Files
maliakal_d 75026a0f6b
Build on RHEL9 docker image / build (push) Successful in 4m50s
Build on RHEL8 docker image / build (push) Successful in 5m8s
Build and Deploy on local RHEL9 / build (push) Successful in 1m59s
Run Simulator Tests on local RHEL9 / build (push) Failing after 10m14s
Build and Deploy on local RHEL8 / build (push) Successful in 5m7s
Run Simulator Tests on local RHEL8 / build (push) Successful in 23m24s
pr automation 4 (#1554)
* If it doesnt find the milestone it should fail

* separated into 2 steps: 1. figure out the target milestone, 2. to set it. If main branch, do nothing, if rc branch target, then set milestone to that, if developer but with equivalent PRs listed with one in an rc branch, then that is the milstone, else read the yaml file and figure it out

* setting milestone only for developer or rc branches
2026-09-11 11:20:35 +02:00
..
2020-08-11 09:54:42 +02:00
2026-09-11 11:20:35 +02:00