}
Tuesday, 20.05.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
00:00 - 15:00 Shutdown X04 Frontend Repair {{Reno}}
08:00 - 15:00 Beamline Development X07DA/Pollux - Escalation Tests {{Tony}}
15:00 - 18:00 Machine Startup Startup COM Team
18:00 - 08:00 top up, 400 mA Scrubbing OP Shift Crew
Wednesday, 21.05.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
08:00 - 18:00 top up, 60 mA First Light ADDAMS, Pollux & SuperXAS {{Felix}}
18:00 - 08:00 top up, 400 mA Beam scrubbing OP Shift Crew
Thursday, 22.05.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
08:00 - 10:00 Tunnel Access SLS tour for 5-way meeting {{Thomas}}
10:00 - 12:00 Machine Startup Startup COM Team
12:00 - 18:00 top up, 40 mA First Light ADDAMS, Pollux & SuperXAS {{Felix}}
18:00 - 08:00 top up, 400 mA Beam scrubbing OP Shift Crew
Friday, 23.05.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
08:00 - 18:00 top up, 40 mA First Light ADDAMS, Pollux & SuperXAS {{Felix}}
18:00 - 24:00 top up, 400 mA Beam scrubbing OP Shift Crew
Saturday, 24.05.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
00:00 - 24:00 top up, 400 mA Beam scrubbing OP Shift Crew
Sunday, 25.05.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
00:00 - 24:00 top up, 400 mA Beam scrubbing OP Shift Crew

2025, KW20

Time
Machine State Description
Contact
Monday, 12.05.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
10:00 - 12:00 unstable LLRF Tests {{Lukas}} and {{Roger}}
14:00 - 16:00 unstable LLRF FW-Update FO-Strahlstrom basierte Anpassung der HF-Limiten {{Roger}}
20:00 - 08:00 top up, 400 mA Beam scrubbing OP Shift Crew
Tuesday, 13.05.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
08:00 - 09:20 unstable OP Training {{Felix}}
09:20 - 14:00 decaying beam, 200 mA Booster Optimization {{Jonas}}
09:20 - 14:00 decaying beam, 200 mA, no OFB Check implementation of ID feedforward for X04 (elog) {{Simona}} and {{Masamitsu}}
14:00 - 20:00 unstable Optics refinement {{Masamitsu}} and {{Boris}}
20:00 - 08:00 top up, 400 mA Beam scrubbing OP Shift Crew
Wednesday, 14.05.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
08:00 - 09:00 unstable OP Training {{Felix}}
09:00 - 14:00 decaying beam, 400 mA Vertical girder alignment with the girder mover system for sector 8 (elog) {{Michael}}
14:00 - 20:00 unstable MBFB Development {{Boris}}
20:00 - 09:00 top up, 400 mA Beam scrubbing OP Shift Crew
Thursday, 15.05.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
09:00 - 14:00 unstable SU Collimators (and Dump) {{Felix}} and SU
14:00 - 20:00 unstable 3HC tuning / bunch lengthening optimization for 30 bucket gap and camshaft investigations {{Micha}}, {{Alessandro}}, {{Helge}}, {{Cigdem}} and {{Felix}}
20:00 - 08:00 top up, 400 mA Beam scrubbing OP Shift Crew
Friday, 16.05.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
08:00 - 10:00 unstable Finish check new timing version {{Felix}} and {{Romain}}
10:00 - 14:00 unstable 3HC tuning / bunch lengthening optimization for 30 bucket gap and camshaft investigations {{Micha}}, {{Alessandro}}, {{Helge}}, {{Cigdem}} and {{Felix}}
SHUTDOWN (DUO PLAN) {: colspan=3} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}

2025, KW19

Time
Description
Contact
Friday, 09.05.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
07:30 - 08:00 Sperre Shutter und Strahlfreigabe SU
08:00 - 18:00 Test new timing version and machine startup {{Romain}} and {{Felix}}
18:00 - 24:00 Beam scrubbing OP Shift Crew
Saturday, 10.05.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
00:00 - 24:00 Beam scrubbing OP Shift Crew
Sunday, 11.05.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
00:00 - 11:00 Beam scrubbing OP Shift Crew
11:00 - 21:00 Booster injection/ramp optimization {{Jonas}}
11:00 - 21:00 Storage ring tune based optics measurements {{Jesus}}
21:00 - 08:00 Beam scrubbing over night OP Shift Crews and {{Felix}}

