From b486e6cb5c0e90472abf93aa386568ff6baf165d Mon Sep 17 00:00:00 2001 From: x12sa Date: Mon, 21 Sep 2026 10:45:06 +0200 Subject: [PATCH] config update --- csaxs_bec/device_configs/ptycho_flomni.yaml | 98 ++++++------ docs/plans/flomni-fsamx-pid-centering.md | 166 ++++++++++++++++++++ 2 files changed, 215 insertions(+), 49 deletions(-) create mode 100644 docs/plans/flomni-fsamx-pid-centering.md diff --git a/csaxs_bec/device_configs/ptycho_flomni.yaml b/csaxs_bec/device_configs/ptycho_flomni.yaml index b010526e..036b72a1 100644 --- a/csaxs_bec/device_configs/ptycho_flomni.yaml +++ b/csaxs_bec/device_configs/ptycho_flomni.yaml @@ -90,21 +90,21 @@ foptx: connectionTimeout: 20 userParameter: #120 micros, 60 - in: -13.890 - out: -14 + # in: -13.890 + # out: -14 #150 micros, 60 # in: -14.191 # out: -13.831 #170 micron, 60 nm - #in: -13.8909 - #out: -13.831 + in: -13.8909 + out: -13.831 #250 micron, 30 nm, Abe structures # in: -13.8809375 # out: -14.1809 #250 micron, 30 nm, Tomas structures # in: -14.5490625 # out: -14.1809 - fzp_diameter: 120 # microns + fzp_diameter: 170 # microns fzp_outermost_zone_width: 60 # nm detector_distance: 7196 # mm, sample-to-detector; unknown for now fzp_details: "manufacturing notes here" # free-text FZP manufacturing notes @@ -129,11 +129,11 @@ fopty: connectionTimeout: 20 userParameter: #150 micron, 60 - in: 1.02 - out: 0.869 + # in: 1.02 + # out: 0.869 #170 micron, 60 nm - #in: 0.42 - #out: 0.57 + in: 0.42 + out: 0.57 #250 micron, 30 nm, Abe structures # in: 2.8299 # out: 2.8299 @@ -371,17 +371,17 @@ fosax: connectionTimeout: 20 userParameter: #120micron, 60 nm, 7.9 kev - in: 8.74251 - out: 5.1 + # in: 8.74251 + # out: 5.1 #150micron, 60 nm, 7.9 kev # in: 9.0393 # out: 5.1 #170 micron, 60 nm, 7.6 kev - #in: 8.7568 - #out: 5.1 + # in: 8.7568 + # out: 5.1 #170 micron, 60 nm, 7.9 kev - #n: 8.722151 - #ut: 5.1 + in: 8.718233 + out: 5.1 #250 micron, 30 nm, Abe structures # in: 8.7392 # out: 5.1 @@ -409,13 +409,13 @@ fosay: connectionTimeout: 20 userParameter: #120 micron, 60 nm, 7.9 kev - in: -0.645276 + # in: -0.645276 #150 micron, 60 nm, 7.9 kev #in: -0.6422 #170 micron, 60 nm, 7.6 kev #in: -0.0235 #170 micron, 60 nm, 7.9 kev - #in: -0.0563 + in: -0.062253 #250 micron, 30 nm, Abe structures # in: -2.3684 #250 micron, 30 nm, Tomas structures @@ -439,15 +439,15 @@ fosaz: readoutPriority: baseline connectionTimeout: 20 userParameter: - #150 micron, 60 nm, 7.9 kev, foptz 16.9, probe size 7.5 mu - in: 11.0998 - out: 6 + #150 micron, 60 nm + # in: 11.0998 + # out: 6 #170 micron, 60 nm, 7.6 kev #in: 8.5 #out: 6 #170 micron, 60 nm, 7.9 kev, foptz 16.9, probe size 7.5 mu - # in: 13.1 - # out: 6 + in: 14.1 + out: 6 # micron, 30 nm, 7.9 kev, very close to the sample. make sure foptz is 32.02 or smaller //abe's fzp's # in: 0.5 # out: -5 @@ -703,30 +703,30 @@ calculated_signal: # deviceTags: # - ptycho_flomni -omny_panda_continuous: - readoutPriority: async - deviceClass: csaxs_bec.devices.panda_box.panda_box_omny.PandaBoxOMNY - deviceConfig: - host: omny-panda.psi.ch - raw_stream_mode: true - signal_alias: - FMC_IN.VAL1.Value: cap_voltage_fzp_y - FMC_IN.VAL2.Value: cap_voltage_fzp_x - INENC1.VAL.Value: interf_st_fzp_y - INENC2.VAL.Value: interf_st_fzp_x - INENC3.VAL.Value: interf_st_rotz - INENC4.VAL.Value: interf_st_rotx - PCAP.GATE_DURATION.Value: pcap_gate_duration_value - # TTLIN1 (detector trigger) feeds both blocks below - confirmed 2026-09-15 against the - # omny-panda hardware, see docs/developer/panda_box_free_running_setup.md. PCAP.BITS0 - # is a shared 32-bit word; PandaBoxOMNY masks it to bit 0 (TTLIN1.VAL) before - # publishing gate_detector_active. COUNTER1 counts TTLIN1's falling edge, i.e. one - # increment per completed exposure; it also doubles as the on_complete signal. Confirmed - # working end-to-end 2026-09-15; now under speed testing beyond the initial 100 Hz. - PCAP.BITS0.Value: gate_detector_active - COUNTER1.OUT.Value: frame_counter - enabled: true - readOnly: false - softwareTrigger: false - deviceTags: - - ptycho_flomni +# omny_panda_continuous: +# readoutPriority: async +# deviceClass: csaxs_bec.devices.panda_box.panda_box_omny.PandaBoxOMNY +# deviceConfig: +# host: omny-panda.psi.ch +# raw_stream_mode: true +# signal_alias: +# FMC_IN.VAL1.Value: cap_voltage_fzp_y +# FMC_IN.VAL2.Value: cap_voltage_fzp_x +# INENC1.VAL.Value: interf_st_fzp_y +# INENC2.VAL.Value: interf_st_fzp_x +# INENC3.VAL.Value: interf_st_rotz +# INENC4.VAL.Value: interf_st_rotx +# PCAP.GATE_DURATION.Value: pcap_gate_duration_value +# # TTLIN1 (detector trigger) feeds both blocks below - confirmed 2026-09-15 against the +# # omny-panda hardware, see docs/developer/panda_box_free_running_setup.md. PCAP.BITS0 +# # is a shared 32-bit word; PandaBoxOMNY masks it to bit 0 (TTLIN1.VAL) before +# # publishing gate_detector_active. COUNTER1 counts TTLIN1's falling edge, i.e. one +# # increment per completed exposure; it also doubles as the on_complete signal. Confirmed +# # working end-to-end 2026-09-15; now under speed testing beyond the initial 100 Hz. +# PCAP.BITS0.Value: gate_detector_active +# COUNTER1.OUT.Value: frame_counter +# enabled: true +# readOnly: false +# softwareTrigger: false +# deviceTags: +# - ptycho_flomni diff --git a/docs/plans/flomni-fsamx-pid-centering.md b/docs/plans/flomni-fsamx-pid-centering.md new file mode 100644 index 00000000..1d3cbd0b --- /dev/null +++ b/docs/plans/flomni-fsamx-pid-centering.md @@ -0,0 +1,166 @@ +# Plan: improve the `fsamx` PID centering in `move_samx_to_scan_region` + +Status: **DRAFT — NOT FINAL, NEEDS FURTHER DISCUSSION. Not implemented.** +Written during live beamtime operation on request; no code changes made — see +the conversation this plan came from. It rests on one day of logs +(2026-09-18) and small samples (18 first-move cases, 25 later-iteration steps) +and has not been tested on the instrument. The open questions at the bottom +must be settled before any code is changed. + +## Context + +`RtFlomniController.move_samx_to_scan_region` +(`csaxs_bec/devices/omny/rt/rt_flomni_ophyd.py`, ~lines 181-230) centres +`fsamx` after the rt stage has moved to `cenx`. It reads the PID X voltage +(`get_pid_x()`, `g` command on the rt controller, range ±10 V) and compares it +with the expected voltage (`rtx` user parameter `rt_pid_voltage`, stored by +`feedback_enable_with_reset`). + +- If `|V - expected|` is below the start threshold: `No correction of fsamx needed`. +- Otherwise loop until `|V - expected| < 1`, each iteration doing + `pid_x_correction -= (V - expected) * 0.006` and moving `fsamx` to + `fsamx_in + cenx/1000*0.7 + pid_x_correction`, then `laser_tracker_on()`. + +**Trigger for this plan.** The start threshold was lowered from 2.0 V to 1.2 V +(uncommitted edit in the production working tree when this was written) with +the aim of reducing the target range below 0.05 V. Afterwards corrections rose +from about 8.5 to about 49 per hour and the readings still swung by about +±1-2 V. + +**Data source.