All checks were successful
Build and Deploy Documentation / build-and-deploy (push) Successful in 20s
6.3 KiB
6.3 KiB
description, template, hide
| description | template | hide | |
|---|---|---|---|
| Landing page with overview and infos concerning SLS operation | main.html |
|
Useful SLS Links
- Status Overview
- CPS Internet Page
- CAS Internet Page
- CPS Intranet Page
- CAS-ASA Intranet Page
- DUO Calendar
- Operation Elog
- Accelerator Wiki
Mailing Lists
The following mailing lists have been prepared for the SLS 2.0 Operations Management:
-
PSI.SLS-MDM (SLS 2.0 machine experts are the members)
-
PSI.SLS-UOM (SLS 2.0 beamline experts are the members via PSI.CPS-SLS-all)
-
PSI.SLS-JCM (SLS 2.0 managers / coordinators and responsibles)
Please send membership requests to felix.armborst@psi.ch.
Meetings
- Machine Development Meeting (MDM)
Focused on machine development shifts for the SLS 2.0- Target audience are machine experts and interested beamline experts
- Reports on machine development shifts and operation
- Requests for and planning of upcoming machine development shifts
- User Operations Meeting (UOM)
Focused on the beamline development shifts for SLS 2.0- Target audience are beamline experts and interested machine experts
- Reports on beamline development shifts and operation
- Requests for and planning of upcoming beamline development shifts
- Requests for and planning of upcoming user operations shifts
- Joint Coordination Meeting (JCM)
Focused on the exchange of information between the different managers / coordinators for the SLS 2.0- Participants are the SLS 2.0
- Operations Manager
- Felix Armborst
- Jonas Kallestrup (deputy)
- Machine Coordinator
- Jonas Kallestrup
- Felix Armborst (deputy)
- Area Coordinator
- Elmar Zehnder
- Juri Honegger (deputy)
- Machine Responsible CAS
- Hans Braun
- Thomas Schietinger (deputy)
- Machine Responsible CPS
- Frithjof Nolting
- Oliver Bunk (deputy)
- Operations Manager
- Participants are the SLS 2.0
Mandates
The SLS 2.0 Operations Manager is Felix Armborst and has the following mandate:
- Develop and steer overall operation, development and shutdown schedule
- Coordinate with all stakeholders including operations and other accelerator facilities at PSI
- Planning of annual DUO SLS Operations calender schedule
- Report all relevant information including short term machine and beamline development plans at weekly internal operations meetings (WöBs)
- Develop and steer machine and beamline development plans
- Coordinate with machine groups on equipment, control and SW readiness and validation testing
- Coordinate with beam dynamics groups on machine development activities
- Coordinate with beamline groups on beamline development activities
- Develop and steer operator training
- Defining theoretical and practical requirements for obtaining different levels (A-, and B-Operator)
- Preparing and conducting theoretical and practical operator trainings
- Preparing and conducting theoretical and practical operator exams
- Handling of any schedule or technical issues
- Analyse performance impact
- Develop mitigation measures in collaboration with responsible groups
- Report possibly resulting investment requirements to machine coordinator
- Develop and maintain deployment plans for interfaces, high level SW and equipment integration
- Follow up testing and update planning
- coordinate with control responsible for the SLS
- Prepare and analyse the SLS 2.0 operations statistics
- Report the annual SLS 2.0 operations statistics at the European Synchrotron Light Sources Workshop (ESLS)
- Write SLS 2.0 part of the annual report "Operation of the PSI Accelerator Facilities"
- Analyse operations statistics with regard to accelerator reliability and propose improvements
The SLS 2.0 Machine Coordinator is Jonas Kallestrup and has the following mandate:
- Follow up latest developments in Beam Dynamics / Collevtive Effects simulations and measurements, analyse performance impact and steer studies and mitigations
- Develop measurement techniques for hitherto poorly quantified parameters
- Report to
- Bereichskonferenz 1/month
- Every other week Extended ASA Meeting on Machine Topics
- 2 Budget Workshops / year
- Facilitate maintenance tasks
- collect information from expert groups
- compile reports describing equipment to maintained, summarizing possible solutions together with potential timelines and costs.
- present report to relevant PSI management layers
- coordinate execution of solutions
- Address technical aspects limiting SLS 2.0 operation and science, and propose upgrades
- collect information from expert groups
- compile reports describing the limitations and their impact on SLS 2.0 operation and science, summarizing possible solutions together with potential timelines and costs.
- present report to relevant PSI management layers
- coordinate execution of solutions
- Liaison with beamlines to ensure that the SLS 2.0 storage ring meets their scientific needs
- develop and implement beam operation modes that addresses current and future needs of SLS 2.0 beamlines
- propose and develop novel beam operation modes which may enable so far unexplored science, and survey their applicability to SLS 2.0 beamlines
Documentation on how to create such a website is available on gitlab.