2025, KW16

Time
Description
Contact
Monday, 14.04.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
08:00 - 11:00 OP training injector SLS OP IB Team
11:00 - 18:00 SOFB {{Boris}}
18:00 - 08:00 Beam scrubbing over night OP Shift Crews and {{Felix}}
Tuesday, 15.04.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
08:00 - 10:00 OP training injector SLS OP IB Team
10:00 - 14:00 SOFB test new FW {{Boris}}
14:00 - 18:00 LLRF-Tests -Messungen und -Optimierung {{Roger}} and {{Radoslaw}}
18:00 - 22:00 SOFB test new FW {{Boris}}
22:00 - 08:00 Beam scrubbing over night OP Shift Crews and {{Felix}}
Wednesday, 16.04.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
07:30 - 08:00 SU Freimessung Tunnel {{OliverC}}
SHUTDOWN (DUO PLAN) {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}

2025, KW15

Time
Description
Contact
Monday, 07.04.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
08:00 - 11:00 Bunch lengthening optimization using 3HC and streak camera {{Micha}}, {{Alessandro}} and {{Cigdem}}
11:00 - 18:00 SOFB {{Boris}} and {{Goran}}
18:00 - 07:30 Beam scrubbing over night OP Shift Crews and {{Felix}}
Tuesday, 08.04.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
07:30 - 24:00 Tunnel Access {: colspan=3} &#8288 {: style="padding:0"}
Wednesday, 09.04.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
00:00 - 12:00 Tunnel Access {: colspan=3} &#8288 {: style="padding:0"}
12:00 - 14:00 Machine Startup
14:00 - 19:00 SOFB {{Boris}}
19:00 - 24:00 Optics measurements {{Jesus}} and {{Jonas}}
Thursday, 10.04.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
08:00 - ??:?? Machine Startup ...
??:?? - ??:?? SLS 2.0 first light at beamlines PX-III and Debye (60 mA, shutters closed) ...
??:?? - ??:?? SLS 2.0 first light at beamlines PX-III and Debye (ramp up to 400 mA, shutters open) ...
18:00 - 24:00 Optics measurements {{Jesus}} and {{Jonas}}
Friday, 11.04.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
??:?? - ??:?? SLS 2.0 first light at beamlines PX-III and Debye (400 mA, shutters open, light in experiments) ...
18:00 - 24:00 Optics measurements {{Jesus}} and {{Jonas}}
24:00 - 08:00 Beam scrubbing over weekend OP Shift Crews and {{Felix}}
Sunday, 13.04.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
10:00 - 18:00 Optics measurements {{Jesus}} and {{Jonas}}

2025, KW14

Time
Description
Contact
Monday, 31.03.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
08:00 - 11:00 OP training injector SLS OP IB Team
11:00 - 12:00 Current increase SLS COM Team
12:00 - 18:00 SOFB commissioning {{Boris}}
18:00 - 08:00 Beam scrubbing over night OP Shift Crews and {{Felix}}
Tuesday, 01.04.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
08:00 - 12:00 Tunnel Access {: colspan=3} &#8288 {: style="padding:0"}
12:00 - 16:00 timing tests {{Romain}} and {{Felix}}
16:00 - 17:00 Current increase SLS COM Team
18:00 - 08:00 Beam scrubbing over night OP Shift Crews and {{Felix}}
Wednesday, 02.04.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
08:00 - 10:00 OP training injector SLS OP IB Team
10:00 - 14:00 Measure beta functions and ADTS {{Jesus}}
14:00 - 15:00 Current increase SLS COM Team
15:00 - 18:00 booster extraction {{Jonas}}
18:00 - 08:00 Beam scrubbing over night OP Shift Crews and {{Felix}}
Thursday, 03.04.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
08:00 - 10:00 OP training injector SLS OP IB Team
10:00 - 14:00 LLRF-Tests -Messungen und -Optimierung {{Lukas}}, {{Roger}} and Radoslaw
14:00 - 15:00 Current increase SLS COM Team
15:00 - 18:00 Test all 4 girder movers for sector 6 {{Michael}}
18:00 - 10:00 Beam scrubbing over night OP Shift Crews and {{Felix}}
Friday, 04.04.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
10:00 - 14:00 ID Feed Forward tests {{Simona}} and {{Masamitsu}}
14:00 - 18:00 SOFB commissioning {{Boris}}
18:00 - 08:00 Beam scrubbing over weekend OP Shift Crews and {{Felix}}