** `/var/log/bec/DeviceServer.log` and `ScanServer.log` on +`x12sa-bec-001.psi.ch`, 2026-09-18 08:00-20:19. These logs are not part of the +repo. The relevant log messages come from the `rt_flomni_ophyd` logger +(`Current PID voltage`, `Moving fsamx to …, PID portion of that …`, +`No correction of fsamx needed`, `No further correction needed`). + +## Findings this plan rests on + +1. **The loop gain is too small, not too large.** The measured stage response + is 13.4 µm/V (rms 0.18 V over 25 steps at constant `cenx`), while the code + uses `0.006` mm/V = 6 µm/V. Each step therefore removes only about 45 % of + the error (measured contraction ×0.57, predicted ×0.55). Going from 1.2 V to + below 0.05 V takes about 6 iterations, each followed by a laser tracker + wait. At constant `cenx` the loop does not overshoot. +2. **The first move of a sequence double counts.** It applies the `cenx` + feed-forward jump (`0.7*Δcenx` since the last move, median 35 µm) and a + correction increment `-0.006*(V-e)` computed from a reading that already + contains that `cenx` lag. The sign of V flips after the first move in 12 of + 18 cases, e.g. V = -2.44 V with a +36.7 µm feed-forward jump and a +14.6 µm + correction step gives V = +1.82 V. A two-term fit suggests the true + feed-forward factor is nearer 0.8 than 0.7 (weak evidence, n = 18). +3. **Blind steps at the rail overshoot.** In four cases (12:25, 13:56, 18:42, + 19:04) a scan stop was followed by a reading pinned at -10.0 V. The loop + then made three fixed +60 µm moves (`0.006 * 10 V`), the reading flipped to + +10.0 V, and the laser tracker waited 37-100 s for the target. Twice the + wait exceeded 100 polls and raised + `RtError: Failed to reach laser target position`. +4. **`pid_x_correction` is lost on reload.** After the 19:30 device reload it + restarted from 0 (first PID part -0.009), while `fsamx` itself stayed where + it was. +5. **About 1 V of scan-to-scan alternation is unexplained.** Consecutive scan + points alternate high/low with a period of about 46 s. It was present all + day, including before the threshold change (08:00-08:30, 10:00-16:00). The + `cenx` and last-`fsamx`-position model leaves a residual of about 1 V + (R² 0.67 before 19:30, 0.30 after 19:36). This is a rotation-tomography + run: every scan point is a new `angle` and `cenx` follows it. +6. **The `Expected PID voltage` log line is commented out** + (`rt_flomni_ophyd.py:196`). The expected value only appears once per + restart as `Using PID voltage from rtx user parameter`. + +## The math + +Notation: `V` = PID voltage, `e` = expected voltage, `s` = stage response +(mm/V), `x` = `fsamx` position relative to `fsamx_in` (mm), `c` = `cenx`. + +Plant (fits the in-loop data to 0.18 V rms): + +``` +V - e = (x - x*(c)) / s, x*(c) = 0.7*c/1000 + drift, s ≈ 0.0134 mm/V +``` + +Current step: `Δx = -0.006 * (V - e)`, i.e. gain `g = 0.006` and per-step error +ratio `r = 1 - g/s ≈ 0.55`. To reach a residual `ε` from `V0` needs +`n = ln(ε/V0) / ln(r)` steps: 6 steps for 1.2 V → 0.05 V. + +Proposed step (Newton, damped): `Δx = -DAMP * s * (V - e)` with +`DAMP ≈ 0.85`. With a 15 % gain error the ratio is about 0.15, so 1.5 V → 0.03 V +in two iterations. `s` may be adapted from the last two iterations +(`s_est = Δx_prev / (V_prev - V_now)`), clamped to 8-20 µm/V. + +Double counting: on the first move `V - e` already contains `-(0.7*(c - c_prev)/1000)/s`, +which the feed-forward jump removes. Adding `-0.006*(V-e)` on top overshoots. + +## Proposed changes (all in `move_samx_to_scan_region`) + +1. **Newton step** as above instead of the fixed small gain. +2. **Remove the double counting.