35 lines
1.3 KiB
Python
35 lines
1.3 KiB
Python
|
|
pgroup_scratch = "p19150" # Scratch
|
|
|
|
pgroup = "p19150" # Scratch
|
|
# pgroup = "p19152" # Scratch
|
|
|
|
# pgroup = "p19739" # commissioning March 2022 -- July 2022
|
|
# pgroup = "p20443" # commissioning Wavefront Sensor August 2022 (active)
|
|
|
|
# pgroup = "p20558" # SwissMX commissioning 3
|
|
# pgroup = "p20557" # CrQ PMS commisioning 1
|
|
# pgroup = "p20509" # CrQ commisioning DilSc1
|
|
# pgroup = "p20519" # beamline commissioning 2
|
|
# pgroup = "p20841" # CrQ PMS commisioning 2 (Jan 2023)
|
|
# pgroup = "p20993" # CrQ commisioning DilSc2 (March 2023)
|
|
# pgroup = "p21147" # SAXS
|
|
# pgroup = "p21238" # Cristallina photon diagnostics p-group with Chris
|
|
# pgroup = "p21224" # SwissMX commisioning 7
|
|
|
|
|
|
# pgroup = "p20840" # Cr beamline commisioning (Jan-Feb 2023)
|
|
# pgroup = "p21261" # CrQ PMS-3 July 2023
|
|
|
|
# pgroup = "p21528" # Cr-MX Colletier 2023-09-05
|
|
# pgroup = "p21516" # Beamline commissioning September 26-27, November 7 2023
|
|
# pgroup = "p21563" # Dil-Sc / diffractometer / tilted bunch / LiErF4 (/ TmVO4)
|
|
|
|
# pgroup = "p21569" # Dil-Sc / diffractometer / tilted bunch / LiErF4 (/ TmVO4), November 17-
|
|
# pgroup = "p21592" # HVE commissioning
|
|
# pgroup = "p21640" # Dil-Sc / diffractometer / LiErF4 : 4 March 2024
|
|
|
|
# pgroup = "p21920" # Beamline commissioning 2024
|
|
|
|
# pgroup = "p21741" # CrQ - DilSc - SAXS LiHoF4
|