2025, KW13

Time
Description
Contact
Monday, 24.03.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
08:00 - 10:00 OP training injector SLS OP IB Team
11:00 - 16:00 NAFF based tune measurement tests {{Jonas}} and {{Jesus}}
16:00 - 17:00 current increase Com Team
18:00 - 08:00 Beam scrubbing over night OP Shift Crews and {{Felix}}
Tuesday, 25.03.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
07:30 - 15:00 Tunnel Access {: colspan=3} &#8288 {: style="padding:0"}
15:00 - 22:00 Timing and Injection guard tests {{Romain}} and {{Felix}}
22:00 - 08:00 Beam scrubbing over night OP Shift Crews and {{Felix}}
Wednesday, 26.03.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
08:00 - 10:00 OP training: Injection Optimization {{Volker}}
10:00 - 14:00 LLRF HLA tests {{Lukas}} and {{Roger}}
14:00 - 18:00 lifetime measurements Micha and {{Felix}}
18:00 - 08:00 Beam scrubbing over night OP Shift Crews and {{Felix}}
Thursday, 27.03.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
08:00 - 10:00 OP training injector SLS OP IB Team
10:00 - 14:00 ID feed forward development {{Simona}} and {{Masamitsu}}
14:00 - 18:00 LLRF FW tests {{Lukas}}, {{Roger}} and Radeck
18:00 - 08:00 Beam scrubbing over night OP Shift Crews and {{Felix}}
Friday, 28.03.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
08:00 - 10:00 OP training injector SLS OP IB Team and {{Felix}}
10:00 - 14:00 ID feed forward development {{Simona}} and {{Masamitsu}}
14:00 - 15:00 Current increase Com Team
15:00 - 18:00 Optics {{Masamitsu}}
18:00 - 08:00 Beam scrubbing over weekend OP Shift Crews and {{Felix}}

2025, KW12

Time
Description
ELOG
Contact
Monday, 17.03.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
08:00 - 10:00 OP training injector ... SLS OP IB Team
10:00 - 14:00 Measurements of the beta-functions using the auxiliary quadrupoles ... {{Jesus}} and {{Jonas}}
14:00 - 18:00 Single bunch for testing the MBFB kickers (passive, parasitic) ... {{Micha}}
14:00 - 18:00 Test ID motion DEV-LOG 2443 {{Masamitsu}}
18:00 - 08:00 Beam scrubbing over night ... OP Shift Crews and {{Felix}}
Tuesday, 18.03.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
08:00 - 12:00 Tunnel Access {: colspan=3} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
12:00 - 14:00 Startup and timing tests ... SLS IB Team and {{Felix}}
14:00 - 18:00 Single bunch for testing the MBFB kickers (active, dedicated) ... {{Micha}}
18:00 - 08:00 Downtime, thin septum not pulsing {: colspan=3} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
Wednesday, 19.03.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
08:00 - 11:00 Tunnel Access for thin septum investigation &#8288 {: style="padding:0"}
10:00 - 14:00 Improve LLRF Interlocks ... {{Lukas}} and {{Roger}}
14:00 - 18:00 Single bunch for testing the MBFB kickers (active, dedicated) ... {{Micha}}
18:00 - 08:00 Beam scrubbing over night ... OP Shift Crews and {{Felix}}
Thursday, 20.03.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
08:00 - 10:00 OP training injector SLS-LOG 60216 SLS IB Team
10:00 - 14:00 ID FeedForward Tests/Development ... {{Masamitsu}} and {{Simona}}
14:00 - 18:00 Improve LLRF Interlocks ... {{Lukas}} and {{Roger}}
18:00 - 08:00 Beam scrubbing over night ... OP Shift Crews and {{Felix}}
Friday, 21.03.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
08:00 - 10:00 OP training injector ... {{Lukas}}
10:00 - 14:00 Measurements of the beta-functions using the auxiliary quadrupoles ... {{Jesus}} and {{Jonas}}
10:00 - 14:00 MBFB Kicker ... {{Micha}}
14:00 - 18:00 Commissioning of diagnostic beamlines ... {{Cigdem}}
18:00 - 08:00 Beam scrubbing over weekend ... OP Shift Crews and {{Felix}}

