Commit Graph
18 Commits
Author SHA1 Message Date
redford_s b5387153eb Added PAL modules. Still need to tidy data - first scans can probably go. 2018-03-02 15:05:49 +01:00
redford_s b968acd8f5 Added backplane pulsing scans for modules 109 and 110. 2017-12-15 11:51:26 +01:00
redford_s 6131754d32 Added calibration writer command for 4.5 M modules. 2017-11-29 13:48:13 +01:00
redford_s 26216563c3 Removed historical comments on modules, since they are now better documented in JFModuleHistory. 2017-11-29 10:16:30 +01:00
redford_s 34faf29ce9 Added BP scans for 4.5 M. Some modules recalibrated - to be sorted out. 2017-11-27 09:37:19 +01:00
redford_s f56235dabb Added backplane pulsing analysis for modules 066 and 094. 2017-10-30 17:20:47 +01:00
redford_s 634ad20368 Putting the modules into the right order. 2017-10-10 09:21:21 +02:00
redford_s e9c785f9eb Moved file locations into run script, rather than in analysis. Also made the location right (data1_ib). 2017-10-10 09:18:51 +02:00
redford_s ef5a83e276 Finished the calibration of module 059. 2017-10-10 09:04:26 +02:00
redford_s 1b192a4cba Added the backplane pulsing for module 059. Results look good. 2017-10-09 16:06:01 +02:00
redford_s 02855dda4c Added calibration of M055. 2017-09-22 12:34:29 +02:00
redford_s 507ee000d5 Calibration of modules 068 and 088 for the SLAC 1M. 2017-09-20 16:28:30 +02:00
redford_s 1b84c71c88 Added modules 069 and 079 for the SLAC 1M. 2017-09-19 09:28:55 +02:00
redford_s 9bb3559eba Added analyses of module 065. 2017-08-30 15:07:37 +02:00
redford_s 96cec88bb4 G1 calibration of module 045. 2017-06-12 10:20:48 +02:00
redford_s 21e439a471 Running CalibWriter for modules 027 and 040. 2017-04-07 15:53:39 +02:00
redford_s 6393d7b578 Adding analyses for modules 027 and 040. Robustness improvements, propagated to results from all modules. 2017-04-06 14:40:33 +02:00
redford_s 0afb4073b8 First commit of new calibration method using backplane pulsing instead of direct beam. 2017-03-16 09:16:57 +01:00