start of beamtime p21741

This commit is contained in:
2024-05-07 11:29:52 +02:00
parent f9d036bb9e
commit a65e9070eb
8 changed files with 644 additions and 28 deletions

View File

@ -175,6 +175,10 @@ from devices.diffractometer import Diffractometer
diffractometer = Diffractometer("diffractometer")
from devices.dilsc import Dilution
dilution = Dilution()
################# Stand setup ##################
# TODO: requires the stand client, need small howto how to start and configure or let it run all the time
@ -193,10 +197,15 @@ spreadsheet = Spreadsheet(
"TRXBASE": diffractometer.trx_base,
"TRYBASE": diffractometer.try_base,
"THETA": diffractometer.theta,
"TWOTHETA": diffractometer.twotheta,
"TWOTHETA": diffractometer.twotheta,
"Magnet_X": dilution.x,
"Magnet_Y": dilution.y,
"Magnet_Z": dilution.z,
"DilSc_T_plato": dilution.T_plato,
"DilSc_T_pucksensor": dilution.T_pucksensor,
},
placeholders=("comment", "sample"),
placeholders=("comment", "sample", "run_usable"),
host="saresc-vcons-02.psi.ch",
port=9090,
)
@ -231,7 +240,7 @@ instrument = "cristallina"
# pgroup = "p21238" # Cristallina photon diagnostics p-group with Chris
# pgroup = "p21224" # SwissMX commisioning 7
pgroup = "p19150" # Scratch
# pgroup = "p19150" # Scratch
# pgroup = "p19152" # Scratch
# pgroup = "p20840" # Cr beamline commisioning (Jan-Feb 2023)
@ -243,7 +252,11 @@ pgroup = "p19150" # Scratch
# pgroup = "p21569" # Dil-Sc / diffractometer / tilted bunch / LiErF4 (/ TmVO4), November 17-
# pgroup = "p21592" # HVE commissioning
pgroup = "p21640" # Dil-Sc / diffractometer / LiErF4 : 4 March 2024
# pgroup = "p21640" # Dil-Sc / diffractometer / LiErF4 : 4 March 2024
# pgroup = "p21920" # Beamline commissioning 2024
pgroup = "p21741" # CrQ - DilSc - SAXS LiHoF4
# setup pgroup specific logger
setup_logging_pgroup(pgroup)
@ -255,6 +268,7 @@ daq = SFAcquisition(
default_pvs=pvs,
default_detectors=detectors,
rate_multiplicator=1,
spreadsheet=spreadsheet,
)