2025, KW11

Time
Description
ELOG
Contact
Tuesday, 11.03.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
13:00 - 14:00 Tunnel patrol ... {{Juri}}, {{MartinB}} and somebody from cooling group
14:00 - 15:00 Booster and SR LLRF tests ... {{Lukas}} and {{Roger}}
14:00 - 15:00 Check VCS Interlocks ... {{Natalia}}, {{Tony}} and {{Felix}}
15:00 - 17:00 Reestablish stored beam and optimize injection ... {{Volker}}, {{Jonas}}, {{Masamitsu}} and {{Felix}}
17:00 - 22:00 Beam dump kicker commissioning ... {{Martin}} and {{Felix}} and Jonas, Masamitsu
22:00 - 08:00 Beam scrubbing during night (14 h) ... OP Shift Crews and {{Felix}}
Wednesday, 12.03.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
08:00 - 10:00 OP self-training injector ... ??
08:00 - 10:00 Repair magnet power supplies SLS-LOG 60080 ??
10:00 - 14:00 LLRF feedbacks to be tested several times at high currents {{Lukas}} and {{Roger}}
14:00 - 18:00 Storage ring phase 5 ... {{Masamitsu}}
18:00 - 08:00 Beam scrubbing during night (14 h) ... OP Shift Crews and {{Felix}}
Thursday, 13.03.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
08:00 - 10:00 OP Training ... {{Volker}}
10:00 - 14:00 3HC tuning ... {{Lukas}}
14:00 - 18:00 Storage ring phase 5 ... {{Masamitsu}}
18:00 - 08:00 Beam scrubbing during night (14 h) ... OP Shift Crews and {{Felix}}
Friday, 14.03.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
08:00 - 10:00 OP Training ... {{Volker}}
10:00 - 12:00 Linac klystron 2 solenoid tuning for lower charging voltage ... {{Juergen}} and {{Carl}}
12:00 - 14:00 Optimization of injection ... {{Volker}}, {{Jonas}}, {{Masamitsu}} and {{Felix}}
14:00 - 16:00 Instability at 100 mA ... {{Lukas}} and {{Micha}}
16:00 - 18:00 Storage ring phase 5 ... {{Masamitsu}}
18:00 - 08:00 Beam scrubbing during weekend (62 h) ... OP Shift Crews and {{Felix}}

2025, KW08

Time
Description
ELOG
Contact
Monday, 17.02.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
06:00 - 08:00 OP beam scrubbing SLS-LOG 60022 Shift Crew
08:00 - 09:30 OP Training + MD Support - {{Felix}} and Shift Crew
11:00 - 13:00 Injector DEV-LOG 2422 {{Masamitsu}}
13:00 - 16:00 Tunnel Access {: colspan=3} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
12:00 - 18:00 Dispersion knob preparation DEV-LOG 2423 {{Masamitsu}}
20:00 - 08:00 OP Beam Scrubbing SLS-LOG 60031 Shift Crew
Tuesday, 18.02.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
08:00 - 20:00 OP Training + MD Support ... {{Felix}}
09:00 - 11:00 Loss Studies / Reference Measurements ... {{Volker}}, {{Felix}} and {{Cigdem}}
11:00 - 12:00 Test BPM Orbit Interlocks ... {{Felix}} and {{Goran}}
12:00 - 18:00 Storage Ring Phase 5 ... {{Masamitsu}}
20:00 - 07:00 OP Beam Scrubbing SLS-LOG 60031 Shift Crew
Wednesday, 19.02.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
06:50 - 07:00 OP Vorbereitung Tunnelzutritt ... Shift Crew
07:00 - 07:30 SU Freimessung Tunnel ... {{OliverC}}
SHUTDOWN (DUO PLAN) {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}

