Files
Jungfraujoch/tests
leonarski_fandClaude Opus 4.8 6df657fe62 SG search: gate the systematic-absence test on intensity, not just I/sigma
The monoclinic 2_1 screw was missed on EP_cs_02-10 and EP_cs_01-17 (adopted P2
instead of P2_1). The 0k0-odd reflections are correctly measured as weak (~0.1-1%
of 0k0-even, matching XDS), but their merged sigmas are ~2x too small, so their
I/sigma clears the present_i_over_sigma cut and they count as screw-axis
violations - the search then falls back to the symmorphic group.

Add a resolution-normalised intensity E^2 = I / <I>(shell), computed from
equal-count resolution shells, and require a reflection to reach present_e_squared
(0.3) as well as present_i_over_sigma before it counts as violating a predicted
absence. This only tightens "present", so it cannot manufacture a screw whose
predicted-absent class carries real intensity (a symmorphic crystal's axial
reflections sit at E^2 ~ 1 and still register as violations).

On the 18-crystal rotation battery this recovers the screw on EP_cs_02-10 and
EP_cs_01-17 (-> P2_1) and, as a side effect, on MyoB (-> P2_1), pding4_001
(-> P4_122/P4_322) and pding4_003 (-> P2_2_2_1) - all confirmed by genuine absences
in the reference intensities (absent class at 0.02-0.76% of the allowed class),
which the old sigma-only test also missed. The other 13 crystals, indexing rate
and ISa are unchanged; the screw-free control (Ins_I -> I23/I2_13) is unaffected.

Add a regression test that reproduces the under-estimated-sigma screw and checks
the gate recovers it (and that disabling the gate reproduces the miss).

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-07-03 15:18:27 +02:00
..
2026-06-23 20:29:49 +02:00
2025-05-28 18:49:27 +02:00
2026-04-09 13:30:47 +02:00
2024-10-05 13:14:49 +02:00
2024-10-05 13:14:49 +02:00
2025-05-05 19:32:22 +02:00
2026-04-29 09:50:50 +02:00
2026-05-28 18:48:35 +02:00
2025-05-05 19:32:22 +02:00
2025-06-10 18:14:04 +02:00
2026-06-08 08:30:35 +02:00
2025-11-19 09:40:50 +01:00
2026-04-29 09:50:50 +02:00
2026-04-30 22:16:50 +02:00
2025-11-02 13:45:57 +01:00
2025-05-05 19:32:22 +02:00
2024-11-22 21:25:20 +01:00
2025-10-20 20:43:44 +02:00
2025-04-14 11:52:06 +02:00
2025-11-09 12:42:27 +01:00
2025-09-08 20:28:59 +02:00
2025-09-08 20:28:59 +02:00
2025-03-24 12:16:33 +01:00
2025-06-18 15:19:18 +02:00
2025-11-19 17:28:10 +01:00
2026-05-28 18:48:35 +02:00
2025-12-12 21:24:20 +01:00
2026-02-01 13:29:33 +01:00
2026-03-03 22:24:44 +01:00
2025-11-19 09:40:50 +01:00
2026-04-25 19:59:21 +02:00
2026-04-25 19:59:21 +02:00
2026-06-08 08:30:35 +02:00
2025-05-05 19:32:22 +02:00
2024-11-22 21:25:20 +01:00
2026-06-23 20:29:49 +02:00
2026-06-23 20:29:49 +02:00
2026-06-23 20:29:49 +02:00
2026-04-25 19:59:21 +02:00
2026-04-29 09:50:50 +02:00
2024-11-22 21:25:20 +01:00
2025-05-28 18:49:27 +02:00
2026-06-23 20:29:49 +02:00
2025-10-20 20:43:44 +02:00
2024-11-22 21:25:20 +01:00
2026-05-28 18:48:35 +02:00
2025-03-02 13:15:28 +01:00
2026-06-08 08:30:35 +02:00
2025-11-09 12:42:27 +01:00
2026-06-23 20:29:49 +02:00
2024-11-22 21:25:20 +01:00
2025-11-09 12:42:27 +01:00
2025-10-01 22:54:40 +02:00
2025-10-20 20:43:44 +02:00
2026-06-23 20:29:49 +02:00
2026-06-23 20:29:49 +02:00
2026-06-23 20:29:49 +02:00
2026-06-02 11:49:24 +02:00
2025-10-20 20:43:44 +02:00
2026-03-02 15:57:12 +01:00
2025-11-09 12:42:27 +01:00
2025-11-09 12:42:27 +01:00
2026-06-25 18:12:00 +02:00
2026-06-23 20:29:49 +02:00
2026-04-16 11:59:59 +02:00
2026-06-23 20:29:49 +02:00
2025-11-02 13:45:57 +01:00
2025-12-12 21:24:20 +01:00
2026-05-28 18:48:35 +02:00
2026-04-09 13:30:47 +02:00
2026-06-23 20:29:49 +02:00
2026-03-05 22:13:12 +01:00
2026-03-26 20:50:33 +01:00
2024-11-22 21:25:20 +01:00