** + - **Option A (preferred):** compute the target from the actual position, + `x_target = x_now - DAMP*s*(V-e)`, and store + `pid_x_correction = x_target - 0.7*cenx/1000`, so the `cenx` lag is never + accumulated as drift. + - **Option B:** apply the feed-forward move first, re-read V, then correct. + Simpler, but costs about 1 s plus a tracker wait per correction. +3. **Derive `x_now` from the `fsamx` readback** instead of a running sum, so a + reload does not reset the bookkeeping. +4. **Clamp steps at the rail.** When `|V| >= 9.9`, cap the step at about 30 µm + and re-read instead of making blind ±60 µm steps. +5. **Hysteresis.** Start about 0.5 V, stop about 0.15 V (currently start 1.2 V, + stop 1.0 V, so the next `cenx` step re-triggers immediately). +6. **Logging.** + - Restore the `Expected PID voltage` line next to each `Current PID voltage`. + - Log `angle`, `cenx`, V and the `fsamx` readback per scan point. + - Log `laser_tracker_show_all()` output when `laser_tracker_wait_on_target` + times out (the tracker's beam position, target and piezo state are not + logged today). + +Sketch (not tested): + +```python +S, DAMP, FF, VCLIP = 0.0134, 0.85, 0.7e-3, 8.0 # mm/V, -, mm per cenx unit, V +x_now = fsamx.obj.readback.get() - fsamx_in # actual position (mm) +for _ in range(MAX_ITER): + v = self.get_pid_x() - expected_voltage + if abs(v) < V_STOP: + break + x_now -= DAMP * S * np.clip(v, -VCLIP, VCLIP) + fsamx.obj.pid_x_correction = x_now - FF * cenx # drift not explained by cenx + fsamx.obj.move(fsamx_in + x_now, wait=True) + time.sleep(0.1) + self.laser_tracker_on() +``` + +## What this will not fix + +The unexplained ~1 V scan-to-scan alternation (finding 5) is not addressed. A +0.05 V threshold would chase it with a move on nearly every scan point, and each +move costs a laser tracker wait. The plan therefore assumes about 0.15 V as the +stop level until the alternation is understood. + +## Verification (once approved) + +- **Offline replay:** run the proposed step logic against the logged + (V, `cenx`, position) sequences from 2026-09-18 and compare iterations per + correction and residual V with what happened. +- **Bench check:** on the instrument, force a known offset of about 2 V and + confirm convergence to below 0.15 V in at most 3 iterations with no sign + flip; repeat with about 5 V. +- **Rail case:** stop and restart a scan mid-way and confirm no ±10 V + overshoot and no tracker timeout. +- **Rate check:** confirm corrections per hour do not rise above the + 8.5/hour baseline. +- **Unit tests:** the step function should be a pure function so it can be + tested without hardware (see `tests/tests_devices`). + +## Open questions for discussion + +1. Is a threshold of 0.05 V realistic while the alternation is unexplained? The + plan assumes about 0.15 V for the stop level. +2. What is the true feed-forward factor: 0.7 (code) or about 0.8 (fit)? +3. Option A or B for the double counting? +4. Should the alternation be diagnosed first (angle dependence, backlash, the + `v0`/`v1` FZP feedback toggle) before any code change? +5. Is the 13.4 µm/V response stable across days? Only 2026-09-18 was analysed; + the rotated logs from 2026-09-11 to 2026-09-17 could be checked. +6. Should the already-made 1.2 V threshold change be kept, reverted, or left + until this is settled? It is currently uncommitted in the production working + tree.