2025, KW07

Time
Description
ELOG
Contact
Monday, 10.02.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
06:00 - 08:00 OP ... Shift Crew
08:00 - 10:00 OP Training ... {{Felix}}
10:00 - 12:00 Injector ... {{Jonas}}
12:00 - 18:00 Storage Ring Phase 5 ... {{Masamitsu}}
Tuesday, 11.02.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
06:00 - 06:30 Vorbereitung Tunnelzutritt (OP) ... Shift Crew
06:30 - 11:00 Tunnel Access {: colspan=3} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
10:00 - 12:00 Injector ... {{Jonas}}
12:00 - 18:00 Storage Ring Phase 5 ... {{Masamitsu}}
Wednesday, 12.02.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
06:00 - 08:00 OP ... Shift Crew
08:00 - 10:00 OP Training ... {{Felix}}
10:00 - 12:00 Injector ... {{Jonas}}
12:00 - 18:00 Storage Ring Phase 5 ... {{Masamitsu}}
Thursday, 13.02.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
06:00 - 08:00 OP ... Shift Crew
08:00 - 10:00 OP Training ... {{Volker}}
10:00 - 14:00 Local LOCO Tests ... {{Simona}}
12:00 - 18:00 Storage Ring Phase 5 ... {{Masamitsu}}
Friday, 14.02.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
06:00 - 08:00 OP ... Shift Crew
08:00 - 10:00 OP Training ... {{Volker}}
10:00 - 12:00 Injector ... {{Jonas}}
12:00 - 18:00 Storage Ring Phase 5 ... {{Masamitsu}}

2025, KW06

Time
Description
ELOG
Contact
Monday, 03.02.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
06:00 - 08:00 OP Shift Summary SLS-Log 59885 Shift Crew
08:00 - 10:00 Longitudinal Linac Characterization Dev-Log 2401 {{Simona}}
13:00 - 14:00 Storage ring chromaticity measurement Dev-Log 2402 {{Jonas}}
Tuesday, 04.02.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
06:00 - 08:00 OP Shift Summary SLS-Log 59900 Shift Crew
07:00 - 11:00 Tunnel Access {: colspan=3} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
11:00 - 18:00 Recommissioning of the timing system ... {{Romain}}
Wednesday, 05.02.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
06:00 - 08:00 OP ... Shift Crew
08:00 - 09:30 Timing Studies ... {{Romain}}
10:00 - 12:00 BRTL adjustment + energy spread measurement ... {{Jonas}}
11:30 - 12:30 BRTL ICT Setup ... {{Cigdem}}
12:00 - 18:00 Storage Ring Orbit/Optics Measurement with Booster off ... {{Masamitsu}}
Thursday, 06.02.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
06:00 - 08:00 OP ... Shift Crew
08:00 - 10:00 Operator Training ... {{Volker}}
10:00 - 14:00 Booster beam decoupling ... {{Jonas}}
14:00 - 18:00 Storage Ring Phase 4 ... {{Masamitsu}}
Friday, 07.02.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
06:00 - 08:00 OP ... Shift Crew
06:00 - 08:00 Timing System Reboot ... {{Romain}}
08:00 - 10:00 Operator Training ... {{Volker}}
10:00 - 14:00 Booster emittance exchange ... {{Jonas}}
14:00 - 18:00 Storage Ring Phase 4 ... {{Masamitsu}}

2025, KW05

Time
Description
ELOG
Contact
Monday, 27.01.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
06:00 - 08:00 OP Startup & Training ... {{Max}}
08:00 - 11:00 Linac Optimization ... {{Volker}}
11:00 - 18:00 Storage Ring: restore stored beam Dev-Log 2384 {{Masamitsu}}
Tuesday, 28.01.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
06:00 - 08:00 OP Startup & Training ... {{Max}}
08:00 - 10:00 Linac/LTB Optimization ... {{Volker}}
10:00 - 14:00 Storage Ring - Stored beam: optimize orbit, optics and accumulation .... {{Masamitsu}}
14:00 - 18:00 Storage Ring - Stored beam: setup PCT and XO1DD .... {{Cigdem}}
14:00 - 18:00 Storage Ring - Stored beam: setup RF phasing .... {{Lukas}}
Wednesday, 29.01.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
06:00 - 22:00 OP Shift Summary SLS-Log 59840 {{Max}}, {{Sascha}} and {{Felix}}
07:30 - 11:00 Tunnel Access {: colspan=3} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
10:00 - 14:00 Storage Ring - Stored beam: orbit, optics, accumulation, BBA .... {{Masamitsu}}
Thursday, 30.01.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
06:00 - 08:00 Linac ... {{Juergen}}
06:00 - 22:00 OP Shift Summary (SLS-Log 59841)[https://elog-gfa.psi.ch/SLS/59841] {{Max}}, {{Sascha}} and {{Felix}}
10:00 - 12:00 Booster Optimization ... {{Jonas}}
Friday, 31.01.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
06:00 - 08:00 OP Shift Summary SLS-Log 59842 Shift Crew
08:00 - 10:00 Injector Setup OP Training ... {{Volker}}
08:00 - 10:00 DBPM3 update ... {{Boris}}
10:00 - 16:00 Storage Ring Commissioning ... {{Masamitsu}}
10:00 - 16:00 Super-3HC Tuning ... {{Lukas}}

2025, KW04

Time
Description
ELOG
Contact
Monday, 20.01.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
06:00 - 08:00 Injector Startup + OP Training {{Felix}}
08:00 - 09:00 RF Master Oscillator sweep tests (RF, BPM) without Beam Dev-Log 2372
RF-LOG 1910
{{Boris}} and {{Lukas}}
10:00 - 12:00 Investigation of Booster-RF Ramp-Up Issues RF-LOG 1911 {{Lukas}}
12:00 - 19:00 Multiple turns storage ring ... {{Masamitsu}}
Tuesday, 21.01.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
06:00 - 08:00 OP Startup & Training {{Sascha}}
08:00 - 10:00 Tunnel Access {: colspan=3} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
10:00 - 12:00 Injector optimization Dev-Log 2376 {{Jonas}}
13:00 - 21:00 Storage ring Dev-Log 2378 {{Masamitsu}}
Wednesday, 22.01.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
06:00 - 08:15 OP Startup & Training SLS-Log 59748 {{Stefan}}
08:15 - 10:00 Linac Optimization Dev-Log 2379 {{Volker}}
10:00 - 22:00 Storage ring commissioning phase 3: multi-turn Dev-Log 2380 {{Masamitsu}}
Thursday, 23.01.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
06:00 - 08:30 OP Startup & Training SLS-Log 59764 {{Stefan}} and {{Felix}}
08:30 - 12:30 Storage ring commissioning phase 4: accumulation SLS-Log 2381 {{Masamitsu}}
Friday, 24.01.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
06:00 - 08:00 OP Startup & Training SLS-Log 59776 {{Stefan}}
08:00 - 10:00 Storage ring RF phase investigation RF-LOG 1916 {{Lukas}} and {{Roger}}
10:00 - 22:00 Restoring Stored Beam Dev-Log 2382 {{Masamitsu}}

2025, KW03

Time
Description
ELOG
Contact
Tuesday, 14.01.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
09:00 - 15:00 Restart Injector Complex Dev-LOG 2358 {{Jonas}}
15:00 - 17:00 BRTL Measurements Dev-LOG 2364 {{Jonas}}
17:00 - 19:00 1st injection to storage ring Dev-LOG 2360 {{Masamitsu}}
Wednesday, 15.01.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
08:00 - 09:00 Test 3HC Interlock via MIS SLS-LOG 59717 {{Lukas}}
09:00 - 10:00 Optimize BRTL Dev-LOG 2364 {{Jonas}}
10:00 - 18:00 Injection and 1st turn storage ring Dev-LOG 2365 {{Masamitsu}}
Thursday, 16.01.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
07:00 - 13:00 Tunnel Access {: colspan=3} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
13:00 - 16:00 Booster Optimization Dev-LOG 2367 {{Jonas}}
16:00 - 21:00 First turn storage ring Dev-LOG 2367 {{Masamitsu}}
Friday, 17.01.2025 {: colspan=4} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
06:00 - 08:00 Injector Startup + OP Training {{Felix}}
09:00 - 12:00 Injector optimization Dev-Log 2368 {{Jonas}}
12:00 - 13:00 Tunnel Access {: colspan=3} &#8288 {: style="padding:0"} &#8288 {: style="padding:0"}
13:00 - 21:00 Multiple turns storage ring Dev-Log 2369 {{Masamitsu}}